Email: **********@*****.*** Mobile: +601********
1
James Juli MULY
No. 46, Lorong Hulubalang 10A,
Taman Sentosa, Fasa Dynasty
Klang, Selangor DE 41200, Malaysia
Mobile: +601********
Email: **********@*****.***
Executive Profile
Possess technical and management experience spanning over two decades in the civil, structural building construction and Upstream/Downstream oil & gas industry developments. Experienced in planning, sourcing, integrating material/vendor/supplier evaluation, inspection monitoring and total quality management interfaces. Notable achievements, acquired good knowledge in the provision and guidelines for ISO and OSHAS management & auditing systems. Performed audits to ensure the contractor’s Quality Assurance requirements are in place and followed. Demonstrated the ability to manage, motivate and build a cohesive team of discipline Engineers and Supervisors on site. Planned fresh concrete delivery onsite based on its current usage to ensure continuous supply. Familiar with ISO 9001 and 14001 project planning execution requirements in the construction and Oil & Gas industry.
Career Highlights
Handling various Engineering, Fabrication, Construction, Installation and Commissioning activities for both general construction and the Oil & Gas industry.
The works include Pre-FEED, FEED (Front End Engineering Design), Detail Design, Overall Contracting Strategy and EPCC Upstream - Downstream project developments.
Familiar with ISO 9001 and 14001 project planning requirements in the construction industry.
Performed various concrete mix design and production of G80 concrete performed in Kuala Lumpur City Center project.
Plan, strategize and performed audits to ensure the effective implementation of Quality Management System, Project Quality Plan, Control Procedures and work method statements. Professional Experience
SYARIKAT PEMBENAAN YTL SDN BHD
Project QAQC Manager 2023 to Date
Projects:
Electrified Railway Double Track from Gemas to Labis, Johor, Malaysia - Section 1 Managing construction works - developed project documents in Gemas to Labis for the construction of Double Track Railway System works. The Federal Government is building a preliminary 197km double track railway line linking Gemas to Johor Bharu. The project would be covering track works, yards, earthworks, hydrology, drainage, river training, soil improvements, retaining walls, viaducts, railway bridges, drainage culverts, roads, road over bridges, road under bridges, drainage culverts, pedestrian overhead bridges, vehicular box culverts, station and halts, quarters, deports, mechanical and electrical crossings, electrification of 25kV A.C. single phase and passenger information with CCTV systems and other ancillary works.
HYPERWAVE SYSTEMS ENGINEERING SDN BHD
Project QAQC Manager (Oil & Gas Industry) 2020 to 2022 Project:
Involved in Oil and Gas Jobs in Bintulu Processing Plant where Hyperwave Systems Engineering Sdn Bhd were appointed the main Contractor to undertake various task to perform maintenance works. Been Email: **********@*****.*** Mobile: +601********
2
actively assigned to Project Management role managing their staff for the world's third largest exporter of Liquefied Natural Gas (LNG). PETRONAS, Malaysia's national oil corporation owns majority interests in the three LNG plants in Bintulu, Sarawak. Natural gas is supplied to the plant from the gas fields in Central Luconia area located between 125km and 275km (South China Sea) offshore Bintulu, Sarawak. Performed field supervision of fabrication welding works in the Oil and Gas MLNG Petronas plant to ensure that the works are performed in accordance with PMP certification and AWS standards.
JX NIPPON OIL & GAS EXPLORATION (MALAYSIA) LIMITED Project QAQC Manager (Oil & Gas Industry) 2008 to 2020 Projects:
1. SK333 – Adong Kecil East, Miri, Sarawak, Onshore Oil and Gas Exploration 2. SK333 – Soil Investigation Study at Massalai, Miri, Sarawak, Onshore Appraisal Well Development 3. SK333 – Engkabang West, Miri, Sarawak, Onshore Oil and Gas Exploration 4. SK10 – Beryl Field Development, Miri, Sarawak, Onshore Oil and Gas Exploration 5. SK10 – Layang Field Development, Floating Platform Storage and Offloading Vessel (FPSO), Miri, Sarawak, Offshore Oil and Gas Production
Performed project management for Pre-Front End Engineering Design (Pre-FEED), Front End Engineering Design (FEED), Detail Fabrication Design, Field Development Plan, Milestone Review, Overall Contracting Strategy and EPCC Upstream & Downstream Projects development. Involved seriously in the construction of SK10 – Layang Field Development including fabrication and installation of line pipes for the platform. Manage welding works to AWS (American Welding Society) at the fabrication yard for Layang Field Development, Jacket and Platform (Performed in Sapura Kencana - Perak, West Malaysia).
Oversee the Quality Assurance/Control of Oil & Gas Production Sharing Contract (PSC) for Block SK333 Exploration of Onshore Well Drilling Campaign with the objective of determining and affirming the economic viability of hydrocarbon-bearing Gross Reservoir (hcbGRV) and SK10 Field Development, 85km northwest Miri in Sarawak waters under the Petronas Joint Operating Agreement (JOA). MUHIBBAH ENGINEERING BHD
Project QAQC Manager 2005 to 2007
Project:
Doha International Airport, Doha, Qatar – Catering Building Facility CP 21 Construction of Doha International Airport with its 8 cooking and 12 preparation kitchens, the three- story facility has the capacity to prepare and deliver 82,000 meals per day, providing meals and in-flight services to over 800 flights per day. The facility was designed to clearly define and maintain segregation of different hygiene zones with a focus on sanitation, food safety, and proper food handling procedures. These compartments include a hot and cold kitchen with specialized sub-kitchens for the preparation of Asian cuisine as well as a bakery/pastry kitchen.
The facility incorporates automated material handling systems, including aircraft trolley conveyor and storage systems, as well as an automated bin conveyor system with AS/RS (automated storage and retrieval systems) used for dishes, silverware and glassware. SETSCO PTE LTD
Construction Project QAQC Engineer 2003 to 2005
Project: Precast concrete tunnel lining production for the Mass Rail Transit (MRT) - client Land Transport Authority of Singapore
Lead, train, supervise and delegate a team of inspectors in all 3 manufacturing plants in Johor undertaking the operation cycle.
To ensure the manufacturing process conforms to the standard specification set by the client and reviewing through production processes for further improvement and greater efficiency. Email: **********@*****.*** Mobile: +601********
3
Attended underground (Tunnelling Works) site visits in Singapore for the installation of Packages C824, C825 & C826 respectively.
FOSROC SDN BHD
Sales Engineer 1997 to 2003
Division: Concrete Industry Division
Established concrete mix design in accordance to appropriate standards, technical report, code of practice and to recommend corrective actions on any variations.
Proposed concrete repair mechanism to clients where deem necessary conforming to appropriate standard specifications.
Distribute the product samples and for site used among customers within Malaysia, Singapore, Vietnam, Hong Kong and Thailand.
SAMSUNG KUKDONG JASATERA JV
QAQC Engineer 1994 to 1997
Project: Petronas Twin Tower Kuala Lumpur City Center
Liaison with the client’s representatives on site pertaining to concrete quality related issues.
Planned delivery of fresh concrete mixes for the main building structure based on its original design.
Inspections of cast concrete sections in the building itself which include; columns, Beams, floor and the core wall.
Co-ordination with the client’s representatives on sampling, testing and monitoring of raw materials for the production of high-performance mass concrete.
.
Educational Background
1. Bachelor of Science Degree – Civil Engineering, Year: 1988 To 1991 Newlands International College [collaboration with British City University], Ireland 2. Diploma – Civil Engineering, Year: 1985 To 1987 Federal Institute of Technology, Kuala Lumpur, Malaysia 3. Diploma – Business Management (Distance Education), Year: 1992 To 1994 Chartered Institute of Business Administration, Teoranta, Ireland 4. Award of Appreciation – Up 10 Movement KLCC Tower 2, Year: 1994 5. Certificate of Attendance for Grinding Aid, Year: 2002 6. Kursus Pertahanan Awam Malaysia, Year: 2007
7. Internal Environmental Audit Course, Year: 2008 8. Behaviour Observation Team, Year: 2009
9. Project Scheduling and Schedule Risk Masterclass, Year: 2013 10. Petroleum Exploration and Production, Year: 2013 11. CSWIP 3.1 – Welding Inspector Course, Year: 2013 12. CSWIP 3.2 – Senior Welding Inspector Course, Year: 2017 13. Authorized Entrant and Stand by Person for Confined Spaces, Year: 2016 14. O Tower CRCC – Quality Assurance & Control Exam, Year: 2017 15. Oil and Gas Safety Passport (OGSP) Level 2 OG057689S, Year: 2018 16. National Institute of Occupational Safety and Health (NIOSH), Year: 2018 17. KTMB 038 Personal Track Safety Card, Year: 2020 18. CIDB Card No. W41040720010004 – Construction Manager, Year: 2023 Hobbies and interests
Digital single-lens reflex (DSLR) general outdoor & indoor photography
Flying Paramotor in locations base on suitable conditions within Malaysia