Tellico Plains, TN *****
**********.**@*****.***
Bold Profile
SUMMARY
Knowledgeable leader with record
of accomplishment on diverse
construction projects. Translates
directives of architects,
constructions managers and clients
into actionable on-site directives to
consistently meet project demands.
Expert in tackling problems
head-on and maintaining strict
standards. An organized and
motivated individual, eager to
utilize time management and
organizational skills across diverse
settings. Seeking entry-level
opportunities to enhance abilities
while contributing to company
growth. Proactive and versatile
professional with a dedication to
quickly adapting to new challenges.
Strong problem-solving abilities
and a proven track record of
fostering strong relationships with
clients and team members.
Focused on supporting team
success and achieving positive
results.
SKILLS
• Nuclear multicraft experience
• Coal Plant experience
JASON HENRY
EXPERIENCE
September 2023 - Current
Carpenter Foreman (UPF /Y12) TJ Wies Oak Ridge Tn, Tennessee October 2017 - August 2023
Scaffold Carpenter GF (Plant Vogtle 3/4) Richmond County Constructors Waynesboro, GA
December 2016 - October 2017
Scaffold Carpenter GF( Plant Vogtle 3/4) Flour Waynesboro, GA June 2014 - December 2016
Scaffold Carpenter Foreman (Plant Vogtle 3/4) Chicago Bridge & Iron
Waynesboro, GA
• Inspected completed installations to verify conformance to standards.
• Delegated work to staff, setting priorities and goals. Reported project progress, site problems and labor status to supervisors.
•
• Obtained specifications and directed work for construction crews. Defined and monitored personnel and project schedules to ensure on-time project completion.
•
Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
•
• Established and sent daily work scopes/fronts to managers. Provided quality scaffolds for the project at Plant Vogtle 3/4, hitting multiple deadlines throughout the project.
•
Worked with multiple crafts on setting up work for the areas to work their job safely.
•
Had mentored employees, offering assistance and insight into completing job tasks when needed.
•
Inspected job sites to evaluate existing conditions and determine the type of scaffold needed for each project.
•
Maintained accurate documentation for all jobs, which include time sheets (Nova time)accident reports,meetings with clients and material information
•
• Familiar with all SNC/Bechtel Nuclear Safety Procedures. Developed work schedules and delegated crew assignments evaluating members and performance
•
• Prepared and planned worksites to help run smoothly Followed rules and regulations to keep job sites safe for workers, contractors,and visitors
•
Kept production team moving forward for progress in daily site operations.
•
Promoted speedy resolutions of conflicts and issues between team members by listening and communicating well with involved parties.
•
Followed OSHA and corporate safety regulations to avoid on-the-job injuries and accidents.
•
• Industrial carpentry
• Residential carpentry
• Project Management
• Safety processes and procedures
• Workforce Management
• Microsoft 360
• Navisworks Freedom 360
• Nova time timesheet
• Confined Space supervisor
LOTO Trained (Lock out- tag out)
Permit requester
•
• OSHA 10/30
Heavy Hitters 300 (UBC Building
Leadership for a strong future)
•
Trained on Insulated Concrete
forms/ Concrete forms
•
• TVA rigging certified
HARSCO scaffold erector/
inspector trained
•
• Clean rooms
Professional craftsman
woodworking
•
March 2014 - June 2014
Scaffold Carpenter (Watts Bar / Sequoya Nuclear) Days&Zimmerman Soddy, Tennessee
November 2011 - March 2014
Concrete Carpenter (Watts Bar/Alcoa) Correct Construction Alcoa, Tennessee
September 2012 - October 2012
Scaffold Builder (Cumberland TVA) GUMBK (Williams) Cumberland City, Tennessee
October 2010 - January 2011
Carpenter (TVA Kingston Steam Plant) Bowen Kingston, Tennessee October 2010 - January 2011
Carpenter (ORNL) Crom Oakridge, TN
January 2000 - November 2009
Carpenter Creative Remodeling and Design Tellico Village, Tennessee
• Worked efficiently at ground heights and at levels as high as 150 ft. Safely assembled and erected scaffolding structures, including ladders, platforms, walkways, guardrails, and handrails.
•
Inspected job sites to evaluate existing conditions and determine the type of scaffold needed for each project.
•
Provided scaffolding for outage/support Boilermakers in the ice condenser maintenance for the outages.
•
• Familiar with TVA's nuclear procedures and safety cultures.
• Installed forms for slabs and walls.
• Laid out foundations using a transit level, laser level, or string line. Collaborated with other tradespeople in order to complete projects efficiently.
•
Assembled and erected scaffolding components according to blueprints, drawings, and instructions.
•
• Inspected scaffolding for structural integrity prior to use.
• Assisted in the dismantling of scaffold structures after completion of job. Followed safety protocols such as wearing a hard hat, gloves, and steel-toed boots while working on high elevations.
•
• Constructed forms for concrete pours in accordance with building codes. Read blueprints, schematics and drawings to determine layout requirements.
•
• Erected scaffolding to assemble above-ground structures.
• Installed forms/scaffolding for a 1.5 million gallon water tank.
• Set up airlines for a mobilized scaffolding for concrete blasting. All residential/ commercial remodeling framing,siding,window/door installation, under deck water control systems
•
• Custom trim work for cabins
• Screen room/ sun rooms
EDUCATION AND TRAINING
May 1997
High School Diploma
Loudon High School, Loudon, TN
REFERENCES
References available upon request.