Jeff Skoien
Superintendent/Foreman/Journeyman Carpenter
************@*****.***
** ***** ** ********** *******, Drywall Applications, Layout 4 Years as a Foreman
Overseeing and participating in the steel stud and drywall construction of numerous TI projects. This includes onsite and offsite coordination with all construction trades involved in the building process. Implementing strategies for efficient and cost effective building and scheduling, installation of new green building practices and waste management solutions, and a strict safety culture are what I strive for on my jobsites. Projects
Pooles Construction Inc.
October 2008 - 2014, 2017 - Present
I started my construction career with PCI as a stage one apprentice and moved my way up in the company throughout the years working closely with experienced foreman and superintendents in the field. I became a foreman in 2018 and have run a number of projects ranging from small TI office remodels to large multi floor build-outs with an emphasis on safety, efficiency, open communication, and customer service. Foreman and/or Lead Man on the following projects:
● LA CARE ( Inglewood, Wilmington, Los Angeles )
Interior layout with a focus on accessibility for building trades
Interior steel stud framing, drywall, plywood, and wood fire-blocking
Exterior window and door framing including overseeing installation of door and window frames
Reception/Customer service counter layout and framing installation, including coordination with window, countertop, and millwork installation with strict adhesion to ADA guidelines for accessibility
● Honey.com in DTLA Arts District
Lead Man overseeing interior framing and layout
Framing and Drywall Ceilings for all bathrooms
Fire Rated soffits in stairwells
● Nordstrom Rack (Lakewood, Beverly Hills)
Lead Man overseeing interior framing and layout
Perimeter Soffit planning and framing
Exterior lathe framing and installation
● Platinum Equity
Foreman on 1st, 2nd, and 3rd floor office remodel.
Heavy emphasis on layout and building trades coordination
Kitchen and Conference rooms remodeled.
High quality level 5 finishes in occupied space.
Daily dust and waste management
● Wells Fargo ( Newport)
Foreman for TI office project
● SWCTF San Diego Training Center (As a Superintendent)
Superintendent and Framing Foreman
Scheduling and coordination of building trades and the SWCTF Martin Brothers Marcowall Inc.
June 2014 - 2017
Multiple TI and new construction projects involving a wide array of coordination between building trades and off site architects and designers. I took a particular interest in the implementing of a new safety culture and strategies for on the job safety during the Neutrogena and Riverside Community Hospital projects. Foreman and/or Lead Man on the following projects:
● USC - Jill & Frank Fertitta Hall
Interior ClassroomWallandSoffitFraming
2nd Floor Deck Fire-proofing
South Side Roof Interior Framing
Stairwell Vestibule Framing
● Riverside Community Hospital
Exterior Framing
HVAC Shaft framing and drywall
Elevator Shaft framing and drywall
Nurse’s Station Prefab framing installation
Roof Framing and Densglass installation
● LAX Terminal 3
● Beverly Center
● Neutrogena Shutdown 2015
Nevell Group Inc.
May 2014 - June 2014
● Columbia Square Project
Stairwell Framing
3rd Floor Restroom Layout and Framing
Education
● John A. Rowland High School
2000 - 2004
Construction Technology Elective 2003
● Carpenters Apprenticeship Program
October 2008 - October 2012
Focus on framing and layout
Certifications Scaffold User/Erector
Fall Protection, Aerial Lift/Scissor Lift
Powder Actuated Tool
OSHA 10
First Aid
CPR
(OSHA 30 and Construction Management Degree pending)