DEOVANE JASSON
CONTACT
*************@*****.***
East London 5200
PERSONAL DETAILS
Date of Birth : 23 October
1991
Marital
Status
: Single
Nationality : South African
Gender : Male
Driving
Licence
: Code 08
ID Number : 911***-****
080
SKILLS
Communication Skills
REFERENCE
Andre Muller - SKG Power
Site Foreman
Raymond Thomas - Bark
Electrical Contractors
Director
********@*********.**.**
Att Nel - SolarOn
Company Director
***@*******.**.**
07 June
2023 -
Till to
date
01 May
2023 - 30
May
2023
01
February
2018 - 30
October
2020
01 June
2018 - 15
December
2018
01 July
2019 - 15
December
2019
2024
2023
2023
2018
2017
EXPERIENCE
Electrician
Bark Electrical Contractors
Do Electrical, Photovoltaic C.O.C
testing,alterations, extensions, inspections
and Installations on Commercial and
Residential.
Electrician
Solar On
1 Month on Practical Photovoltaic
Installations Training
Electrician
SKG Power
Do Electrical C.O.C Testing, Inspection,
Alterations, Extensions and Installations on
Residential, Commercial and Industrial
Electrical Installations
Student
Osner Construction
Electrical workplacement on Residential
Installations
Panel Builder
Fibre Glass Shop
Build electrical switch distribution boards
for Residential, Commercial and Industrial
Installations.
EDUCATION
Currently busy with Installation Rules
Buffalo City TVET College
Trimester 2
Single phase tester
MSC Artisan Academy
Pv Solar
ELECTRICAL CONTRACTORS ASSOCIATION
Trade certificate(Electrician Construction)
MSC Artisan Academy
Further Education and Training Certificate:
Electrical Engineering
MSC Artisan Academy
NQF Level 4
2016
2015
2011
National Certificate: Electrical Engineering:
Renewable Energy
MSC Artisan Academy
NQF LEVEL 3
National Certificate:Electrical Engineering:
Renewable Energy
MSC Artisan Academy
NQF Level 2
Matric Certificate
Alphendale Technical Secondary School
Grade 12
PROJECTS
1. Zf Lemforder and Voestalpine Automotive Components East London(Industrial Development Zone)
Electrical Engineering Installation : SKG POWER
(Time frame for completion of projects was 10 months) Experience Obtained :
1. Earting & Bonding of the building foundation and Structure. 2. Installation of cable sleeves,cable trays,cable ladders,trunking and tubing of conduit.
3. Pulling in power cables and wiring for the whole project 4. Installing Distribution boards from 63A up to 800A 3phase. 5. Termination of Main,Sub Distribution Boards and jointing of power cables from 2,5mm up to 240mm square.
6. Working on boom lifts to install overhead factory lighting and install overhead cable trays +power cables.
7. Installing & Tubing LV single phase and three phase socket outlet, power skirting, lighting,wiring and switching components for office block
8. Reading and Installing electrical installation from the engineering technical drawings.
Commercial Office Blocks( Multiple locations)
Electrical Engineering Installation: SKG POWER
( Timeframe for completion of project varies from 3 to 6 months)
Experience Obtained:
1. Stripping out old electrical Installation Components. 2. Installing New Electrical Installation Components. 3. Reading and Installing electrical equipment from Technical Electrical Engineering Drawings.
4. Test and Inspect new electrical Installation Under Supervision of the Site Forman
5 . Termination and jointing of power cables from 2.5mm up to 120mm square.
6. Installing trunking, conduits,power skirting,main and sub distribution boards,lighting and all other electrical components.
7. Termination Distribution boards from 63A up to 200A single phase and three phase.
8. Chopping and chasing for conduits.
9. Do Maintenance and repair work on different office buildings.
10. Design and install extension for add ons
Amalinda Downs Residential Development.
Electrical Engineering installation: SKG POWER
( Timeframe is an ongoing project)
Experience Obtained:
1. Digging trenches and pulling in power cables for street Distribution Kiosks.
2. Termination of Power Cables at Street Kiosks
3. Chassing and Chopping for tubing of conduits.
4. Wiring of Residential Installation from Technical Electrical drawings
5. Installing Electrical components for Residential Installation 6. Test and Inspect Residential Installation individually. 7. Do Safety File and Tool box Talks on daily basis for the Residential Site.
8. Attend Site Meetings
Beacon Bay Crossing parking Bay.
Electrical Engineering Installation: SKG POWER( Timeframe of project is a ongoing project)
Experience Obtained:
1. Tubing of decking of conduits for the installation of car bay lightning,fire detection
2. Test and Inspect Temporary distribution Kiosks on a weekly basis.
3. Do safety File and tool box talk.
4. Read and do Installation from Technical electrical drawings 5. Installing Cable ladders and pull in power cables for different Distribution boards.
6. Termination of cables and Distribution boards.
7. Attend Site meetings
MMDP Quantity Surveyors and Project Managers Office Block and EGas Distributers Specialized Installation.
Electrical Engineering Installation: Bark Electrical Contractors CC
( Timeframe for Completion of projects 4-6 months) Experience Obtained:
1. 3 Phase Electrical Installations
2. Tubing and Wiring of all Electrical components
3. Installation of single phase and three phase solar inverters with solar panels. 8-12 KVA systems.
4. Test and Inspect C.o.C for Electrical Installations 5. Test and Inspect C.o.C for SSEG Installations . 6. Do Specialized Installation for Hazardous Goods Storage Location.
7. Test and Inspect Single phase Residential Installations.