Resume
Suresh.k
UTILITY POWERTECH LIMTED (A JV OF RELIANCE INFRASTRUCTURE LTD AND NTPC LTD)
NTPC Tamilnadu Energy Company Ltd.[3*500MW]
Mob- +944*******,790-***-****
Email- ***************@*****.***
sureshelango85gmail.com.
OBJECTIVE :- To use my skills to blend leadership and management for growth of organization. EDUCATION QUALIFICATION:-
Qualification Year of Passing Institution % of marks Bachelor’s degree in Mechanical
Engineering
2008-2011 Magna Engineering college 59%
Diploma in Mechanical Engineering 2005-2008 cpcl Polytechnic College 59.71% High School Certificate Examination 2004-2005 j.g.govt.hr.sec.school 75% EXPERIENCE DETAILS:-Total 9 years 10 month working Experience in Power plant project.
BOILER MAINTENANCE
Organization UTILITY POWERTECH LIMTED (A JV OF RELIANCE INFRASTRUCTURE LTD ANDNTPC LTD), NTECL (NTPC Tamilnadu Energy Company Ltd.[3*500MW] ).
Period June27, 2014on joining working
Designation Mechanical engineer
Job nature MECHANICAL MAINTENANCE:
CLINGER GRINDER,FEED GATE,GLOBE VALVE,PLUG VALVE, maintenance work for 3* 500MW BOILER AT VALLUR THERMAL POWER STATION, CHENNAI (3X500 MW). Location PO- Vellivoyal chavadi,ponneri taluk,
Thiruvallur Dist,Chennai Pin 601203,
Tamil Nadu, India.
ASH HANDLING MAINTENANCE
Organization UTILITY POWERTECH LIMTED (A JV OF RELIANCE INFRASTRUCTURE LTD ANDNTPC LTD), NTECL (NTPC Tamilnadu Energy Company Ltd.[3*500MW] ).
Period till date
Designation Engineer mechanical maintenance
Job nature MECHANICAL MAINTENANCE:
Centrifugal pumps,ash water pump house,ash water return pump house, ahp boiler maintenance JOB RESPONSIBILITY :-
ASH HANDLING
MAINTENANCE
As such. It is advisable to keep and follow through with maintenance as well as coarse on slurry pump Quality of project.
Clinger grinder any bearing abnormal sound to repair maintenance on workshop to new bearing Ash water return pump house Any pipe line leakage to attend new pipe line replacing or patch welding Perpetration of agenda point for various project meeting like Project review Team Meeting,Contracts review meeting etc.
WORK ACHIEVEMENT/ACCOMLISHMENT:-
BOILER HYDRO TEST UNITIII 500 MW boiler hydro test Completed in successfully at NTPCTamilnadu Energy Company Ltd.[3*500MW] )
WATER PUMP HOUSE FAHP pump, balp pump, bahp pump,flushing pump, PRESSURE PARTS Drum life-ting top headers, Water wall Panel, super heater coil, super –heaterPanel & bottom header, Furnace alignment.5591.60MT Per unit.
CLINGER GRINDER A clinger grinder is a ash conveying system where coarse bottom ash or other coarsely sized material must be reduced in size for ash handling
PIPING 500nb 300nb basalt pipes and Ms pipes used.(MS, basalt) DUCTING Handled duct Erection & ATT of boiler & ESP, incuding supports (inside,Outsiderestraint Hanger), Manhole Door & kerosene test.
OTHER Boiler mounting and accessories
TESTING Hopper filling the water to check boiler for zero meter, open the feed gate clinger grinder to mix the ash disposal to slurry pump.
JOB RESPONSIBILITY :-
MAINTENANCE
I have been entrusted the responsibility to handle maintenance of 3X500 MW thermal power plant I am actively involved and responsible for preventive and predictive maintenance jobs, managing Breakdown and attended Shut downs, tube Failure and Over
To ensure plant and machinery availability & Attending day to day breakdown Why analysis on repeated breakdowns & TPM and 5s activities in work area Maintain the major & minor machines spare with drawings, finding root cause for repeated Breakdowns & check weekly maintain records on machine condition. WORK ACHIEVEMENT/ACCOMLISHMENT:-
PRESSURE PARTS
Attending Boiler Tube Leakage.PM jobs for Wall blowers. Oil guns, LRSB.HFO&LDO Oil pump house Maintenance. Arresting steam leakages in the flanges. Pipelines valves Replacing and servicing of HP Valves ( safety valves, plug valves Gloiclesbe valves).SADC Dampers, alignment, Replacing. Oil and coal burners and services. Spring loaded services.
ASHWATERRETURN
PUMP HOUSE
Ash handling and ash water recirculation system sub consist the following a ]Ash water and ash recirculation system package b] bottom ash economizer handling system SLURRY PUMP
A slurry pump is a type of pump designed for pumping liquid containing solid particles . slurry pump h changes in designed and construction to adjust to multiple type of slurry which varies in concentration of solids,size of solids,weight of solids,shape of solids and chemistry. Maintenance work for 3* 500MW BOILER AT VALLUR THERMAL POWER STATION, CHENNAI(3x500) Location PO- Vellivoyal chavadi,ponneri taluk,
Thiruvallur Dist,Chennai Pin 601203,
Tamil Nadu, India.
OTHER INFORMATION:-
AWARD RECEIVED volley ball
INDUSTRIAL VISITS
Chennai petroleum corporation ltd industrial visit, COLLEGE PROJECT
Diploma project.swivel baseCut of machine (2008) . Engg project. trolly bench painting robot (2011).
Automatic wind screen wiper(2011)
PERSONAL PROFICIENCY Presentation skills, Ability to manage resources in least time and a team player, Hard Working, good learner,
PERSONAL INFORMATION:-
Father Name Kothandaraman .e
Date of Birth 18.09.1989
Religion Hindu
Nationality Indian
Gender Male
Marital status single
Languages known English, Tamil.
Permanent Address 96/47,
perumal koil street,madhavaram,Chennai-600060
DECLARATION:-
I hereby declare that the information given above is true to the best of my Belief Date: Yours sincerely
Place k.suresh