CURRICULUM VITAE
PERSONAL DETAILS
SURNAME: ABAIDOO
NAME: JONATHAN KWESI
PASSPORT NUMBER: G3190202
DATE OF BIRTH: 7th March, 1976
SEX: Male.
MARITAL STATUS: Married.
DEPENDANTS: Three (03)
NATIONALITY: Ghanaian
LANGUAGES SPOKEN: English and Fanti
HOBBIES: Football, Reading, listening to music, and Traveling. CONTACTS: +27-728-***-*** and +243-***-***-***
E-MAIL: **********@*****.***
ACADEMIC BACKGROUND
TERTIARY EDUCATION
PROJECT MANAGEMENT INSTITUTE (PMI)
Project Management Professional (PMP) - Sept. 2017 – Feb 2019 PMI membership number: 5443797
PMP certificate number: 2315818 – in good standing. TAKORADI TECHNICAL UNIVERSITY – GHANA
Construction technician certificate, part one (Nov. 1996 - June 1997) General course in construction certificate (Nov. 1994 - June 1996). SECONDARY EDUCATION
GHANA NATIONAL COLLEGE, CAPE COAST - GHANA
General Certificate of Education, Ordinary level (September 1989 - June 1994) EMPLOYMENT HISTORY
(a) YEAR: Nov 2020 – To date
COMPANY: TEICHMANN PLANT DRC (KONGO RIVER)
PROJECT: KAMOA KAKULA MINE
POSITION: Earthworks Site Agent
RESPONSIBILITIES:
Construction of Kamoa tailings storage facility (TSF) dam raise 3 & 4.
Construction of all platforms for Kakula concentrator plant (Phase 2)
Construction of plant concentrate dam and various ponds.
Prepare monthly payment certificate.
Prepare weekly progress report
General site management.
(b) YEAR: April 2019 – Nov 2020
COMPANY: TEICHMANN PLANT DRC (KONGO RIVER)
PROJECT: KAMOA KAKULA MINE
POSITION: Senior Surveyor & Acting Earthworks Site Agent RESPONSIBILITIES:
Construction of platforms for Kamoa housing extension project.
Construction of all platforms for Kakula concentrator plant (Phase 1)
Construction of plant concentrate dam and various ponds.
Construction of truck tip maccaferri retaining wall.
Prepare monthly payment certificate.
All underground civils surveying.
Prepare weekly progress report.
General site management.
(c) YEAR: Nov 2012 – March 2019
COMPANY: TEICHMANN PLANT DRC (KONGO RIVER)
PROJECTS: Randgold Resources - Kibali Gold mine. And Alphamin Bisie Mining POSITION: Senior Surveyor
RESPONSIBILITIES:
General Site management.
General Surveying (including prepare all survey data for setting out and levels).
Prepare monthly payment certificate.
Construction of floatation & concentrate tailings storage facility (TSF) dam.
Construction of return water dam.
Construction of storm water diversion channel. Including the catchment dam.
All survey works for Ambarau hydro power project.
All survey works & management of Mofu, Pakaka and Kombokolo open pit mining.
Prepare final as-built drawings using model maker and road maker.
(d) YEAR: March 2012 – Nov 2012.
COMPANY: TEICHMANN PLANT DRC.
PROJECT: Boss Mining Concentrator project surface infrastructure in D.R. Congo. POSITION: Senior Surveyor
RESPONSIBILITIES:
General Surveying.
Prepare all survey data and setting out and levels of the following projects; 1. Process water pond
2. Storm water dam
3. Conveyor belt terrace with culverts and storm water channels. 4. Plant site terrace including buried services (sewer line, potable water line and fire water line). 5. Camp housing construction survey including buried services (sewer and potable water lines). 6. Reinforced earth retaining wall construction for crusher bulk fills.
Final as-built survey.
(e) YEAR: July 2009 – March 2012.
COMPANY: TEICHMANN PLANT ANGOLA.
PROJECT: 150 KM Road Construction from Caiundo to Savate in the Republic of Angola. POSITION: Senior Surveyor
RESPONSIBILITIES:
General Surveying.
Prepare all survey data for setting out and levels.
Process measurement of works for monthly certificate.
Establishment of survey control points.
Monitoring of setting out and levels on site.
Prepare final as-built drawings using model maker and road maker.
(f) YEAR: Feb 2009 – July 2009
COMPANY: WBHO – GHANA
PROJECT: Newmont Ghana Gold Mine – Ahafo Project
POSITION: Surveyor
RESPONSIBILITIES:
Construction of the tailings storage facility (TSF) Dam Stage 5&6.
Construction of Sediment Control Dams.
Construction of mine haul roads.
Decant tower, Drains, Tailings and decant return lined trenches.
Amoma open pit development.
(g) YEAR: April 2008- Feb 2009
COMPANY: WBHO – INTERNATIONAL
PROJECT: Tenke Fungurume Mine (TFM) – Democratic Republic of Congo. POSITION: Surveyor
RESPONSIBILITIES:
Surveyor in charge of Plant Site Platforms, Permanent Housing Village (Bravo camp) and Plant Site Civil works.
Process measurement of works for monthly certificate.
Prepare final as-built drawings using model maker and road maker.
(h) YEAR: Feb 2007- Mar 2008
COMPANY: BANLAW AFRICA LTD – GHANA
PROJECT: Goldfields Ghana LTD - Tarkwa
POSITION: Surveyor
RESPONSIBILITIES:
Surveyor in charge of Tailings Storage Facility (TSF) No. 2, Decant towers, Tailings and decant return platforms and sediment control dams.
Surveyor in charge of Tailings Storage Facility (TSF) No. 1 - stage 3 raise, Decant towers, Tailings and decant return platforms and sediment control dams.
Process measurement of works for monthly certificate
Establishment of survey control points.
Prepare final as-built drawings using model maker and road maker.
(i) YEAR: June 2005 – Jan 2007
COMPANY: BANLAW AFRICA LTD – GHANA
PROJECT: Newmont Ghana Gold - Ahafo
POSITION: Surveyor
RESPONSIBILITIES:
Construction of Raw, Process, and Event water ponds.
Construction of haul road with pipe culvert.
Construction of Tailings and decant return lined trenches.
Sediment control dam expansions.
Establishment of rock crusher site.
Process measurement of works for monthly certificate.
Prepare final as-built drawings using model maker and road maker.
(j) YEAR: Feb 2003 – June 2005
COMPANY: INTERBETON BV – GHANA
PROJECT: Construction of quay two extension of Tema harbour – Ghana. POSITION: Surveyor
RESPONSIBILITIES:
Set out and levels for construction of Gantry crane railway including parking area, water and fire hydrants.
Check levels, alignment, and install precast concrete block for quary wall.
Set out and levels of screed beam frame for under water lean concrete.
Checking of underwater gabion elevation (sounding).
Final as-built survey.
(k) YEAR: Mar 2001 - Dec 2002
COMPANY: KAJIMA CORPORATION – GHANA
PROJECT: Construction five (5) bridges in Ghana.
POSITION: Surveyor
RESPONSIBILITIES:
All survey works for the bridge construction, including H-beam, sheet piles, and approach roads.
Site management
Final as-built survey.
(l) YEAR: July 1999 - Dec 2000
COMPANY: MOTA & COMPANHIA – GHANA
PROJECT: 62KM Awaso – Bibiani - Nobekaw road construction in Ghana. POSITION: LEVELLER (ASSISTANT SURVEYOR)
RESPONSIBILITIES:
Fixing of levels for common fill, formation, sub base, base course, bridges, pipe and box culverts.
NGL, topsoil strip surface, sub base and base course cross sectional survey.
Bench mark level checking.
(m) YEAR: Nov 1997 - Oct 1998
COMPANY: KOCKS CONSULT – GHANA
PROJECT: 62KM Awaso – Bibiani - Nobekaw road construction in Ghana. POSITION: STUDENT TRAINEE (INTERNSHIP)
Engineering Software and Instruments
AutoCAD, Model Maker, Road Maker, Multisurv, Logger, Trimble Office Geometrics, Trimble GPS, Leica viva GNSS GPS, Sokkia V30 GPS, Total stations, Dumpy levels and Rotating lasers. Other Computer software
MS project
Power point
Excel
Word
MS outlook