Post Job Free
Sign in

Power Distribution Electrical Project

Location:
Denver, CO
Salary:
35
Posted:
January 14, 2025

Contact this candidate

Resume:

Esequiel Ibarra Valle ***** E. Severn Place

Aurora, Colorado 80011

720-***-**** (C)

************@*****.***

Summary

I am a hard working electrician and have 14yrs+ of hand on experience working in commercial, residential and Industrial Settings. I work well with others to help diagnose and solve problems in the fields. Most of the commercial/industrial projects were ground-up, tenant finishes, hospital’s and oil refineries. Residential projects, I’ve been a part of projects consisting of mainly multi family dwellings and residential service calls. As a lead Electrician and foreman I was responsible with the planning and layout of different projects. Such as personnel layout and proper planning of every step of an electrical project such as rough-in, equipment layout, roof top layout, site lighting layout, one line and punch-list at the end of project. During projects I was responsible for supervising 2-8 electricians during the construction process. I also was responsible for ordering parts and material and making sure the job was stocked with material to make sure we were able to complete daily tasks and stay on schedule. I take pride in seeing the jobs threw from beginning to the end. While making sure that everything I do is to the best of my abilities and make sure that everybody goes home safe. I also have 3+ years doing maintenance and service for contractors and the Denver Broncos. Work Experience:

RK Electric- Aurora,CO 08/2023 - 06/2024

Project Supervisor

Provided general electrical repairs

Assigned manpower according to individuals’ skill set.

Contributed to the design of blueprints for power distribution skids.

Supervised planning, layout and installation of power distribution skids equipment.

Coordinated installation process with electricians for both customers bitcoin- mining trailers and power distribution skids.

Orchestrated the procurement of parts and materials for fabrication, ensuring readiness for current and future skids and trailers.

Ensured compliance with NEC quality control requirements.

Assisted in designing an assembly line system for construction of the bitcoin- mining trailers and power distribution skids, including lines for: 1. Wire pulls for main distribution cabinets

2. Landing and crimping main lugs in MDS

3. EMT pipe runs

4. Medium voltage termination

5. Medium voltage megging

6. Fire alarm and lighting/power

7. service feeders

8. UPS cabinets installation

9. server cabinets

10. electrical panel layout and installation.

Tradesmen/Outsource– Boulder, CO 03/2020 - 06/2023 Site Electrician

Installed new electrical outlets

Installed ” through 3” PVC and EMT

Pulled wire

Roughed-in Romex for apartment units

Installed underground PVC piping

Installed direct burial cable

Installed site lighting

Installed strip lighting

Installed and unit panels for apartment units

Installed can lighting – surface and recessed

Retro fitted lighting

Bent pipe using foot benders ” – 1 ” – (very experienced)

Installed electrical for pools and other outdoor water works

Did all rough in commercial and residential

Supervisor of two crews with three electricians on each crew

Installed transformers single phase to three phase “75KVA to 1000KVA”

Installed cable tray

Electrical planning and layout

Expert at trouble shooting

Sturgeon Electric – Denver, CO 02/2016 - 03/2020

Electrician

Provided general electrical repairs

Installed new electrical outlets

Installed conduit ” through 3”

Pulled wire with and with-out tuggers 4/0 AWG - 1000KC MIL

Roughed-in MC

Installed underground PVC piping

Installed direct burial cable

Roughed-in outside and in door lighting

Installed can lighting – surface and recessed

Retro fitted lighting

Bent pipe using table bender 1 ” through 3”

Bent pipe using foot benders ” – 1 ” – (very experienced)

Installed electrical outdoor water works

Did all roughed-in commercial

Installed transformers single phase to three phase “75KVA to 1000KVA”

Installed cable tray

Electrical planning and layout

Expert at trouble shooting

Intermountain Electric – Denver, CO 04/2014 - 02/2016 Electrician

Provided general electrical repairs

Installed new electrical outlets

Installed conduit ” through 3”

Pulled wire with and with-out tuggers 4/0 AWG - 1000KC MIL

Roughed-in MC

Installed underground PVC piping

Installed direct burial cable

Roughed-in outside and in door lighting

Installed can lighting – surface and recessed

Retro fitted lighting

Bent pipe using table bender 1 ” through 3”

Bent pipe using foot benders ” – 1 ” – (very experienced)

Installed electrical outdoor water works

Did all roughed-in commercial

Installed transformers single phase to three phase “75KVA to 1000KVA”

Installed cable tray

Electrical planning and layout

Expert at trouble shooting

Duro Electric – Englewood, CO 05/2011 - 03/2014

Electrician

Provided general electrical repairs

Installed new electrical outlets

Installed conduit ” through 3”

Pulled wire with and with-out tuggers 4/0 AWG - 1000KC MIL

Roughed-in MC

Installed underground PVC piping

Installed direct burial cable

Roughed-in outside and in door lighting

Installed can lighting – surface and recessed

Retro fitted lighting

Bent pipe using table bender 1 ” through 3”

Bent pipe using foot benders ” – 1 ” – (very experienced)

Installed electrical outdoor water works

Did all roughed-in commercial

Installed transformers single phase to three phase “75KVA to 1000KVA”

Installed cable tray

Electrical planning and layout

Expert at trouble shooting

I.E. Electric – Centennial, CO 02/2009 - 04/2011

Electrician

Provided general electrical repairs

Installed new electrical outlets

Installed conduit ” through 3”

Pulled wire with and with-out tuggers 4/0 AWG - 1000KC MIL

Roughed-in MC

Installed underground PVC piping

Installed direct burial cable

Roughed-in outside and in door lighting

Installed can lighting – surface and recessed

Retro fitted lighting

Bent pipe using table bender 1 ” through 3”

Bent pipe using foot benders ” – 1 ” – (very experienced)

Installed electrical outdoor water works

Did all roughed-in commercial

Installed transformers single phase to three phase “75KVA to 1000KVA”

Installed cable tray

Electrical planning and layout

Expert at trouble shooting

Denver Broncos Football Club – Centennial, CO 05/2005 - 01/2009 Maintenance

Education: Hinkley High School Diploma

CITC Trade School

S.T.A.R.T. Supervisor Training

S.T.A.R.T. Supervisor Training - Accident Reduction Techniques OSHA 10 and OSHA 30

Pneumatic Ram Set Certification

Boom Lift and Scissor Lift Certifications

Confined Space Certified

Forklift Certified



Contact this candidate