RYAN MCLEAN
**** ****** ***** ***, **** Kelowna, BC, V4T 2X6
PH: 1-778-***-****
Email: **********@*******.***
Professional Summary
Professional trades person with excellent interpersonal skills. Works in a timely and efficient manner to see tough jobs through to completion.
Skills
Mechanically inclined
Able to communicate with others
Problem solver
Safety procedures knowledge
Attention to detail
Professional
Very approachable
Team leader
Hard working
Respectful to all trades
Work History
September - 2009 to October 2009
Pipefitter
Transfield Services Fort McMurray, AB (Suncor)
Summer turnaround for plant 25. Tasks included blank and blinding, bolt- up, rigging and commissioning during start-up.
January 2010 to June 2010
Pipefitter
Brymark Installations North Vancouver, BC (Canexus Chemical) Erecting of new plant. Tasks included punching and moaning, hydrostatic testing, fabrication of spools, rigging, mill scale removal and re - re of old systems. June 2011 to August 2011
Pipefitter
Canadian Industrial Maintenance Services ( CIMS) Port Melon, BC ( pulp & Paper) Summer turnaround. Task included washing out of old valves and the installation of refurbished ones.
June 2012 to December 2012
Pipefitter
Lockerbie and Hole Eastern Fraser Lake, BC ( Endako Mine Expansion) Erecting of new plant. Task included Fabrication of large bore pipe, installation of spools, rigging and commissioning.
January 2013 to February 2013
Lockerbie and Hole Northwest, Kitimat, BC (Rio Tinto Alcan) Pipefitter
Erecting of steam boiler. Task included heavy rigging, designing of piping system, spool fabrication and live tie-ins.
February 2013 to April 2013
Lockerbie and Hole Northwest, Coquitlam, BC ( UV Treatment Plant) Pipefitter
Erecting of new plant. Task included fabricating and the installation of large bore spools (10’), heavy rigging, hydrostatic testing and commissioning.
May 2013 to June 2013
Ipac Services Fort McMurray, AB ( Grizzly Oil Sands ) Pipefitter
Erecting of new mods. Task include fabrication of small bore piping, rigging, punching and moaning and designing of piping systems.
June 2013 to April 2015
Pcl Energy
Pipefitter General Foreman
Overseeing the construction in both green/brown fields. Ensuring construction deadlines are achieved and done with a professional attitude.
May 2015 to June 2015
Quinn Contracting
Pipefitter
P.E.2 turnaround. Fabricating small bore spools and bolt-up. July 2015 to January 2016
Stuart Olsen
Pipefitter
Fabrication of both large and small bore spools.
February 2016 to December 2017
Ledcor
Fabrication and installation of both large/small bore piping. Hydro testing and re-installing piping systems. February 2017 to December 2017
Aecon
100 Mile Compressor Station
Fabrication and the installation of large bore (42”) carbon pipe February 2018 to July 2018
Aecon
Wabasca Compressor Station
Fabrication and the installation of large bore (42”) carbon pipe July 2018 to August 2019
Aecon
Compressor Station and fabrication and the installation of large bore (42”) carbon pipe September 2019 to December 2019
L&L Oilfield Services Ltd
Servicing wellheads, installing wellheads and all aspects of all turnaround maintenance February 2020 to June 2020
Tradesman Ent
Teck Coal Mine
Installation of both large/small bore pvc piping
August 2020 to December 2020
Bird Construction
Compressor Station
Installation of large bore (36”) carbon pipe
January 2021 to July 2021
Cord Industrial
Cnrl
Fabrication and the installation of large bore (36”) stainless piping August 2021 to December 2021
Cord Industrial
Keyera Sulphur Plant
Installation of FRP piping
February 2022 to December 2022
Ocl Group Ltd
Teck Coal Mine
Foreman
Overseeing the construction of multiple pumping stations throughout the lease March 2023 to April 2023
Dcm Group Ltd
Syncrude
Foreman
Overseeing all construction associated with all turnaround maintance May 2023 to October 2023
Primoris Construction
Kitimat Lng
Installation of both large/small bore stainless piping January 2024 to August 2024
Thermal Design Ltd
SAGD
Measure and cut pile caps and the installation of mods October 2024 to November 2024
Ocl Group Ltd
Cenovus Energy
Installation of large bore carbon pipe(bolt-up)
Hi-torque
November 2024 to December 2024
Boom Construction
Compressor Station
Jack and roll of instrumental equipment
Certification
Red seal steam fitter certification
Red seal plumbing certification
B gas fitter certification
09 csts
Level 1 first aid
Current WHIMIS and hearing cards
Confined space training certificate
H2s alive certificate