Post Job Free
Sign in

Team Leader Fort Mcmurray

Location:
Maple Ridge, BC, Canada
Posted:
January 08, 2025

Contact this candidate

Resume:

RYAN MCLEAN

**** ****** ***** ***, **** Kelowna, BC, V4T 2X6

PH: 1-778-***-****

Email: **********@*******.***

Professional Summary

Professional trades person with excellent interpersonal skills. Works in a timely and efficient manner to see tough jobs through to completion.

Skills

Mechanically inclined

Able to communicate with others

Problem solver

Safety procedures knowledge

Attention to detail

Professional

Very approachable

Team leader

Hard working

Respectful to all trades

Work History

September - 2009 to October 2009

Pipefitter

Transfield Services Fort McMurray, AB (Suncor)

Summer turnaround for plant 25. Tasks included blank and blinding, bolt- up, rigging and commissioning during start-up.

January 2010 to June 2010

Pipefitter

Brymark Installations North Vancouver, BC (Canexus Chemical) Erecting of new plant. Tasks included punching and moaning, hydrostatic testing, fabrication of spools, rigging, mill scale removal and re - re of old systems. June 2011 to August 2011

Pipefitter

Canadian Industrial Maintenance Services ( CIMS) Port Melon, BC ( pulp & Paper) Summer turnaround. Task included washing out of old valves and the installation of refurbished ones.

June 2012 to December 2012

Pipefitter

Lockerbie and Hole Eastern Fraser Lake, BC ( Endako Mine Expansion) Erecting of new plant. Task included Fabrication of large bore pipe, installation of spools, rigging and commissioning.

January 2013 to February 2013

Lockerbie and Hole Northwest, Kitimat, BC (Rio Tinto Alcan) Pipefitter

Erecting of steam boiler. Task included heavy rigging, designing of piping system, spool fabrication and live tie-ins.

February 2013 to April 2013

Lockerbie and Hole Northwest, Coquitlam, BC ( UV Treatment Plant) Pipefitter

Erecting of new plant. Task included fabricating and the installation of large bore spools (10’), heavy rigging, hydrostatic testing and commissioning.

May 2013 to June 2013

Ipac Services Fort McMurray, AB ( Grizzly Oil Sands ) Pipefitter

Erecting of new mods. Task include fabrication of small bore piping, rigging, punching and moaning and designing of piping systems.

June 2013 to April 2015

Pcl Energy

Pipefitter General Foreman

Overseeing the construction in both green/brown fields. Ensuring construction deadlines are achieved and done with a professional attitude.

May 2015 to June 2015

Quinn Contracting

Pipefitter

P.E.2 turnaround. Fabricating small bore spools and bolt-up. July 2015 to January 2016

Stuart Olsen

Pipefitter

Fabrication of both large and small bore spools.

February 2016 to December 2017

Ledcor

Fabrication and installation of both large/small bore piping. Hydro testing and re-installing piping systems. February 2017 to December 2017

Aecon

100 Mile Compressor Station

Fabrication and the installation of large bore (42”) carbon pipe February 2018 to July 2018

Aecon

Wabasca Compressor Station

Fabrication and the installation of large bore (42”) carbon pipe July 2018 to August 2019

Aecon

Compressor Station and fabrication and the installation of large bore (42”) carbon pipe September 2019 to December 2019

L&L Oilfield Services Ltd

Servicing wellheads, installing wellheads and all aspects of all turnaround maintenance February 2020 to June 2020

Tradesman Ent

Teck Coal Mine

Installation of both large/small bore pvc piping

August 2020 to December 2020

Bird Construction

Compressor Station

Installation of large bore (36”) carbon pipe

January 2021 to July 2021

Cord Industrial

Cnrl

Fabrication and the installation of large bore (36”) stainless piping August 2021 to December 2021

Cord Industrial

Keyera Sulphur Plant

Installation of FRP piping

February 2022 to December 2022

Ocl Group Ltd

Teck Coal Mine

Foreman

Overseeing the construction of multiple pumping stations throughout the lease March 2023 to April 2023

Dcm Group Ltd

Syncrude

Foreman

Overseeing all construction associated with all turnaround maintance May 2023 to October 2023

Primoris Construction

Kitimat Lng

Installation of both large/small bore stainless piping January 2024 to August 2024

Thermal Design Ltd

SAGD

Measure and cut pile caps and the installation of mods October 2024 to November 2024

Ocl Group Ltd

Cenovus Energy

Installation of large bore carbon pipe(bolt-up)

Hi-torque

November 2024 to December 2024

Boom Construction

Compressor Station

Jack and roll of instrumental equipment

Certification

Red seal steam fitter certification

Red seal plumbing certification

B gas fitter certification

09 csts

Level 1 first aid

Current WHIMIS and hearing cards

Confined space training certificate

H2s alive certificate



Contact this candidate