Post Job Free

Resume

Sign in

Front End Class 3

Location:
Drayton Valley, AB, Canada
Posted:
September 26, 2023

Contact this candidate

Resume:

David Cole

Construction Foreman for Can-Traffic Services Calgary

Calgary, AB T2Y4B6

adzzaj@r.postjobfree.com

403-***-****

Work Experience

Hydrovac Operator

Absolute Connections - Calgary, AB

Present

Running hydrovac doing daylights and captures ahead of a drill, trenches and what ever else was needed. Construction Foreman

Can-Traffic Services Ltd. - Calgary, AB

November 2017 to May 2021

Started with setting bases for streetlight replacement operating a boom truck, to running the vac truck, gravel truck, larger boom trucks. Also bucket trucks, mini hoe to bobcat. Class 3 Q endorsement

Wet end operator

IG Machine and Fibre

November 2014 to November 2017

Making ISO insulation board for commercial building insulation. All aspects of production from start to finish, also shipping and receiving.

Insulators helper

Pollitt Construction

November 2012 to November 2014

Pipeline insulating, construction of utilidor buildings, learning sheet metal mechanic Labourer

C&D Construction

September 2009 to September 2010

All phases of custom home building. Cribbing, framing, roofing, siding, drywall and painting and finishing. Equipment Operator

Eagle River Industries

August 2007 to March 2009

Front end loader operator for custom oil rig mat production. Position also included various other sawmill duties.

Interior RV - Penticton, BC

April 2005 to May 2007

Position: RV Tech

Factory based recreational vehicle construction. Assembly of base construction, plumbing install, main assembly, propane system installation, electrical rough in and fixture installation, cabinet installation and finishing. Duties also included testing, inspection, repairs, shipping and storage prep. Shipper / Receiver

Green Acres Furniture Emporium - Penticton, BC

September 2004 to April 2005

Pick up and delivery of furniture and appliances, itemizing and labelling of purchases and sales. Storage and delivery. Cleaned and repaired furniture, cleaned and condition appliances. Landscaper

Cobble Stone Developments - Pentiction

March 2004 to September 2004

Installing various forms of landscape designs. Site development, equipment transportation and operation, turf installation, flower bedding, tree planting, retaining wall construction, brick laying, concrete finishing, irrigation system installation and maintenance, and property maintenance with basic horticulture knowledge.

Education

Secondary School

Sardis Senior Secondary

1990

Skills

• Backhoe Operation

• Plumbing

• Drywall

• Construction

Certifications and Licenses

License and tickets

Class 3 Q endorsed

First aid with AED

Ground Disturbance

Additional Information

Class 3 with Q endorsement.

Operate boom trucks, vac truck, gravel truck, bucket truck, mini hoe, bobcat also have operated front end loader and bucket/fork loader.



Contact this candidate