Clint Alvin Estenzo Mosqueda
Address : Purok Imelda, Pob, Aurora, Zamboanga del Sur
Current Address : Purok Imelda, Pob, Aurora Zamboanga del Sur
Mobile number : 094********/ 090********
Email address : *************@*****.***
Availability : I can start for work as soon as possible.
PERSONAL INORMATION
Age : 48
Date of Birth : December 10, 1974
Gender : Male
Civil Status : Separated
Height : 183cm
Weight : 108kg
Nationality : Filipino
Religion : Christianity – Catholic
Permanent Address : Purok Millinieum Pob, Aurora Zamboanga del Sur, Philippines 7020
WORK EXPERIENCE
Position : Lineman Erector
Duration : February 2021 to Present
Company : M4C Electrical and Engineering Services
Location : Aurora Zambaonga del Sur
Department : Tower Erection
Job Desdcription
: Responsible of Erection of 138KV & 230KV
Transmission Line Project/
: Segrigates of steel works according to its marked
Numbers.
: Lifting and Manual Handling of steel tower parts.
: Assembling of steel works.
: Lifting steel works using Jin Pole, ropes and
Blocks.
: Installing of step Bolts and anti climbing Devices.
Position : Linesman
Duration : January 2020 – January 2021
Company : Advantage NRG UK
Company Industry : Construction and Manpower/400KV
Location : SCOTLAND and SOUTH WALES UNITED KINGDOM
Department : Steel Works and Erection
Job Desgription
: Responsible for steel towers Erection, Stringing
Replacement and Reconductoring of 275KV
Transmission lines suspension and tension towers.
: Erection of tower mast for temporary transfer of
400KV transmission line conductors.
: Assemble and Erection of 400KV transmission
line tower parts.
: Installing color plates of 32KV transmission lines.
: Reporting progress,complications, progress, and
Delays to the supervisor.
:Adhering to safety standards at all times, as well as
Complying with company and industry regulations,
: Maintain knowledge of and implement safety
Procedures.
: Safety and accurately work sites with warning signs
and secures areas.
: Use electrical repair hand and power tools.
: Lifting and removal of damage steel tower parts
Of 400KV transmission lines.
: Attending to call-outs and performing repairs in
an efficient and timely manners.
Position Lineman Erector
Duration : March 2018 – July 2019 [ 1yr & 4mons]
Company : AJA Sub – Contractor Services
Company Industry : Transmission Lines Erection
Location : Toril to Bunawan Davao del Sur
Department : Tower Erection
Job Description
: Responsible of Erection 138 KV Transmission Line
Towers
: Lifting and Manual handling of steel tower parts.
: Segregates of steel tower parts according to each
Marked numbers.
: Assembling of Steel works.
: Lifting of steel works using Jinn pole, ropes
Blocks
: Installing of Step Bolts and Anti Climbing Device.
Position : Lineman Erector
Duration : February 2017 – November 2017 [ 9 months]
Company : AJA Sub – Contractor Services
Company Industry - Construction and maintenance of Transmission
Lines
Location : San Carlos to Guihulngan Negros Occidental
Department : Tower Erection
Job Description
: Lifting and manual handling of teels tower parts in
138 KV transmission lines
: Segregates of steel tower parts according to each
Number
: Assembling of steel works.
Lifting and lowering of steel works using jinn pole,
Ropes and blocks
: Installing Step bolts and Anti climbing device.
: Responsible of tightening tower bolts in 138KV
Transmission line tower.
•Position : Lineman
Duration : July 2013 –June 2016 (2years & 9mos.)
Company : GAMMON E & M LIMITED
Company Industry : CONSTRUCTION OF OHL HIGH VOLTAGE
Location : Devon House, Taikoo Place 979 Kings Road Country HK
Department : Tower Strengthening and Refurbishment [ 400KV ]
Job Description
: Responsible for steel tower Refurbishment
Tower Painting, Stringing,replacement and
Reconductoring of 400KV transmission lines
Suspension and tension towers.
: Read and interpret wiring diagrams.
: Use electrical hand and power tools and
electronic testing instruments.
: Responsible in doing the Pre Work Risk Assessment
: Demarcation of danger zone and work area.
: Checking the wristlets if it is match with the color
plate and put the flag identification indicating that
this side is safe.
: Installation of correct number of earth wire
Required in 400KV transmission lines
: Lifting and handling of steel.
: Lifting and lowering of steel works
: De-spacing of conductors of 400KV transmission
Line towers using cable spacing chair.
: Lifting and lowering of line materials using capstan
Winch {400KV Towers}
: Final sagging of conductors of 400KV transmission lines;
: Clamping and installation of new accessories in 400KV transmission line towers.
•Position : Medium Voltage Technician
•
•
Duration : March 2010 –March 2012 (2yrs)
Company : Al Rhakis est. /Ministry Finance
Company Industry : Repair & Maintenance Services
Location : Salwar
Country : Saudi Arabia
Department : Line Maintenance 13.8 KV
Job Descrption
: Installing electricity meters at residential homes
and buildings.
: Troubleshooting power outage and problems
with electrical lines and wires of 13.8KV lines.
: Conduct routine maintenance of box type
transformer switchgear & resistors 13.8KV underground transmission lines.
: Repairs of burned underground cable. {13.8KV}
: Install circuit breaker inside the transformer.
: Install of electric billing meter and conduct monthly
meter reading.
: Trouble shoots of faulty wiring in case of tripping.
: Locate underground electric cables of 13.8KV lines for repair.
: Conduct work outdoors in various types of weather.
: Digging trenches or climbing poles to repair or
maintain underground and overhead electrical
cables. In 13.8KV transmission lines.
•Position : Lineman A
Duration : March 2004 – December 2008 (4years & 8mos.)
Company : National Power Corporation
Company Industry : Energy (Electrical Power & Petroleum)(69KV)
Location : Mamburao Occidental Mindoro
Country : Philippines
Department : Transmission Line Maintenance [ 69KV ]
Job Description
: Clearing away tree branches or other hazards
near 69KV transmission lines.
: Install primary and secondary overhead
electrical systems of 69KV transmission lines.
: Line Controlling, Isolation and sectioning of line fault in 69KV transmission lines using megger tester.
: Installation/ replacement of pole, steel tower and line
Hardware of 69KV transmission lines.
: Routinely periodic preventive line maintenance work
: Installation of disconnect switch.
: Stringing, presaging of conductors and overhead
ground wires.
•Position : Rigger
Company : Epsilon Builders & Developers Corporation
Company Industry : Construction/Building/Engineering (138KV)
Location : Maranding, Lala Lanao del Norte
Country : Philippines
Department : Steel Tower Erection [138KV ]
Job Description
: Lifting & handling of steel tower parts of 138KV
Transmission line towers.
: Segregates of steel works according to mark number
: Assembling of steel works
: Lifting and lowering of steel works using jinn pole,
ropes & blocks
: Installation of step bolts & Anti climbing device
EDUCATION ATTAINMENT
Highest Education
Education level : Post Graduate Diploma / Master’s Degree
Education Field : Engineering (Electrical/Electronic)
Course : Industrial Electricity
School/University : Aurora Pioneers Memorial College
Location : Aurora, Zamboanga del Sur
Date : June 1997 – March 1999
SKILLS
Skill Level of Proficiency Remarks
1 Lineman 5 – Expert
2.Erector - Expert
TRAININGS/SEMINARS
Date Topic Course Title
July 7, 2015 – July 7, 2015 -Milan Tower Rescue Training Gammon E & M Ltd Hong Kong
Aug. 10, 2013 – Aug. 10, 2013 – Foreman Safety Training, the Hong Kong Training Association, Hong Kong
April 4, 2013 -- April 4, 2013 - Basic Electrical Safety Competence
Mar. 4, 2013 – April 12, 2013 – Climbing and use of PPE Health and Safety introduction of Tower drawings Application of High Voltage Testing device Steel works strengthening method statement Demarcating work areas and danger zone using and transporting working platforms checking and fin, Balfour Beatty Utility Solution
Laguna, Philippines
Feb. 4, 2013 – Feb. 7, 2013 – First Aid Training Standard
Philippine Red Cross
Carmel Ray Calamba, Laguna
Aug. 9, 1997 – Nov. 15, 1997 – Basic Lineman Training Course Technical Education and Skills Development Authority
Compound, Cabilinan,
Aurora, Zamboanga del Sur
REFERENCES
Hon. Silavano Zanoria
. Senior Vice President National Power Corp. {Retired}
•Municipality of Aurora
•Poblacion, Aurora, Zamboanga del Sur
Engr. Deogenis Ceniza
•NPC- Engineer (Retired)
•National Power Corp.
•NPC- Cabilinan, Aurora, Zamboanga del Sur (Philippines)
Mr. Arfel Gutib
. LINEMAN
. Balfour Beatty UK / New Zealand
. Poblacion Kauswagan Lanao del Norte