Post Job Free

Resume

Sign in

Lineman

Location:
Tibungco, 8024, Philippines
Posted:
September 26, 2023

Contact this candidate

Resume:

Clint Alvin Estenzo Mosqueda

Address : Purok Imelda, Pob, Aurora, Zamboanga del Sur

Current Address : Purok Imelda, Pob, Aurora Zamboanga del Sur

Mobile number : 094********/ 090********

Email address : adzyos@r.postjobfree.com

Availability : I can start for work as soon as possible.

PERSONAL INORMATION

Age : 48

Date of Birth : December 10, 1974

Gender : Male

Civil Status : Separated

Height : 183cm

Weight : 108kg

Nationality : Filipino

Religion : Christianity – Catholic

Permanent Address : Purok Millinieum Pob, Aurora Zamboanga del Sur, Philippines 7020

WORK EXPERIENCE

Position : Lineman Erector

Duration : February 2021 to Present

Company : M4C Electrical and Engineering Services

Location : Aurora Zambaonga del Sur

Department : Tower Erection

Job Desdcription

: Responsible of Erection of 138KV & 230KV

Transmission Line Project/

: Segrigates of steel works according to its marked

Numbers.

: Lifting and Manual Handling of steel tower parts.

: Assembling of steel works.

: Lifting steel works using Jin Pole, ropes and

Blocks.

: Installing of step Bolts and anti climbing Devices.

Position : Linesman

Duration : January 2020 – January 2021

Company : Advantage NRG UK

Company Industry : Construction and Manpower/400KV

Location : SCOTLAND and SOUTH WALES UNITED KINGDOM

Department : Steel Works and Erection

Job Desgription

: Responsible for steel towers Erection, Stringing

Replacement and Reconductoring of 275KV

Transmission lines suspension and tension towers.

: Erection of tower mast for temporary transfer of

400KV transmission line conductors.

: Assemble and Erection of 400KV transmission

line tower parts.

: Installing color plates of 32KV transmission lines.

: Reporting progress,complications, progress, and

Delays to the supervisor.

:Adhering to safety standards at all times, as well as

Complying with company and industry regulations,

: Maintain knowledge of and implement safety

Procedures.

: Safety and accurately work sites with warning signs

and secures areas.

: Use electrical repair hand and power tools.

: Lifting and removal of damage steel tower parts

Of 400KV transmission lines.

: Attending to call-outs and performing repairs in

an efficient and timely manners.

Position Lineman Erector

Duration : March 2018 – July 2019 [ 1yr & 4mons]

Company : AJA Sub – Contractor Services

Company Industry : Transmission Lines Erection

Location : Toril to Bunawan Davao del Sur

Department : Tower Erection

Job Description

: Responsible of Erection 138 KV Transmission Line

Towers

: Lifting and Manual handling of steel tower parts.

: Segregates of steel tower parts according to each

Marked numbers.

: Assembling of Steel works.

: Lifting of steel works using Jinn pole, ropes

Blocks

: Installing of Step Bolts and Anti Climbing Device.

Position : Lineman Erector

Duration : February 2017 – November 2017 [ 9 months]

Company : AJA Sub – Contractor Services

Company Industry - Construction and maintenance of Transmission

Lines

Location : San Carlos to Guihulngan Negros Occidental

Department : Tower Erection

Job Description

: Lifting and manual handling of teels tower parts in

138 KV transmission lines

: Segregates of steel tower parts according to each

Number

: Assembling of steel works.

Lifting and lowering of steel works using jinn pole,

Ropes and blocks

: Installing Step bolts and Anti climbing device.

: Responsible of tightening tower bolts in 138KV

Transmission line tower.

•Position : Lineman

Duration : July 2013 –June 2016 (2years & 9mos.)

Company : GAMMON E & M LIMITED

Company Industry : CONSTRUCTION OF OHL HIGH VOLTAGE

Location : Devon House, Taikoo Place 979 Kings Road Country HK

Department : Tower Strengthening and Refurbishment [ 400KV ]

Job Description

: Responsible for steel tower Refurbishment

Tower Painting, Stringing,replacement and

Reconductoring of 400KV transmission lines

Suspension and tension towers.

: Read and interpret wiring diagrams.

: Use electrical hand and power tools and

electronic testing instruments.

: Responsible in doing the Pre Work Risk Assessment

: Demarcation of danger zone and work area.

: Checking the wristlets if it is match with the color

plate and put the flag identification indicating that

this side is safe.

: Installation of correct number of earth wire

Required in 400KV transmission lines

: Lifting and handling of steel.

: Lifting and lowering of steel works

: De-spacing of conductors of 400KV transmission

Line towers using cable spacing chair.

: Lifting and lowering of line materials using capstan

Winch {400KV Towers}

: Final sagging of conductors of 400KV transmission lines;

: Clamping and installation of new accessories in 400KV transmission line towers.

•Position : Medium Voltage Technician

Duration : March 2010 –March 2012 (2yrs)

Company : Al Rhakis est. /Ministry Finance

Company Industry : Repair & Maintenance Services

Location : Salwar

Country : Saudi Arabia

Department : Line Maintenance 13.8 KV

Job Descrption

: Installing electricity meters at residential homes

and buildings.

: Troubleshooting power outage and problems

with electrical lines and wires of 13.8KV lines.

: Conduct routine maintenance of box type

transformer switchgear & resistors 13.8KV underground transmission lines.

: Repairs of burned underground cable. {13.8KV}

: Install circuit breaker inside the transformer.

: Install of electric billing meter and conduct monthly

meter reading.

: Trouble shoots of faulty wiring in case of tripping.

: Locate underground electric cables of 13.8KV lines for repair.

: Conduct work outdoors in various types of weather.

: Digging trenches or climbing poles to repair or

maintain underground and overhead electrical

cables. In 13.8KV transmission lines.

•Position : Lineman A

Duration : March 2004 – December 2008 (4years & 8mos.)

Company : National Power Corporation

Company Industry : Energy (Electrical Power & Petroleum)(69KV)

Location : Mamburao Occidental Mindoro

Country : Philippines

Department : Transmission Line Maintenance [ 69KV ]

Job Description

: Clearing away tree branches or other hazards

near 69KV transmission lines.

: Install primary and secondary overhead

electrical systems of 69KV transmission lines.

: Line Controlling, Isolation and sectioning of line fault in 69KV transmission lines using megger tester.

: Installation/ replacement of pole, steel tower and line

Hardware of 69KV transmission lines.

: Routinely periodic preventive line maintenance work

: Installation of disconnect switch.

: Stringing, presaging of conductors and overhead

ground wires.

•Position : Rigger

Company : Epsilon Builders & Developers Corporation

Company Industry : Construction/Building/Engineering (138KV)

Location : Maranding, Lala Lanao del Norte

Country : Philippines

Department : Steel Tower Erection [138KV ]

Job Description

: Lifting & handling of steel tower parts of 138KV

Transmission line towers.

: Segregates of steel works according to mark number

: Assembling of steel works

: Lifting and lowering of steel works using jinn pole,

ropes & blocks

: Installation of step bolts & Anti climbing device

EDUCATION ATTAINMENT

Highest Education

Education level : Post Graduate Diploma / Master’s Degree

Education Field : Engineering (Electrical/Electronic)

Course : Industrial Electricity

School/University : Aurora Pioneers Memorial College

Location : Aurora, Zamboanga del Sur

Date : June 1997 – March 1999

SKILLS

Skill Level of Proficiency Remarks

1 Lineman 5 – Expert

2.Erector - Expert

TRAININGS/SEMINARS

Date Topic Course Title

July 7, 2015 – July 7, 2015 -Milan Tower Rescue Training Gammon E & M Ltd Hong Kong

Aug. 10, 2013 – Aug. 10, 2013 – Foreman Safety Training, the Hong Kong Training Association, Hong Kong

April 4, 2013 -- April 4, 2013 - Basic Electrical Safety Competence

Mar. 4, 2013 – April 12, 2013 – Climbing and use of PPE Health and Safety introduction of Tower drawings Application of High Voltage Testing device Steel works strengthening method statement Demarcating work areas and danger zone using and transporting working platforms checking and fin, Balfour Beatty Utility Solution

Laguna, Philippines

Feb. 4, 2013 – Feb. 7, 2013 – First Aid Training Standard

Philippine Red Cross

Carmel Ray Calamba, Laguna

Aug. 9, 1997 – Nov. 15, 1997 – Basic Lineman Training Course Technical Education and Skills Development Authority

Compound, Cabilinan,

Aurora, Zamboanga del Sur

REFERENCES

Hon. Silavano Zanoria

. Senior Vice President National Power Corp. {Retired}

•Municipality of Aurora

•Poblacion, Aurora, Zamboanga del Sur

Engr. Deogenis Ceniza

•NPC- Engineer (Retired)

•National Power Corp.

•NPC- Cabilinan, Aurora, Zamboanga del Sur (Philippines)

Mr. Arfel Gutib

. LINEMAN

. Balfour Beatty UK / New Zealand

. Poblacion Kauswagan Lanao del Norte



Contact this candidate