MIR TAYYAB RAZA
OBJECTIVE
To work under the gaudiness of such experienced professional
who can make use of my ability and talents in the best way possible. I always believe in giving away in my best performance makes challenging tasks and opportunities for growth and career development.
EXPERIENCE
Dynamic Power Link
-
Electrician
Work Experience :
1- Cable Laying according to P&IDs.
2- Control and Power Termination according to Electrical Schematic.
3- Implementing PTW and LOTO System at plant.
4- Converting 220V To 24V DC Control of Machine and Panels. 5- Three Phase Control and Power wiring Circuit installations and Troubleshooting.
6- DOL Circuit ( Power+Control ) installations and Troubleshooting.
7- Star Delta Circuit ( Power+Control ) installations and Troubleshooting.
8- Reverse Forward Circuit ( Power+Control ) installations and Troubleshooting.
9- Installations of 300mm Cable for HT Panel.
10- Power Factor Control Project Unilever Wall,s ICF (Multan Road)
11- Installations of Emergency Light.
12- Installations of SACAD System for Solar System. 13- Laying the Earthing Cable and Connect the Earth Pit. 14- Installations of Light Arestar.
15- Installations of Piping Instruments.
EDUCATION
Govt Swedish Pakistani Collage of Technology Gujrat 2022
DAE Electrical
Grade (A)
PROJECTS
@
O
,
CONTACT
*************@*****.***
Jalal Pur Jattan (Tahsil & District
Gujrat)
SKILLS
1- Repairing Electrical System. 2-
Knowledge of Safety Regulations. 3-
Troubleshooting. 4- Electrical
Installations and Schematic. 5-
Industrial Experience. 6- Microsoft
Excel.
LANGUAGES
Punjabi, Urdu, English
PERSONAL DETAILS
Date of Birth : 20/2/2004
Marital Status : Single
Nationality : Pakistani
Religion : Islam
Gender : Male
CNIC : 34201-7126517-7
Electrician
1- Installations of 300mm Cable for HT panel Lipton Tea Factory
(Khane Wal)
2- Power Factor Control Project Unilever Wall ICF (Multan Road) 3- Installations of Light Arestar Project Unilever Rafhan Best Food (Multan Road)
4- Sadique AgriCose Pvt Ltd Maintenance Project.
5- Laying the Earthing Cable and with the Connect Earth Pit Project Uniliver Wall,s ICF (Multan Road)
6- Shut Down Project Uniliver Rafhan Best Food.(Multan Road) 7- Convert 220V To 24V DC Control of Machine and Panels Project Unilever Wall,s ICF (Multan Road)
8- Shut Down Project Unilever Wall,s ICF (Multan Road) 9- Installations SCADA System for Solar System Lipton Tea Factory (Khane Wal)