Mohamed shehta shahien
SENIOR SURVEYOR
Tanta, Gharbyia, Egypt
adztmk@r.postjobfree.com
Military service : Completed
EDUCATION
BSc. in Cartography and Survey
Faculty of Arts
Tanta University
SOFTWARE SKILLS
AutoCAD 2D
AutoCAD Civil 3D
Trimble Geomatics Office
Trimble Business Centre
ESRI ArcGIS
HYPACK
Eiva navi pac
Global Mapper
Google Earth
Eiva Naviscan
SURFER
INSTRUMENTS
SKILLS
Level
Total Station Trimble & Sokkia
All Trimble GPS Systems
LASER SCANNER FARO 130x
GPR
Radar Map 8000
ODOM MK III ECHO SOUNDER
GPS (GRX2 & GRX3 )
WORK EXPERIENCE
march2021 – till now
PHOSPHATE MISR CO.
Project surveyor (Red sea project)
Mining survey at mines of phosphate
Making contractors extracts and calculating quantities
Evaluating the top contracted areas and delivering to contractors Jun 1 2020 – march 2021
ELSEWEDY ELECTRIC T&D
Project surveyor (Elmostkbal city )
Laying of cable networks for construction distributors
Street lighting
Extending a network of telephone cables and smart cables
Processing data at Auto-cad
Project surveyor (East Elowinat )
Processing data at Auto-cad
As-built of 50th thousand acre for Reclamation
Extending power lines and high pressure poles
Review design
Jan 2019 - march 2020
ECCOT COMPANY FO TRADING AND CONSTRUCTION
Senior surveyor
Consrtuction works
Infrastructure works and landscape
Golf Courses
Review design and extract data
FREELANCER SURVEYOR : July2018- dec 2018
JOIN IN MANY FREE WORKS
As built ( decoration offices )many jobs (villas – schools – hospitals- hotels )
Hydrographic Surveyor freelancer single beam
Self study programs (auto cad – civil 3d((pmp prep). Jan. 2015 – June2018
ZONE SURVEY & MAPPING CO.
Senior Surveyor
Since joining ZONE Surveying team, I have been a Part of many projects such as :
CAIRO WEST POWER SATATION, Cairo
Senior Surveyor - PGESCo
o Topographic Surveying of the new power satation’s Extinsion Area
o Estabilishment of a group of GROUND CONTROL POINTS NETWORK using TOTAL STATION & GPS RTK technique
o UnderGround Survey for cables And pipes using GPR & Radar Map 8000
YASSIN MANSOUR’s PALACE, PALM HILLS, 6th of OCTOBER CITY Senior Surveyor - CDC
o As Built Surveying works indoor & outdoor the palace including exterior & interior Facades using 3D LASER SCANNER “ FARO 130x”
Green Hills, Ras Elhekma, NORTH COAST
Senior Surveyor - Green Hills
o Topographic surveying for the whole 1200 Feddan of the project area
o Establishment of Control points Observed by Total Station & GPS RTK Technique .
o Cut & Fill Quantity Survey
HURGHADA HILTON PLAZA, HURGHADA
Senior Surveyor – Pavillion Architects
o As Built Surveying works for the Ground floor of the hotel and topographic survey for landscape Area.
o Permenant control points were established to be used in further extinsion works.
o All works were done using Total Station
ISMAILLIA TUNNELS, Ismaillia
Senior Surveyor - PETROJET
o Monitoring the above ground area along the tunnel’s allignment and preparing the technical reports of the dilapidation which may occures because of excavation machines.
PETROJET GAS LINE, Cairo
Senior Surveyor - PETROJET
o Using ESRI arcGIS to Georeference satellite images using Observed control points by GPS.
o Digitizing Gas lines from Eltebeen to El behiera Governate with 136 km lenth with 1 Km buffer zone
Beni Swif Power Plant, Beni Swif
Senior Surveyor
o Topographic surveying for the Power Plant Using Total Station
o Establishment of Control points Observed by Total Station & GPS RTK Technique for horizontal control and a level for the vertical control.
o Scanning the features of the power plant using LASER SCANNER ( FARO x130)
Port Said East Power Station, North Sinai
Senior Surveyor – GEOCEAN
o Establishing Horizontal & Vertical control Points using Total Station & GPS
o As-built survey for the whole power Station
Khalda Gas Field, elwahat.
Senior Surveyor – Inpy
o Topography survey
o UnderGround Survey for cables And pipes using GPR & Radio Detection 8000
Egyptian Post Press, Nasr city.
Senior Surveyor – Elamar
o Topography survey.
o Full As built for buildings
o Establishment Vertical and horizontal control points
Asuit Energy Power plant, Asuit.
Senior Surveyor – ORASCOM
o Topography survey for the Power plant
o Establishment Vertical and horizontal control points o Full As built for all buildings
o Underground ditction with RD1000
Laser Scanner .
Surveyor
o Creting 3-D Modelling, point Cloud & Topography using Laser Scanner Faro x 130 in many projects such as : Assiut West Power Plant – Damietta Power Plant –
Elmahmoudya Power Station – Alexandria Chemicals Co. Ezz Steel.
Underground Detection.
Surveyor
Detection of underground utilities and elec cables by DR 8000& GPR in different projects (Suez Petroleum - Khaledah Company - Blaim - Refining Cairo, Mostorod)
Dec. 2010- jan2014
AGROSCAPE FOR SPECIAL CONSTRUCTION
Elain valley / Elharam hotel /Marrissi /Alex west /New giza General Surveyor
o Land survey buildings and topography
o Sewage and irrigation works
o Golf Courses works and landscape works
o Review design
o Data exctract with Auto-cad
Oct. 2009- Dec. 2010
ALEXANDRIA FOR CONSTRUCTION
Surveyor
Madinaty, Cairo
Surveyor
o Topography Survey for the whole project area
o Determine the Cut and Fill levels
o Establishment vertical and horizontal control points o Staking the Axes for construction purposes
o Doing all survey works needed during construction ( Axes, points, Slab level, Rienforced Concrete levels, Columns location …etc)
o Infrastructure survey works for ( Sewage, Water
pipelines, Electric Cables, Gas Lines )
o All landscape works ( Designing, Survey, Design Editing
, Quantity Survey )
o Roads Design
o As-Built survey for the new features
FREELANCER HYDROGRAPHIC SURVEYOR PROJECTS
Survey Equipment:
Single beam Echo Sounder: (Teledyne Echo track MKIII) Motion Sensors :( TSS DMS 05)
Magnetometer (Geometric 288)
All Trimble GPS Devices (R10, R8, R7, R2, SPS, 4000, Pathfinder) Total Station
Survey General
Precise Positioning.
Dredging.
Geophysical Survey
EPLOYMENT HISTORY
Present: Freelance
Jan 2016 to 2021 Zone Offshore
Surveyor / Data Processor
Verify that the online system has been installed and configured correctly for use and performing within specification
Do gyro calibration
Do measuring vessel offsets
Do the Positioning Verification of the positioning systems
Maintain an online logbook and associated documentation
Install surface positioning systems (including receiver antenna)
Control survey and supervise its implementation taking into account client and company specifications and accuracy requirement Date Client/ Contractor Vessel / Location Task Position software
8Oct 20 to 28Oct20 DEME Zodiac/ Albardawel lake
Bathymetric Survey
(Single beam) Surveyor
Hypack
15April 19 to 20June19 Deep Ocean Zodiac/ port said Bathymetric Survey
(Single beam) Surveyor
Hypack
5Dec 18 to 20Dec18 15
Days Edra Zodiac/Eastern port said
Bathymetric Survey
(Single beam) Surveyor
Hypack
25Jun18 to 12Aug18 NMDC
Nasr men Allah 4440/
Ras Gargoub Port
Bathymetric
Survey
(Multi beam)
Trainee Data
Processor
Navi edit
27May18 to17Jun18 NMDC
Nasr men Allah 4440/
Ras Gargoub Port
Bathymetric
Survey
(Multibeam)
Trainee Data
Processor
Navi edit
18Apri18 to 15May18 NMDC
Nasr men Allah 4440/
Ras Gargoub Port
Bathymetric
Survey
(Multibeam) Surveyor
Navipac
Naviscan
20Mar18 to 28Apr18 NMDC T4/ Ras Gargoub Port
Geophysical Site
Survey Surveyor
Navipac
Naviscan
20Feb18 to 02Mar18 NMDC
Nasr men Allah 4440/
Ras Gargoub Port
Bathymetric
Survey
(Multibeam) Surveyor
Navipac
Naviscan
23Jan18 to 04Feb18 NMDC
Nasr men Allah 4440/
Ras Gargoub Port
Bathymetric
Survey
(Multibeam) Surveyor
Navipac
Naviscan
21Nov17 to 25Nov17 NMDC
Zodiac/Elmanzala
Lake
Bathymetric
Survey
(Single beam) Surveyor
Hypack
10Nov17 to 14 Nov17 Deep Ocean EDT Niovi/ATOLL Field Geophysical Site
Survey
Including
Bathymetric
Survey
(Multibeam) Surveyor
Navipac
Naviscan
17Sep17 to 08Oct17
SCA/Navy
Forces
Nasr Mn Allah/Maisteral
Platform
Geophysical Site
Survey
Including
Bathymetric
Survey
(Multibeam
Trainee
Surveyor
Navipac
Naviscan
3 Apr17 to 13 Apr17 Fugro Zodiac/ zohr gas field
Bathymetric
Survey
(Single beam) Surveyor
Hpack
15Mar17 to 28Mar17 Deep Ocean EDT Niovi/ATOLL Field Geophysical Site
Survey
Including
Bathymetric
)Survey
(Multibeam)
Trainee
Surveyor
Navipac
Naviscan
18 Aug16 to 8 Sep16
Hyflux/Geo
group
El zahra / El-Ain
Elsokkna Port
Geophysical Site
Survey Including
Bathymetric
Survey
(Multibeam)
Trainee
Surveyor
Navipac
Naviscan