Post Job Free
Sign in

Fiber Optic Project Manager

Location:
Accra, Greater Accra, Ghana
Posted:
September 20, 2023

Contact this candidate

Resume:

Christian Biako

adzt8g@r.postjobfree.com

ACCRA, Ghana, GD- 052

PROFESSIONAL SUMMARY

I am a confident result-oriented team worker and comfortable working in multi-cultural environments. To achieve the best results possible in all I apply myself to, be the best I can socially, develop progressively along any firm’s corporate ladder, affect others positively whilst using my skills in new ways in an environment that promotes free thinking that presents extreme challenges, and makes real impact. Seek to obtain full time employment with well-established organization to fully utilize my skills and abilities to the benefit of my employer

WORK EXPERIENCE

FIBER SPLICER TECHNICIAN /TECHNICAL DIRECTOR Nov 2022 - Present SAMFLOS GHANA LTD • ACCRA, Ghana

• As Fiber Optic Technical Director on Kumasi International Airport Project phase II and III, in charge of all Fiber Optic Cable installations, Splicing, terminations and Testing.

• Running and Installation of ADSS and OPGW Fiber cables in a closure and in cable rack for splicing.

• Inspecting of UG cable trench, this includes cable preparing, OTDR/IOLM test and report generating on the fiber cables.

• Quality Assurance inspector on all cable pulled.

• Preliminary acceptance with the Customer.

.

FIBER SPLICER TECHNICIAN Feb 2022 - Aug 2022

INFRA TOWER GHANA / ISG UK • LOME

• Testing OPPC and OPGW Fiber Optic cable with OTDR and analyzing OTDR trace. Auditing and Splicing of fiber Optic cable on the network.

• Preparing Baseline Progress schedule and weekly progress reports, Issuing and interpreting redlining drawings issued for construction

• Generating Reports, attending client and stake holder meetings and submitting progress reports.

SPLICER SUPERVISOR May 2018 - Dec 2021

TKM MAESTRO LMITED • ACCRA, Ghana

• Run OTDR test on all OPGW cable drum to be string and generation of OTDR test reports.

• Responsible of submitting report to GridCo on Behalf of Amandi Company.

• Splicing all OPGW fiber optic cable on high tension spans in closure.

• Running and Installation of ADSS and OPGW Fiber cables in a closure and in cable racks for Splicing,

PROJECT MANAGER Dec 2015 - Nov 2017

WITMAN CONTRACTORS • KAMPALA, Uganda

• Prepare and present regular internal and external report for management.

• Prepare long and short-term resource allocation based on input from key players.

• Running and Installation of OPGW Fiber cables on high tension spans and on cable rack, also underground trenches, this includes Cable Preparing in ODF and joint closure, Splicing of OPGW and ADSS cables, OTDR testing and reporting on the fiber cables. EDUCATION

LINESMAN CERTIFICATE I (TELEPHONE) Mar 2022 - AUGUST 2023 NATIONAL VOCATIONAL TRAINING INSTITUDE • ACCRA, Ghana ORDINARY, LEVEL CERTIFICATE

ORDINARY LEVEL CERTIFICATE

SKILLS

• Customer Service

• Operating Power Hand tool

• Operating System-Windows 10 and above

• Hardware and Networking

• Use of all type of splicing machine

• Analyzing of OTDR traces

• Interrogating of all kinds of Fiber Power Meter & OTDR

• Splicing of all types of Fiber Optic cable \

• Writing Reports

• Diagnosing issues

• Installing Equipment’s

• Driving

• Problem Solving

• Critical Thinking



Contact this candidate