Site In-Charge
:
Designation:
Duration:
Site In-charge
Designation:
RDB-ELSEIF - (Precast) – Saudi Arabia
Company:
** **** **** ** **** August 2020.
Duration:
Site In-charge
** ******* **** to 24th March 2019
Salini Impergilo Company – Saudi Arabia
Company:
The Red Sea Development Company (TRSDC).
Client:
COV Residential Building Project & Turtle Bay Hotel Project.
Project:
25 August 2020 to Till Date.
Duration:
Site In- charge
Designation:
January 2007 to December 2009
Duration:
Assistant Supervisor
Designation:
Urban Developers - Pakistan
Company:
January 2010 to September 2010
Duration:
Supervisor
Designation:
H.M. Associates Pvt. Ltd. - Pakistan
Company:
19 Oct 2010 to 25 August 2015
Duration:
Precast Erection Supervisor
Designation:
PREMCO BINLADIN - (Precast) – Saudi Arabia
Company:
Applied for the Post:
: adzt11@r.postjobfree.com
E mail
: Pakistani
Nationality
Contact No KSA
Saudi Amana Contracting Company – Saudi Arabia
Company:
Professional Experience Summary:
employer. Hard working determined passionate and confident individual who enjoy serving with the public.
prove my experience and groom my skills under a roof professional environment. Ability to satisfy the needs of
To pursue a challenging position in a leading dynamic and career oriented organization where I can utilize &
FARHAN HASSAN
Career Objective:
13 Years’ Experience
Total Experience:
Constant coordination with the construction team.
Fixing of coordinates & levels for construction of bridges from starting to completion
Give accurate levels to fix Precast panels
drawings
Layout footing & alignment of walls, opening, exact location of doors & windows based on plan &
•
related to precast erection.
Prepare projects site documents managements system & proper control of the documents & records
Supervised Erection Foreman and Labors
Maintain the Work and Safety standards.
Supervised erection of Villa, Apartment, Ancillary Buildings and Boundary Wall from start to End of the project.
Co-ordination with consultants for the inspection of steel cages, formwork, footings prior to concreting.
Preparation of RFI in order to get consultants approval for the activities of site.
•
Closely monitoring for Non-conformance reports.
•
Resolve the Sites issue for Layout.
•
Preparation of daily and Monthly progress report.
•
Supervision of Precast elements like dumas, slabs, cladding wall, columns, panels, boundary wall etc.
•
•
Performing Pre-inspection to ensure that all installed materials are within the standards.
•
Quality control of construction works.
•
get approval from consultant.
New construction of buildings erect precast panels on his specific levels and then alignment with total station than
•
Construction supervision of above said Project comprising.
Web Browsing
Microsoft Word, Excel and Power point
Diploma in Auto CAD
Computer Qualification and Knowledge:
Duties & Responsibilities:
One Year Diploma in Surveying
HSSC (Higher Secondary School certificate)
Matriculation
Senior Surveyor during his absence.
management.
I am responsible for complete consultant inspection for my work and after approval reporting to
Coordination with main Client and Consultant for MIR/IR/RFI
Prepares & submit regular reports on erection progress.
Academic Qualification:
Supervised Alignment, Grout and Screed Groups as well and also work as Surveyor in replacement of
Supervised Erection Foreman and Labors. Maximum supervised 10 Erection Groups.
Supervised the Precast Erection in different projects of Ministry of Interior.
& others
Report quality & safety incidents on the company incidents records & assisting in managing & controlling of health,
for architecture work
Installation of tertiary control for “plumbing up” thus ensuring vertical & established one meter level (reference)
Inspection of grading works cut & fill areas & check the alignment & level of trench excavation
safety & environmental occupational plan on site
Downloads field survey data from Total Station & to the computer for reference such as topographic, relocation
safety & environmental occupational plan on site
Report quality & safety incidents on the company incidents records & assisting in managing & controlling of health,
Joint measurement with the consultant engineer.
adzt11@r.postjobfree.com
adzt11@r.postjobfree.com
Reference:
Farhan Hassan
Yours Sincerely,
organization, definitely I will serve my part as well and assist to growth of the organization.
The above stated information is true and accurate. If you give me an opportunity to work with your esteemed
Inspection of grading works cut & fill areas & check the alignment & level of trench excavation
Technical troubleshooting faced at site with co-ordination of Client and consultant.
To supervise the job site to ensure that work is being done as specification and plan.
Than Consultant come on the site and check the levels and Alignment with instrument.
Alignment.
Also worked as a surveyor, gave the bottom levels of columns with Level Machine and Total Station use for the
Erecting Boundary wall on this project culms and panels and caps and cornices’.
consultant group.
Render monitoring and surveillance on site to control the quality of work being implemented by the
Conduct inspection for civil construction activities which include Grouting, Erection of precast elements etc.
for architecture work
Installation of tertiary control for “plumbing up” thus ensuring vertical & established one meter level (reference)
Handling the company labor and petty contractors and brief regarding of their duties.
Closely monitoring for Non-conformance reports.
•
Preparation of material statement and estimate.
Performing Pre-inspection to ensure that all installed materials are within the standards.
Preparation of RFI in order to get consultant approval for the activities of site.