Marcelino T. Sustal
Mobile No: +639*********
Email Address: adzs1d@r.postjobfree.com
Contact Person In case of Emergency: Marilyn Sustal Fidelson
Contact number In case of Emergency:093********
PERSONAL INFORMATION
Age : 35
Birthday : March 15, 1988
Birth Place : Tanza, Cavite
Height : 175cm
Weight : 83
Marital Status : Single
Nationality : Filipino
Language : English/tagalog
Mother’s Name : Norma Sustal
Father’s Name : Marcelo B. Sustal
Provincial Address: 430 tramo kanluran st. Halayhay, Tanza, Cavite
WORK EXPERIENCE
Company Name Kuya Aldrich construction services
Address. Brgy Santiago general trias cavite
Position. General Foreman
Duration: June 15, 2019 up to present
Working hour. 48 hours a week Duties and responsibilities:
To do planning, layout structural, monitor and command our workers to do what's On the plan, tiles, cabinet maker, carpentry, ceiling Installation, cove
design installation, vinyl installer
Company Name: Saudi Plastic Products Co.ltd (SAPPCO)
Address: Riyadh, Saudi arabia
Position: Machine Operator
Duration: February 12, 2017 – May 24 2019
Working hour: 48 Hours week Duties & Responsibilities:
Polyurethane injection machine operator - this machine is the most difficult machine to operate than Extrusion machine because you have to be ready for onthe spot troubleshooting because the formulation of the chemicals are not the same even you produce the size of the product, it's also depends on the facing you have used, like ( aspalt,CFG, aluminum)
Setting up of sandwich panel steel spacer should be accurate to the size of board we produce to
Before starting the polyurethane machine, we have to check the tank of chemicals main component ( ISO and polyol) and additives ( policate 8, water, k15 or potassium octave, L6900, and gas 141b) to avoid problem when your production run for a long time.
before starting the machine make sure that all air valves and materials valves going to machine are always open to avoid problem during production. Set spray (rake) and you have to check every part of the machine if it's working properly if not or have some problem you have to fix it before starting the machine
during the production you need to check the expansion of the chemicals then check the density of you produce low density you have to increase the dosage of main component
( chemicals) to reached the density we need, if you produce high density you have reduce dosage or add gas (141b) and add more speed to avoid over rolling or over filling of chemicals, increase or decrease additives if you saw some problem, like underfilling, hole, over rolling of foam, density, etc.
To produce low density of insulation board you have to reduce material load and increase speed add some gas (141b) to add more expansion of a foam to maintain the maximum and minimum tolerance density of an insulation board.
To produce high density you have to add material loads lessen gas (141b) reduce speed because If you produce high density our expansion should be atlease 30 t0 35seconds expansion time,
Preparing moulds and pouring chemicals mixtures into a block moulds and demolding cured polyurethane block after 24hours and storing them according to their density.
Tools/Materials/Equipment/Machine used:
Polyol and Iso this two kinds of chemicals are the main component of polyurethane insolation board
C8- use to expand, quick dry, making foam hard, and strengthen the foam
L6900- this silicon stabilize the foam growth in a place Water- it helps to expand the foam immediately.
141b gas- used to expand the foam into the desire thickness, and it helps to control the density of the product and the speed of the machine
Sandwich panel- it use to pull the insolation board, and to maintain the thickness and width of the insolation board
Saw machine- used to cut the insolation board into into desire sizes, to maintain the sizes and with of the foam
Company Name: ASB TRADERS
Address: Brgy. Aguado Trece Marrtirez Cavite
Position: truck driver
Duration: June 3, 2015 - January 17 2017
Duties and responsiblities:
transport and collect waste materials from company to warehouse.
Check and maintain truck engine and break before travel and wash/clean the truck after
duty or in free time of work
Company Name: Saudi Plastic Products Co.ltd (SAPPCO)
Address: Riyadh Saudi Arabia
Position: Extruder Machine operator
Duration: July 14 2013 - May 16, 2015
Working hour: 48 Hours a week Duties & Responsibilities:
Set die tools, vacuum bat, haul off, cutter, socketing tools
Pre heating die and barrel heaters 2 to 4 hours heating before starting the machine to melt the materials inside the barrel, less friction and to avoid screw damage or broken of screw
Ready and check all the materials you need to used before starting the machine
When you start the machine we used freezing materials to check the condition of machine
During production you have to check the appearance, thickness,ovality, champer, and socket of a pipe you produce, if you saw some problem you have to fix it, to lessen scrap, wasting of materials and production time.
Monitoring and maintaining the machine always check the load materials, heating temperature, vacuum bath pressure, roller for length, cutter, socket heaters, and socketing moulds,
Tools/Materials/Equipment/Machine used:
PVC plastic powdered material main component of pvc pipe
Die moulds tools and heaters- used to molten and moulds materials into PVC pipe
Water vacuum bath - this machine used to make rounds pipe using a vacuum pressure and spray cold water to maintain the diameter of the pipe
Haul off machine- used to pull out molten product from die tools into vacuum bath for cooling system and maintain the speed to avoid broken line
Saw machine - this machine used to cut the pipe into the desire size
Socketing machine- used to molten socket part of a pipe and make a socket ofa pipe even if it's plaine end or angle joint
Socketing machine chamber- used to moulds sockets of PVC pipe for fittings, and extension of the pipe.
RK11,Rk25,RK21,HL25,HL30,HL100, - This are the example of PVC die tools and sizes I have to
assemble and disassemble defend on the costumer needs,
Company Name: Les Concorde catering service
Address: Eagle Ridge, General Trias, Cavite
Position: Housekeeping
Attendant Duration: January 14,2010 to January 26 2012
Working hour: 48 hours a week
Duties & Responsibilities
Maintain the cleanliness and orderliness of the hotel
Clean the bathroom
Check and count mini bar consumption Replace all bathroom supplies
Mop the floor and vacuum if needed Dust all furniture
Collect and replace bedsheets Make up bedroom
Check over all condition of the room,
EDUCATIONAL BACKGROUND
Elementary:
School Name: Halayhay Elementary School
Address: Halayhay, Tanza, Cavite
Duration: June 1994 - March 2000
High School:
School Name Amaya School of Home Industries
Address: Sahud Ulan Tanza, Cavite
Duration: June 2000 - March 2004
College: Graduate
School name: System Technology Institute
Course Taken: Diploma in Computer and Electronics Technology
Address: Rosario, Cavite
Duration: June 2004 - May 2006
Trainings and Seminar Attended
BNS Hotelier Training Center Corporation
436 on the job training as aHousekeeping Attendant Microtel Inn and Suites Eagle Ridge, General Trias, Cavite April 18, 2009 to June 18 2009
CHARACTER REFERENCE
Name: Ernesto Ciria Company: baranggay official
Work Position: baranggay councilor Mobile/Telephone Number: 093******** Relationship: cousin
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
Marcelino Tuñacao Sustal
FULL NAME and SIGNATURE APPLICANT