Mamdouh Mohamed Ali Ghazy
Nationality Egyptian
Year of Birth 1962
Profession Chemist
Specialization Environmental specialist
Position in Group Senior Environmental Engineer
Current position Environmental specialist
Company AECOM
Current location NEOM, Saudi Arabia
Preferred locations Saudi Arabia, UAE, Qatar
Salary Expectation Not Specified/Negotiable
Year of experience 34 Years
KEY QUALIFICATIONS
Over 34 year’s professional experience in process report & lab fields related to sewage treatment as lab Manager, R O, ion exchange, supervision and process advisor of sewage treatment plants and environmental impact assessment (EIA) studies .
EDUCATION AND PROFESSIONAL STATUS
Bachelor Degree in Chemistry, may, 1984 Alex University Egypt.
Member, Egyptian Syndicate of Scientific Professions. No 24912
Approved from Presidency of Metrology & Environmental (PME) - KSA. COMPUTER SKILLS
Windows XP.
Office 2003 (Excel – PowerPoint – Microsoft Word, Microsoft project).
Biowin 2 and 3 for STP simulation
Ability to uses Computer chemistry programs
Environmental and lab analysis studies.
EXPERIENCE RECORD
Dynamic Professional with extensive32 years of industrial experience in Environmental Management, Operations and Project Management in Manufacturing Industry as well as in chemical engineering operation services. Excellent analytical skills & capable of handling independently all the responsibilities. Confidence to make conclusions, decisions and proper action. Long experience in preparing the scoping report for EIA studies for major projects.
12/01/2022 – present AECOM CO, K S A
Position: Environmental Specialist Engineer (4projects) Neom, K S A Job profile: Environmental Engineer in Neom zero outer region area In addition work at Sindalah island project ( Nesma contractor cluster 2 Yacht club & Restaurant)
Environmental engineering & evaluations and monitoring during project construction
Make environmental monitoring tests for land and sea water before and during marine construction work.
Make site inspection and observation for project activity
Team work effective planning, problem solving and organization. Project, Scheduling management and Monitoring.
Prepare weekly environmental inspection report on ENAPLON 09/04/2020 – 31\12\2022 SAUDI CONSULTING SERVICES CO, K S A Position: Environmental Engineer (on shore –off shore project) umluj, K S A Job profile Environmental Engineer in THE RED SEA DEVELOMENT COMPANY PROJECT IN UMLUJ for LAND RAISING PROJECT
Environmental engineering & evaluations and monitoring during project construction
Make environmental monitoring tests for land and sea water before and during marine construction work.
Make site inspection and observation for land raising project activity
Team work effective planning, problem solving and organization. Project, Scheduling management and Monitoring.
02/10/2017 – 8/4/2020 Green Lawns Environmental Consulting (GLECO), Jeddah, K S A Position: Environmental studies specialist,
Job profile
EIA study for Bin laden industrial CO LTD Hot Dip Galvanizing Plant
EIA study for Petromin co Jeddah
EIA study for Addada &Kabani for kitchens in Makkah
EIA study for Fahid poultry farm Plant in Abha
EIA study for Jotun Plant in Jeddah
EIA study for Makkah Warehouse factory in Makkah
EIA study for Zakzoz factory for metal industry in Makkah
EIA study for Mymon factory for spices in Jeddah
EIA study for Arabain company for packaging in Jeddah
EIA study for sweet water company Plant in Damam
EIA study for Attwoa factory for Liquid Soup and chemicals 11/06/2008 – 1/10/2017 Mohamed Turki Mott MacDonald (MTMM) Position: Environmental studies specialist, process report Jeddah, K S A Job profile
This firm is consists of many companies one of them Mtmm for consultancy engineering and work at three major project at that time one of them is master plane of jizan region and designs all project such as stp waste water treatment plant and my role was to prepare process report for stp for all capacities
The second project was pipe line water for sweec and my role was to evaluate the bidders offers
The third project was stp in Jeddah air port capacity 125000cubic meters per day our role was consultancy for the owner designs and review all design submitted and construction supervision
One company of the firm was for environmental services and my role was Environmental engineering & Impact assessment studies, data collection, analysis and develop EIA scoping report for all stages of the project cycle from initial environmental evaluations through full EIA to monitoring during project construction and operation. Team work effective planning, problem solving and organization abilities Project planning, management, scheduling and Monitoring. Preparation & study of prequalification, bids / tender /proposal documents, technical controlling of process documents for various projects
Marin pollution : regarding marine pollution our company with partnership Termo kimik Italian company get license from PME to del with Marin pollution caused by power plant stations in all Saudi Arabia this technology called FGD technology It means flu gas desulphurization technology this technology will remove and print all seawater pollution (SOs, NOs, and heavy metals) by using limestone and also produce good by product (gypsum) which will be used in many industrial purposes Some projects worked on
EIA study for Alrady Factory for glucose and starch
EIA study for Dilmon Products LTD ( I F C O ) for oil refinery
EIA study for bawazeer factory for Tissues and Diapers
EIA study for Bin laden industrial CO LTD Hot Dip Galvanizing Plant
EIA study for Marine Works at Shoaiba Power Plant Extension Stage III
EIA study for Al-Umrah Plant for drinking water in makkah.
EIA study for Agaeb factory for Food industry.
EIA study for Attwoa factory for Liquid Soup and chemicals.
EIA study for Saudi foam trays factory in Jeddah.
EIA study for Hosam Uddin Blocks factory in Usfan .
EIA study for Al-Najem factory for Steel Manufacturing.
EIA study for Hotel Supply factory for Liquid Soup, Cram and Detergents.
EIA study for Adnan Abu Al-Reessh crushing plant for Volcanic Pozalan Stons.
EIA study for Al-waad al- Moshriq factory for cement blocks.
EIA study for Masoud Al-saedy blocks and concretes factory.
EIA study for L & T Electricals Saudi Arabia CO in Dammam. From 01/02/2003 to 11/06/2008 Tertiary Treatment plant Taif, K S A.
Position: lab manager and process control and advisor Job profile
Responsible for three labs sewage treatment plants for all analysis and process advisor This company was contractor and was responsible for operation and maintenances for tertiary reuse STP and my role was lab manager and process advisor
1. Analytical Lap studied and analyzer
2. Biological treatment control.
3. Design of solutions for activated sludge system problems. 4. Process advisor
From 19 /02/1989 to 1/2/2002
Position: operation chemist Bieda Dyers Company for Textile Final Fishing
- Alex, Egypt
Job description
Operation of waste water treatment plant
R.O & Ion Exchange for water plant
Job profile
1. Deal with Modern Scientific apparatus
2. Design of solutions for activated sludge system problems. From 01 /04/1987 to 19/02/1989
Position: Sales Chemist Modern Scientific Foundation for Apparatus lap Company
- Alex, Egypt
Job description
Technical Support and Description of all Apparatus related to water and waste water lab Job profile
1. Training for representatives and crew
2. Make new markets.
From 01 /04/1984 to 01/07/1987
Position: market crew supervisor Chemist Hospital‘s, Lap of Forced Army
- Alex, Egypt
Job description
Responsible for all analytical lab tests
1. All analytical Lab tests
2. Deal with very good analytical apparatus
TRAININGS:
Project planning and management (Box of Technical Support).
English aided study (British Council in Alex, Egypt).
Quality control (Box of Technical Support).
LANGUAGES:
Arabic Mother tongue
English very Good – spoken & written
Mo N 0543627185-0508576241
E-mail: *************@*****.***
Mamdouh Mohamed Ali Ghazy Page 2 of 4