Resume:

adzm6e@r.postjobfree.com +20-109-***-**** Egypt

Personal Information

Name: - Islam Abdel monem Khalil

Address: Kom Hamada, Behera, P.O.22814 Egypt

Nationality Status: - Egyptian Material Status: - Married Telephone / E-mail:- +2-010*-***-**** / E-mail: adzm6e@r.postjobfree.com Education: - Mechanical Engineer )May 2002) Menofiyah University

(Post graduate studies Diploma in (power Generation) Tanta University 2015 with CGPA 3.46 very good)

Experience Summary

1: operation manager : lead the Operations staff and manage all aspects of operations of a power plant to ensure safe, environmentally compliant and efficient operations of the plant. Nubaria III (2020 to now)

1: Lead operation engineer: Plan, develop, coordinate, manage and direct Supervises of all operation work (Lead 4 shift in charge engineer) in Nubaria I&II CCGT Power station (Nov 2013 to 2020)

1: Lead Commissioning engineer: follow-up the design, submittals, Installation, Sit acceptance tests, Commissioning and Start up engineer for Sabiya CCGT combined cycle Gas Turbine Power Project as consultant in Kuwait ministry of electricity and water MEW 2010-2012

2: Senior (shift in charge) operation control room engineer in 1500 MW combined cycle power station.

3: Commissioning, steam blow out, start up, and operation Engineer for HRSG boiler. 4: Pre commissioning and commissioning senior engineer and start up engineer for 8 GE gas turbine frame 9E .

5: CCGT Power plant, Gas turbine, DCS, HRSG & Steam turbine operation engineer 6: Last Two Years Training courses: ( PMP and Negotiation, Effective Communications,, Effective Leadership and motivation, RCA, Effective Team Building, Change Management, strategic planning, process analysis, GOVERNANCE, Iso 9001, Risk Assessment) adzm6e@r.postjobfree.com +20-109-***-**** Egypt

COMPANY NAME : Nubaria III power station 750 MW (Middle Delta Electricity Production company, Egypt) Date JOB POSITION JOB DISCRIBTION

Lead the Operations staff and manages all aspects of operations of a power plant to ensure safe, environmentally compliant and efficient operations of the plant.

Monitor plant and unit performance, conduct root cause analysis, and lead investigations to develop and implement corrective actions

Set maintenance priorities and schedules maintenance for the plant in conjunction with the Maintenance Manager

Developed, implemented and revised operational policies and procedures which improved plant performance and ensured consistent operations between crews.

Fulfill the responsibilities of the Plant Manager position in their absence.

Achieved for the company savings of approximately 6 grams/kw by rearranging the priority of load rising on the units in coordination with the Dispatch center.

The plant consist of 2 modules, each one has 2 GE gas Turbine, 1 Alstom STEAM TURBINE and 1 STF HRSG

2020

to update

Operation Manager

Nubaria III Combined

Cycle Power Plant

750MW)

COMPANY NAME : Nubaria 1&2 power station 1500 MW (Middle Delta Electricity Production company, Egypt) Date JOB POSITION JOB DISCRIBTION

Nov 2012

to update

Lead Operation

engineer

Nubaria Combined Cycle

Power Plant 1500MW)

Responsible for all functions relating to facility operation . Direct plant operation staff to complete operations and tasks within environmental and regulatory compliance

requirements, with a focus on safety, quality, and achievement of the facility’s goals availability and reliability.

The plant consist of 2 modules, each one has 2 Siemens gas Turbine, 2 Alstom HRSG and 1 Mitsubishi Steam Turbine adzm6e@r.postjobfree.com +20-109-***-**** Egypt

COMPANY NAME : KHARAFI NATIONAL & MEW, KUWAIT

Date JOB POSITION JOB DISCRIBTION

Senior Mechanical Commissioning Engineer in the ministry of electricity and water in Kuwait : follow the construction and commissioning steps and start up procedure . for Sabiya CCGT (which consists of 3 Modules, each one consists of 2 GE gas Turbine, 2 HRSG Hyundai and 1 GE Steam Turbine. Coordination with contractors and consultant for the site constructions, erection commissioning testing.

on all the mechanical constructions

drawings, submittals and documents related to new Gas Turbine power plant.

Coordinate the day to day commissioning activities related to mechanical plant equipments.

Attend site mechanical commissioning meeting

Maintain a detailed log book covering the day to day note of all mechanical activities in the plant

Attend testing and inspection activities related to mechanical plant equipments

Coordinate and witness mechanical precommissioning / commissioning activities at the site.

Follow up mechanical test on completion of the plant.

Responsible to attend all turbines Tests

(cold.warm,hot start,minimum stable load, emission test,acoustic test, load rejection, half condenser,etc

,estimating efficiency of gas turbine in thermal

performance test.

Day to day follow the plant performance during Reliability period

Develop a punch list, identifying defects and negotiate a solution with the EPC contractor without ambiguity and unnecessary delays.

Negotiating with the EPC Contractor on behalf of the owner to ensure root causes of system defects are

understood and resolved to acceptable standards.

From

2010

To April2011

AND

From Sep.2011

to Oct.2012

Owner

Commissioni &

start up engineer

(Sabiya CCGT 2000

MW)

Ministry of Electricity and

Water in Kuwait MEW

(Manpower supply from

Kharafi national)

2 Years

brief : Responsible of all Commissioning activity in CCGT as owner engineer adzm6e@r.postjobfree.com +20-109-***-**** Egypt

Company name: KHARAFI NATIONAL, EGYPT

Date JOB POSITION JOB DISCRIBTION

Commissioning and start up Senior mechanical

commissioning engineer in el shabab power station project in Egypt responsible for all pre commissioning, flushing and commissioning process for 8 GE gas turbine frame 9E And start up & operation engineer during first fire and all turbine and generator tests, and operate the unit during reliability Period.

April 2011

to

sep 2011

Commissioning engineer

5 months

brief: Responsible of pre commissioning, commissioning and start up engineer company name : NUBARIA POWER STATION, EGYPT( Middle Delta Electricity Production Company) Date JOB POSITION JOB DISCRIBTION

From 2008

to 2010

Shift in charge

operation control room

engineer

in

Nubaria power

station1500 MW

Lead the engineers and technical groups to operate 4 Combustion Turbine Generator (Siemens), with 2 combined Steam Turbine Generator (Mitsubishi) and 4 HRSG

(Alstom)boiler and all related equipments.

follow the dispatch load request.

perform periodical test.

shut down and start up the unit.

operate the unit in disturbed situation.

collect and analyze periodical data.

follow and deal with alarms in control room

perform necessary measures before equipment start up.

follow operation specification.

analyze equipment efficiency.

check availability of stand by equipment.

lead in the shift personnel and equipments.

detected defect.

record and write all necessary information logbook Total 2 years

brief: shift in charge CCR in 1500 MW CCGT

adzm6e@r.postjobfree.com +20-109-***-**** Egypt

company name : NUBARIA POWER STATION, EGYPT

Date JOB POSITION JOB DISCRIBTION

2004 to 2006

Gas turbine operation

engineer

Commission, start up and operation for four Siemens V94.3A Gas turbine 250 MW responsibility as gas turbine operator shift engineer.

Supervision to installing and construction steps to gas turbine.

attending first fire to gas turbine with Siemens commissioning engineers.

standing up as operator shift engineer during commission and generator protection tests.

Start up and shut down the unit in safe mode

Responsible to estimating efficiency of gas turbine during performance test.

working as operator shift engineer during reliability period. Total 2 years

brief: Gas Turbine Operation Engineer

company name : NUBARIA POWER STATION, EGYPT

Date JOB POSITION JOB DISCRIBTION

2006 to 2008 HRSG

Commissioning and

Start up Engineer

After taking a training in France in operation the HRSG (Jan 2006) Alstom

I was a leader of the team whom is concerned of doing Steam blow out, trevi test review, site acceptance engineer after that I work as operation engineer

commissioning and first start up of the HRSG

boiler (HP/IP/LP drum 125/25/5 bar) and Steam Turbine and operate the combine cycle in reliability period and performance test

achieved safe and reliable commissioning and start up of all BOP

Total 18 months

brief: combined power plant startup and operation engineer company name : DAMANHOR POWER STATION, EGYPT

Date JOB POSITION JOB DISCRIBTION

2002- 2004 operation engineer

operation engineer for small CCGT 158 MW 4x4x1

4 GAS Turbine

4 NEM, HRSG

1 Steam Turbine

Source: all reference paper available at request



Contact this candidate