Post Job Free

Resume

Sign in

Section Engineer Civil Engineering

Location:
Hyderabad, Telangana, India
Salary:
2 lakhs+perks
Posted:
September 12, 2023

Contact this candidate

Resume:

PRAKASH V

Contact: +91-824******* / E-Mail: adzm14@r.postjobfree.com

Seeking senior level managerial assignments in Site & Construction Management (Civil) with a leading growth oriented organization

PROFESSIONAL PROFILE

A dynamic professional with over 37 years of rich experience in Civil Engineering Projects while being associated with The Indian Railways since 1987.

Comprehensive experience in planning, scheduling and executing construction of numerous Bridges and related projects involving planning, budgeting and resource administration, with a flair for adopting modern methodologies in compliance with quality standards.

Strong relationship management, communication skills with an ability to identify & network with Project Members, Consultants / Clients / Vendors / Suppliers / Sub-Contractors & other utility agencies with consummate ease.

Excellent analytical, troubleshooting & inter-personal skills with proven abilities in providing effective assistance to the Section Engineers, Junior Engineers (Grade 1 and 2) for allotment of works as well as their career advancements for achieving quality, process improvement & cost savings in the projects.

Fabrication of steel and erection works

Key Skills

Site / Construction Planning Project Management Contracts Administration

Budgeting & Cost Control Estimation & Rate Analysis Techno Commercial Negotiations

Reporting & Documentation Tendering & Contracts Client & Sub Contractor Billing

Policies & Procedures New Works Proposals Liaising & Coordination

ORGANIZATIONAL EXPERIENCE

National Asphalt Products & Constructions, Manuguru Jr.Engineer Nov’83toJan’85 Laxman Rao and Company, Hyderabad Site Engineer Feb’85 to Feb’86

Indian Railways Since Mar’87

Mar’87 to May’88 Trainee Engineer – Bridges, Hyderabad.

May’88 to Jan’93 Jr. Engineer Grade II – Bridges, Purna, Maharashtra

Jan’93 to Jun’96 Jr. Engineers Grade 1 – Bridges, Secunderabad, A.P

Jun’96 to Nov’06 Section Engineer (Bridges), Purna, Maharastra/Secunderabad

Nov’06 to Aug.15 Senior Section Engineer (Bridges) – Secunderabad(Hyderabad division)

Aug 15 to July19 Sr.Section Engineer (Bridges) Secunderabad Division.

July 19 to Aug22 Assistant Divisional Engineer/Karimnagar.

Aug 22 to till date Assistant Divisional Engineer (Bridges)/Secunderabad.

Assignments Handled as Assistant Divisional Engineer (Bridges) at Secunderabad.

Maintenance of Bridges on section from Secunderabad to wadi,Vikarabad to Parli, Secunderabad to Ballarsha,

Kazipet to Vijayawada,Dornakal to Manuguru and Jagyyapeta to Moutmarri.

Laying H Beam sleepers on Bridges.

Provision of Side foot path for girder bridges.

Construction of FOB and Sub ways.

Inspection of all bridges

Assignments Handled as Assistant Divisional Engineer/Karimnagar at Secunderabad Division.

Maintenance of section from Peddapalli to Nizamabad. (177 KMS)

Track /Buildings/Bridges.

Increased speed of Nizamabad to Karimnagar 100 kmh and Karimnagar to Peddapally 110Kmph.

BCM done from Jagityal to Gangadhara.

TRR of 25 kms done and relaxed speed restriction of Goods trains from 30Kmph to 60Kmph.

Provision of side drains for a length of 70 kms, ballast retainer walls, pitching of banks and bridges carried out.

CRS inspection of RE project and 3rd line on KZJ – PDPL attended.

BCM done for 35 kms in record time of 15 days with one HOBCM,2BCM,1Hot 3X and 1 CSM with proper planning and

the work completed without detention of any running trains.

Casting twin rcc boxes for cannal xing of 4.5m(Width) x13m (length) by pushing method inserted in to bank of

height 9.5 m duly providing Rail cluster.

Increased sectional speed from 50kmph to 100kmph.

Improvement to Loading platform of Goods shed with released PSC sleepers by saving a cost of 2.0cr and

Developed 2 goods shed and all 3 shed works completed in 10 days without hampering the loading.

Improvements to loco running room

Removal of points and crossing at 2 stations(Poodur and Nukala mallayi) and made through relaxing speed from 15

KMPH to 30 KMPH.

2 Duomatic and 1 UTV and 1 BRM machines were handled for maintains of track.

Improved track running between Nizamabad to Jagitayal to 70 KMPH as it was 20,30 and 50 KMPH

Assignments Handled as Sr.Section Engineer (Bridges) at Secunderabad Division

Maintaince of section from Kazipet to Secunderabad,Secunderabad to WADI,Hyderabad

Vikarabad to Parli

.

Maintains of steel/PSC RUB.ROB.FOB and other steel structures.

Carried out Foot over bridge work at Secunderabad station.

Templating of structure as per drawing, Testing of welds in Non-destructive method, Fabrication of structure as per

IRS B1 2000.

Carried out work of provision of Escalators at LPI stn

Launching of Boxes at various location for underpass (Sub ways) in lieu of Manned/Un manned level crossings.

Carried out launching of 42 mtr composite girders at Raigiri (Road connecting to Yadagiri temple)

Checking of Raw materials, Checking as per QAP (RDSO guide lines)Conducting test for welders as per RDSO,Tests

On Welds samples of girders, Checking of HSFG bolts as per RDSO guide lines, Checking of camber as per drawing.

Carried out construction of FOB at HYB and LPI stns

Carried out provision of Escalators at HYB station.

Launching of 46 mtrs composite girders at Ghataskar for outer ring road.

Launching of 46 mtrs composite girders on Sadasiva pet to Gulbarga NH.

Alignment and rails renewal of gantry track at Electric Loco shed Lallaguda.

Assignments Handled as Senior Section Engineer (Bridges) – Hyderabad

Fabrication and Erection of 1050 MT of steel work did (i.e cover over plat forms, Foot Over Bridges, and Track circuited steel channel sleepers. Total cost of work is 18crs executed in 16 months.

Checking of Templates, Inspection of Jigs for fabrication and tests on welds in Non Destructive method.

Errection of 46 meters of PSC Span for outer ring road at Shamasabad and Goudavalli

Re girdering of 12.2 meters spans of 9 no’s done including Laying of Track circuited steel channel sleepers

Preparation of estimates for various works and rate analysis

Fabrication and Erection of 300 MT; Duration: Six months.

Recording Camber for PSC, Bridges.

Executing Road Over Bridge connecting International Airport at Hyderabad: This project was completed in coordination with GMR as well as L&T.

Eight Cores of Work:

-Renewal of Bridge Timber with Galvanized Steel Channel Sleepers on Major Bridges Krishna (34*24.4 m of span).

-Tungabhadra (45*18.3 m of span): This was completed in a record period of two months.

510 Km. Stretch on AP and Maharashtra for Bridges, Foot Over Bridges, Road Under Bridges, Road Over Bridges, Flood Light Towers and Work Shop Structures.

Construction of Foot Over Bridges, Road Over Bridges, Road Under Bridges, Plat Form Shelters, and Rebuilding of Minor Bridges with P.S.C Slabs.

As Section Engineer (Bridges)

Assignments Handled

900 Km. Track Stretch on A.P, Maharastra, M.P: This involved inspections of all Bridges (Steel) 6.1 m to 100m span, PSC Bridges of 12.2 to 24.4 m span, Flood Light Towers, Workshop Structures, Foot Over Bridges, Tunnels as well as the Turn Table.

Construction of Foot over Bridges at major stations while gauge conversion work was carried out.

Maharashtra State Govt. Deposit Work worth Rs. 1 crore: This involved construction of Foot Over Bridge at the Aurangabad Station.

Restoration of:

-Track for the Breach occurred at stretch of 2 1\2Km: This was completed within 5 days and normal traffic was restored at Akolla.

-Washed Bridge of 5*12.2m Span near Bellampalli on Delhi bound route: This work was completed in 10 days amongst extreme climate conditions dully laying calendar Hamilton span.

Renewal of 5*6.1m Span Distressed RCC T Beams with PSC Slabs.

Recording Camber of PSC and Steel Bridges 100ft and Above.

Key Deliverable as Jr. Engineer - Grade 1 Bridges

Assisting the Senior SSE (Senior Section Engineer) (Bridges), SE (Section engineer) (Bridges) in regular working.

Assignments Handled

Construction of:

-Road under Bridge for Outer Ring Road at Hyderabad connecting NH7 of span 2*12.2 RCC T Beams.

-Foot Over Bridges on Suburbs of Hyderabad.

Rebuilding of Miner Spans under Traffic with PSC and RCC Box.

Restoration of traffic:

-At Sirpur on Delhi Bound Road for the Derailment Occurred on 4*150ft through Span: All major repairs were carried out dully relaxing speed restriction.

-Due to derailment of Train on 15*12.2 Plat Girder near Bhadrachalam.

Assignments Handled as Jr. Engineer - Grade II Bridges

Execution of ten distressed minor Bridges by replacing with PSC and box for improving the speed on bridges.

Restoration of Breach of Track – This involved approximately 8km. of track including 5*6.1m Bridge restored in 15 days by making temporary arrangements to the bridge.

Laying:

-Diversion of Track and Fabrication, Launching of 5*12.2m Span Welded Girders

-RSJ Sleepers: This involved involving designing of suitable meter gauge and broad gauge.

Construction of 2*18.3 m Girder Bridge Dully Extending Existing Bridge due to Wash Out for Increasing Water Way.

Key Deliverables as Trainee Engineer - Bridges

Receiving training at the Zonal Civil Engineering Training Centre, Hyderabad including several practical trainings.

Laxman Rao and Company, Hyderabad Feb’85 to Feb’86

Site Engineer

Key Deliverables

Looking after 3 sites including: 1) BHEL R&D Balanagar 2) Shubodaya Chocolates (Nopan Group) IDA.Bollaram 3) Radiant Cables, Hyderabad.

Preparing estimates & bills for all the works in coordination with BHEL R&D Engineers, Nopan Group as well as the Chandrawakar Associates.

National Asphalt Products & Constructions, Managuru Nov’83 to Jan’85

Jr. Engineer

Project Undertaken

Survey for 8 Sq. Km. and Computation of Areas for Site Grading Work; Worked with Heavy Water Plant, Mann Guru, A.P., in coordination with Tata Projects Ltd. & Engineers India Ltd.

Key Deliverables

Fixing:

-Reduction levels of site grading with balancing cutting & filling.

-Centre line for drains and roads including laying roads.

Awards / recognitions:

-South central railway general managers award, principal chief engineer awards, divisional railway manager award’s

Trainings undertaken / imparted:

-Construction and maintenance of bridges(steel/PSC.), fabrication /erection of girders, numerical rating system for bridges, underwater inspection of bridges

Major contracting works:

-Executed 5 cores of laying of steel channels sleepers on bridges, 10 cores of construction of cover over platforms and foot over bridges.

Executed works of 15 cr of FOB/Escalators works

Major liaising / coordination work with the government / regulatory authorities:

-Works related to nh-7 road over bridges coordinated with l&t,gmr, nhai, muncipal coorpation of Aurangabad, ircon,GHMCand R&B

ACADEMICS

Diploma in Civil Engineering from J.N. Government Polytechnic, Ramanthapur with First Division, 1983.

PERSONAL DETAILS

Postal Address : H.No.:18/3, Vasantha Residency, Flat No. 102, Gopalnagar, Malkajgiri, Hyderabad,

500047.

Date of Birth : 1st June, 1964.

PRAKASH VASANTHAWADA



Contact this candidate