Post Job Free

Resume

Sign in

Electrical Inspector Industrial Electrician

Location:
Central, Tarlac, Philippines
Posted:
September 08, 2023

Contact this candidate

Resume:

POSITION APPLIED:ELECTRICIAN

RUEL B. OLFINDO

Burgos, Basey, Samar, Philippines

Contact Nos. +63-961******* (Phil.)

PROFILE:

Experienced as Electrician, Telecommunication and Electrical Inspector, with knowledge on related International Codes and Standards like BICSI, NFPA 70 and NEMA. These were used as reference in the execution of my duties and responsibilities.

OBJECTIVE:

To ensure the quality of electrical& telecommunication activities at site in conformance with international codes, standards and project specifications. WORK EXPERIENCES:

I. POSITION : QC TELECOM. INSPECTOR

COMPANY : Thabat Contracting Company

(Previously Al-Muhaidib Contracting Co.)

PO. Box 9291, Jeddah 21413, Saudi Arabia

PROJECT : Aramco Research Center

(July 22, 2017 to Dec. 10, 2020)

PROJECT : KAUST Research Park Support Facilities

(March 14, 2016 to July 20, 2017)

Job Description:

• Witness commissioning test of Structure cabling, UPT and Fiber Optic Cable.

• Monitoring site activity and advice the construction to implement the proper installation as per project specifications and standards.

• Responsible to all communication site inspection as per Saudi Aramco Typical Inspection test Plan (SATIP).

• Day by day inspection of all construction activities.Witnessall installed communication conduits, cable tray, cable laying and testing during construction based on the approved drawings and project specification. Preparation of testing report and QC record.

• Ensure conformance of work on-site as per standards such as (NEC, BICSI, NFPA, Project Specifications and others.) Assure conformance of work as per Technical Specifications and Design Scope. Assures Material delivery and Installation as per Approved Material.

• Monitoring and updating the calibration of all Communication testing Equipment and organize the preparation of communication cable test result and Instrument Loop Packages.

II. POSITION : QC ELECTRICAL INSPECTOR

COMPANY : Al-Muhaidib Contracting Co.

P.O. Box 9291, Jeddah 21413, Saudi Arabia

PROJECT : KAUST Research Park Infrastructure

(January 28, 2015 to March 12, 2016)

Job Description:

• Implementing coverage of proper installation, wiring and cable laying, cladding, termination, witnessing of insulation resistance test and Hi-pot test.

• Coordinate and assist construction to resolve any encountered problems related to inspection and testing activities to meet schedule and avoid any delay of activities.

• Witness RMU for Phase to Phase High Voltage test.

• Inspection & testing of all power distribution system.

• Witness pre-commissioning of Transformers system, MV and LV side.

• Preparation and submittal for Pre-com RFI and pre-commissioning documents.

• Maintain and update quality documents for offices/sites.

• Daily surveillance of site activities.

• Issues non-conformance report that does not comply with Saudi Aramco Engineering Standards.

• Internally check the RFI raised by construction team before raising it to Saudi Aramco Project Inspection Division.

• Ensures that work activities are carried out as per approved and latest issued for construction drawing & specification.

• Weekly updating the RFI, test, and material receiving inspection log.

• Ensures that as-built information is recorded daily on the QC copy of the drawings.

III. POSITION : QC ELECTRICAL INSPECTOR

COMPANY : Al-Muhaidib Contracting Co.

P.O. Box 9291, Jeddah 21413, Saudi Arabia

PROJECT : Thuwal Development Project (KAUST-

ARAMCO Project)7 Schools, 1 Medical Clinic

and 1Grand Mosque

(September 05, 2011 to January 27, 2015)

Job Description:

• Monitor the performance of construction to ensure the respect of work standards and project specification.

• Inspect and witness the construction works as per their approved Inspection Test Plan.

• Verify the equipment and devices used in the project meets the required specification per project requirements, Standard and tested in accordance with the procedures.

• Monitor the underground installations; check the required burial depth and spacing requirements to adjacent installation, prior to backfilling.

• Preparation and submittal for RFI.

• Review and Inspection of all Electrical Material, prior to Installation.

• Inspection of electrical installation Panels Monitoring control panel wiring, Termination, cable routing & cable tray installation.

• Inspection of Ground Rod and Grounding cable, as per standard and Specification.

• Witness for Pre-commissioning relative to electrical activities.

• Measuring of grounding values of the Earth pits and record the readings refer to requirements.

• Daily monitoring the construction activities.

• Reviewing pre-commissioning packages and making punch points and conduct for testing.

• Monitoring the on going daily construction activities. IV. POSITION : INDUSTRIAL ELECTRICIAN

COMPANY : D.M. CONSUNJI, INC.

ENGINEERS, CONTRACTORS

Makati City, Philippines

PROJECT : Skyway Stage-3Muntinlupa City Philippines

(July 15, 2009 – Aug. 04, 2011)

Job Description:

• Repair electrical parts and assembled accessories prior to installation.

• Capable to test, install, repair, and maintain electrical equipment and machines.

• Complete understanding of the safety rules applicable in electrical field.

• Exceptional ability to replace old electrical system wiring installed.

• Capable to install and service street lights, electrical systems regularly.

• Troubleshoot problems in electrical circuits.

• Installed different electrical equipment by using hand tools and power tools. V. POSITION : INSTRUMMENT TECHNICIAN

:

COMPANY : MOHAMMAD AL-MOJIL GROUP

Dammam Saudi Arabia.

PROJECT : Hawiyah Khurais WIPS

PROJECT : Saudi Aramco Shell Refinery (SASREF)

Job Description:

• Coordinate with assign foreman.

• Install conduit and cable tray with support for instrument cable.

• Install instrument cable and testing (Insulation resistance and Continuity test).

• Excavation of trench for grounding and instrument cable.

• Grounding bonding termination of cable tray and conduit.

• To be present while conduct safety tools box meeting.

• Be aware in safety precautions of surroundings before start the work.

• Review the drawing (sketch) plan.

TRAINING ATTENDED:

a. Industrial Electrician MWV

Agency EdsaOrtigas Metro Manila Philippines

Nov. 21 to Dec. 02, 2007

b. Rural Barangay Electrician TESDA

In Coordination w/ the Provincial Govt. of Samar,

LGU-Basey and TESDA Samar Provincial Office

October 16, to October 20, 2000

EDUCATIONAL ATTAINMENT:

Vocational : Quezon College of Tacloban, Tacloban City General Radio Communication Operator

1996-1998

Secondary : Basey National High School

Basey, Western, Samar

1989-1993

Primary : Burgos Elementary School

Burgos, Basey, Western, Samar

1983-1989

PERSONAL INFORMATION:

Date of Birth : January 24, 1975

Place of Birth : Burgos, Basey, Samar

Gender : Male

Civil Status : Married

Citizenship : Filipino

Height : 162 cm

Weight : 141Lbs.

Name of Spouse : RitchelG. Olfindo

Mother’s Name : Miguela B. Olfindo

Father’s Name : Pablo P. Olfindo



Contact this candidate