Results-driven professional with 22 years of expertise in Roads & Bridges, Project Management,

Construction Management, Site Management, Quality Management, and Vendor Management.

Experienced in NHAI, GHMC, MORTH, NRDA, TNRSP and PWD projects, ensuring compliance with

standards, timely completion, and optimal resource utilization. Skilled in coordinating diverse teams and

delivering successful project outcomes. Strong in risk management, stakeholder communication, and

budget control. Reliable and efficient in driving project executions.

Technical Skills

• MS Office (Excel, Word, Power Point etc.).

• Auto CAD-2004.

• Primavera - P6 Project Management & MSP.

• Internet Communications.

• Social Networking & Mail Drafting.

• ERP

Employment History

BACHALA BALAIAH COMPANY

Jr. Engineer (Highways) (April 1999 to April 2001)

Employee: Roads & Buildings (ECRP) Department.

Project: Widening & Strengthening of Palamaner to Krishnagiri road 0.000 to 20.000 km.

Project including the widening and strengthening of existing roadways, such as WBM Road and BT

Road, were successfully constructed and performed. Expertise in enhancing infrastructure and

increasing road durability for better safety and efficiency.

ROADS & BUILDINGS (ECRP) DEPARTMENT, TIRUPATHI

Jr. Engineer (Highways) (May 2001 to Dec 2001)

Project: Widening & Strengthening of Palamaner to Chittor Road.

Proficiently managed road widening and strengthening project, encompassing WBM Road and BT

Road, while overseeing quality control checks, meticulous level book maintenance, and thorough

bill verification.

M/S B. SEENAIAH & CO (PROJECTS) LTD

• Site Engineer (Structures) (Jan 2002 to Aug 2004)

Employee: National Highways authority of India (on BOQ basis).

Consultant: SNC-Lavalin international associated with Sheladia Associate & Consultant Pvt Ltd.

Project: Project (KU-4) contract package four laning & Strengthening.Km 0 to 23 of Bhilwara by pass

& from Km 137.500 to Km 183.000 of NH-79 (Bhilwara-Chittorgahr section in Rajasthan).

As a Site Engineer (Structures) from January 2002 to August 2004, I was involved in significant

projects in Rajasthan. This included the construction of Banas River Bridge with 22 spans of 39.5

meters each, utilizing cast-in-situ PSC Box girders, POT PTFE Bearings, and Semi solid circular

piers. Additionally, I contributed to the Pur Flyover Bridge with 3 spans of 25 meters each, featuring

cast-in-situ PSC Voided slabs and Elastomeric Bearings. I also oversaw the lowering of Flyover 1

span by 1.8 meters using a hydraulic Jack System. These projects demonstrated my expertise in

bridge construction, foundation types, and Reinforced Earth panels.

• Site Engineer (Highways - QA/QC Documentation) (Sep 2004 to Feb 2005)

Employee: National Highways authority of India (on BOT basis)

Consultant: Lasa Pvt Ltd

Project: Contract package express way from Km 313+500 to 364+700 at NH-8 (Jaipur-Kishangarh

section in Rajasthan)

During my tenure as a Site Engineer (Highways - QA/QC Documentation) from September 2004 to

February 2005, I was responsible for the Quality Assurance department on the BOT Contract

package expressway at NH-8 (Jaipur-Kishangarh section) in Rajasthan. My duties included

meticulous documentation of lab test results and site reports in accordance with NHAI Quality

Assurance Manual - Appendix 2. Additionally, I conducted regular inspections at the project site to

ensure compliance with quality standards.

• Sr.Engineer (Structures) (Mar 2005 TO January 2009)

Employee: State highway Tamilnadu on ADB Funded

Consultant: Lasa Pvt Ltd.

Project: TNRSP-01- upgrading of roads from Vriddhachalam to Tiruvarur, Tiruvarur Bypass,

Jayankondam to Kumbakonam, Jayankondam to Ariyalur and Ariyalur Bypass.

As a Senior Engineer (Structures) from February 2005 to January 2009, I played a crucial role in

the upgrading of roads in various locations, including Vriddhachalam to Tiruvarur, Tiruvarur Bypass,

Jayankondam to Kumbakonam, and Ariyalur Bypass as part of the TNRSP-01 project. On-site, I

successfully oversaw the construction of key structures spanning 20 kilometers, which comprised

Minor Bridges with Pile and Open foundations, Abutments featuring Cantilever retaining walls, and

Pretension Precast PSC Planks for superstructures, as well as Box Culverts, Slab Culverts, and

Pipe Culverts.

In the office, I efficiently managed the Structures Department, handling various tasks such as

preparing drawings and Bar bending schedules, obtaining consultant approvals, drafting letters,

implementing monthly progress planning and scheduling, and developing formwork designs.

Additionally, I took charge of preparing and approving the monthly Structures Bill of Quantities in

coordination with consultant representatives.

• Sr.Engineer (Highways) (Feb 2009 TO May 2009)

Employee: Naya Raipur Development Authority.Chattisgarh.

Consultant: Sheladia Associates Inc., in association with VAX Consultants Pvt. Ltd.

Project: Construction of New Four Lane Roads (Road Nos 1, 3, 4, 5, 6, 8 & 9B) (Road Nos 2, 7, 9A,

10, 11, 12) 63km in Naya Raipur Development Area, Chattisgarh.Package No: NRDA-PHASE-1/P1 &

P2.

During my tenure as a Senior Engineer (Highways) from February 2009 to May 2009, I was actively

involved in the construction of new four-lane roads, specifically Road Nos 1, 3, 4, 5, 6, 8 & 9B, as

well as Road Nos 2, 7, 9A, 10, 11, and 12, covering a total distance of 63 kilometers in the Naya

Raipur Development Area, Chattisgarh. In this role, I successfully oversaw the execution of

Bituminous (BT) roads and various structures within the project.

CONTINENTAL ENGINEERING CORPORATION PVT. LTD

Sr.Engineer (Bridges) (Feb 2010 TO April 2010)

Employee: Hyderabad Growth Corridor Limited (A joint venture of HUDA and INCAP)

Consultant: AARVE Associates.

Project: Construction of eight lane access controlled Express Way as Outer Ring Road to Hyderabad

city including one Fly Over and a Major Bridge of 122m length.

As a Senior Engineer (Bridges) from February 2010 to April 2010, I was part of the construction

project for an eight-lane access-controlled Expressway serving as the Outer Ring Road to

Hyderabad city, connecting Shamshabad to Gachibowli. My responsibilities included overseeing

the casting, stressing, and grouting operations of Precast PSC-I Girders for 21 Road Over Bridges

with a length of 42 meters (ROBs) each. Additionally, I managed the construction of 36 Flyover

Bridges with lengths of 30 meters each, coordinating the fixing of POT PTFE bearings and

launching of I-girders. Moreover, I played a crucial role in constructing a Flyover using cast-in-situ

voided deck slabs.

KMC CONSTRUCTIONS LTD.

Asst. Project Manager (Structures & Planning/QA/QC) (Dec 2010 TO Aug 2011)

Employee: National Highway of Authority of India

Consultant: Roughton – Aarvee (JV)

Project: Development of Adequate Road Connectivity to Mormugao Port, Goa Project Detail: Four 4

Laning of NH-17B from Km. 13.100 to Km. 18.300 and 4 laning of Baina Road at Ravindra bhavan

junction from Km 1.240 to Km 1.020 including construction of flyover cum ROB up to Gate No. 9 (Km

0.000) of Mormugao Port, Goa.

As an Assistant Project Manager (Structures & Planning/QA/QC) from December 2010 to August

2011, I was involved in the development of adequate road connectivity to Marmugao Port, Goa.

The project included four-laning of NH-17B from Km. 13.100 to Km. 18.300 and four-laning of Baina

Road at Ravindra Bhavan junction from Km 1.240 to Km 1.020. Additionally, it encompassed the

construction of a flyover cum Road Over Bridge (ROB) up to Gate No. 9 of Marmugao Port, Goa.

In my role, I coordinated the structural works for the Flyover cum ROB, which involved the

construction of double-cell Box girders (20 numbers of 33.15-meter spans) and the implementation

of Pile foundations and Substructures. Furthermore, I was responsible for planning and scheduling

the project activities and conducting load tests to ensure the successful execution of the project.

GRAFIX ENGINEERING CONSULTANTS PVT.LTD.

Quantity Surveyor (Sep 2011 TO Jan 2012)

As a Quantity Surveyor from August 2011 to January 2012, I performed estimation of quantities

and rate analysis for eight projects to determine realistic project costs. Additionally, I conducted

detailed project report (DPR) surveys during site visits to gather essential data for the projects.

VASISHTA CONSTRUCTIONS PVT LTD.

Project Manager (Jan 2012 TO Jul 2020)

Employee: PWD, Uttarakhand.

Consultant: Technical Consultancy Services

Project: Construction of 360 Span RCC Prestressed Bridge over Kosi River in Ramnagar on PPP mode

BOT Annuity basis, Uttarakhand.

As the assigned Project Manager for the construction of the Kosi River Bridge in Ramnagar,

Uttarakhand, my responsibilities include overseeing the following tasks:

1. Constructing a 360-span RCC prestressed bridge over the Kosi River in Ramnagar. The bridge will

be built on a PPP Annuity mode.

2. Installation of 10 spans of precast PSC (Prestressed Concrete) I-Girders, each with a length of 36

meters. The total weight of the girders to be launched using a 100 MT (Metric Ton) capacity launching

mechanism.

3. Construction of the superstructure, which involves creating trapezoidal section pier caps and semi-

solid circular pier substructures.

4. Implementing well foundations, which will provide a stable base for the bridge piers.

5. Building five box culverts, utilizing a combination of precast and cast-in-situ methods.

6. Construction of two minor bridges, utilizing RCC T-beams and RCC solid slabs for the

superstructures.

7. Undertaking Road works associated with the bridge project.

As the Project Manager, I will be responsible for coordinating and supervising these activities, ensuring

the timely completion of the project while maintaining quality standards and adhering to safety

regulations.

STUP CONSULTANTS PVT LTD.

Senior Bridge Engineer cum Project Manager (Mar 2021 TO May 2022)

Employee: GHMC, Hyderabad.

Contractor: M. Venkata Rao Infra Projects Pvt. Ltd.

Project’s:

• Construction of 6 Lane Two-way Flyover crossing 7 Tombs Junction (Shaikpet), Film Nagar Road

Junction OU Colony Junction and Whisper valley junction under Engineering Procurement and

Construction (EPC)/ Turnkey Basis.

• Construction of 4 lane elevated Corridor from Road No-45 Jubilee hills to Durgama Cheruvu under

Engineering Procurement and Construction (EPC)- Turnkey Basis.

The project encompasses the following salient features:

Total of 73 spans, including 54 spans of 30m precast PSC girders and 35m to 50m variant steel

composite girder spans for the superstructures.

Construction of 72 precast trapezoidal section pier caps and 2 abutment caps.

Construction of rectangular solid section pier and abutment substructures, totaling 74 in number.

Installation of 74 open foundations.

Construction of RE panels on the approach road, covering an area of 2860 square meters.

Implementation of bituminous and non-bituminous works.

Installation of road furniture and painting works.

Key Responsibilities:

Project Planning: Collaborate with the project team to develop a comprehensive project plan,

considering the specific requirements and objectives of the flyover construction. This includes

identifying key milestones, activities, and deliverables.

Coordination and Communication: Facilitate effective communication and coordination among

the project team, subcontractors, and relevant government authorities to ensure smooth project

execution.

Schedule Management: Assist in creating and maintaining a detailed project schedule, closely

monitoring progress, and making necessary adjustments to ensure the timely completion of the

flyover construction.

Quality Assurance: Collaborate with the quality control team to ensure that all construction

activities adhere to the defined quality standards and specifications for the flyover construction.

Documentation and Reporting: Maintain accurate project documentation, including project

plans, progress reports, change orders, and other relevant records. Prepare regular project status

reports for management, highlighting key achievements, challenges, and any deviations from the

original plan.

Bridge Engineering Expertise: Utilize your specialized knowledge as a Senior Bridge Engineer

to oversee the construction of the flyover's superstructures. This includes monitoring the

construction of spans, precast PSC girders, steel composite girders, pier caps, abutment caps,

and other related components.

Construction Supervision: Provide on-site supervision and guidance during the construction

process, ensuring that all work is executed in accordance with approved plans and specifications.

Quality Control and Quality Assurance: Implement rigorous quality control measures to monitor

construction activities, conduct inspections, and ensure strict compliance with quality standards.

Conduct quality audits to assess project performance and identify areas for improvement.

Road Infrastructure: Oversee the construction of approach roads, including the installation of

various road elements, such as RE panels, bituminous works, non-bituminous works, and road

furniture.

Safety Compliance: Ensure strict adherence to health and safety regulations throughout the

project, promoting a safe working environment for all project personnel.

Bills Certification: Verify and certify the completion of work milestones and deliverables as per

the agreed-upon terms and conditions outlined in the contract. Maintain accurate records of

contractor work completion, certifications, and recommendations for GHMC. Prepare necessary

documentation and reports to support the billing and certification process.

Contract Management: Effectively manage contracts by overseeing negotiations, drafting

agreements, and ensuring compliance with legal and regulatory requirements. Develop and

maintain strong relationships with clients and vendors to drive successful outcomes.

MADHUCON PROJECTS LTD.

Assistant General Manager - Project coordinator (HO) (May 2022 to July 2023)

Employee: MORTH, Hyderabad.

Consultant: R&B(NH), Karimnagar.

Project: Construction of Widening to Two/four lane with paved shoulder from Km. 180.600 to Km.

223.000 on NH-63 on Nizamabad-Jagadalpur Road on EPC mode under NH (O) in the state of

Telangana.

As an Assistant General Manager - Project Coordinator for the construction project key responsibilities:

Project Planning: Collaborate with the General Manager and project team to develop a

comprehensive project plan, outlining key milestones, activities, and deliverables specific to the

widening project.

Coordination and Communication: Facilitate effective communication channels between the

project team, subcontractors and government authorities to ensure smooth execution of the project.

Schedule Management: Assist in creating and maintaining a detailed project schedule, monitoring

progress, and making necessary adjustments to ensure timely completion.

Budget Management: Support the General Manager in budget planning, tracking expenses, and

managing costs throughout the project lifecycle.

Resource Allocation: Coordinate the allocation of resources including personnel, equipment, and

materials required for the project, in coordination with the project team and procurement

department.

Quality Assurance: Collaborate with the quality control team to ensure that construction activities

comply with the defined quality standards and specifications.

Documentation and Reporting: Maintain accurate project documentation, including project plans,

progress reports, change orders, and other relevant records. Prepare regular project status reports

for management, highlighting key achievements, challenges, and deviations from the plan.

Bills Preparation & Submission to Department: Accurately prepare and submit IPC bills,

following the designated billing process, and ensure timely submission to the relevant department,

complying with their procedures and requirements.

Contract Management: Effectively manage contracts by overseeing negotiations, drafting

agreements, and ensuring compliance with legal and regulatory requirements. Develop and

maintain strong relationships with clients and vendors to drive successful outcomes.

Material Reconciliation: Responsible for overseeing material reconciliation, maintaining accurate

inventory records, conducting audits to identify discrepancies, and implementing corrective

measures for efficient inventory management and cost-effective solutions.

Educational Qualifications

Education University Name of the College Specialization Year

Emperial institute of Emperial institute of

Project

EMBA management science management science and 2013

Management

and research, New Delhi research, New Delhi.

Andhra University, SDE,

Bachelor of Andhra University, SDE, Civil

Visakhapatnam. Andhra 2011

Engineering Visakhapatnam. Engineering

Pradesh.

State Board of Technical

Govt. Polytechnic

Education & Training, Civil

Diploma College, Proddatur, 2000

Hyderabad. Andhra Engineering

Kadapa (DT).

Pradesh.

School of Secondary

Siddhartha High School,

SSC Education, Hyderabad, General 1995

Proddatur. Kadapa (DT).

Andhra Pradesh.

Personal Particulars

Nationality: Indian.

Languages known: Fluent in Telugu, English, Hindi & Tamil.

Current address: Flat no 401, Dhanvee Meadows, road no 04, Alkapur Township,

Neknampur, Manikonda, Hyderabad, Telangana – 500089

Marital Status: Married.



Contact this candidate