Post Job Free

Resume

Sign in

Project Management System

Location:
Irvine, CA, 92603
Salary:
Usd 100,000 annually
Posted:
September 07, 2023

Contact this candidate

Resume:

*

Farzad Ghazali

Senior Drilling & Completion Engineer

* ****** ****, ******, ****** States

adzjlr@r.postjobfree.com

Professional Summary

A Business oriented and motivated Senior Drilling & Completion Engineer /Drilling manager with 30+ years of international experience with proven ability to manage drilling and completion operations in challenging environments, horizontal wellbore drilling (short turn) working on land, offshore, arctic environment and artificial islands, focusing on QHSE, risk assessment, well integrity, cost control, optimized drilling processes, and lead drilling teams. Excellent interpersonal, leadership and technical skills.

Highly knowledgeable and proactive in resolving problems, with proven expertise in a wide range of drilling project management, operations activities including drilling, workover, well completion and intervention, abandonment, Madcap drilling (CHCD), side track, re-entry, well testing and well integrity analysis.

Highly experienced in contract development and contract management for drilling and completion materials and drilling technical services.

Work Experience

Block Energy

Senior Drilling & Completion Engineer Dec 2020- Dec 2021

Developed and implemented a detailed, comprehensive plan for the drilling and completion of a 5 horizontal development wells that included all aspects of well construction in Georgia Republic.

Drilled and completed 4 re-entry sidetrack horizontal well with short turn application using Rotary Steerable (RSS) drilling system.

Drilled and completed the wells using dual lateral openhole completion system.

Led well intervention and re-completion operations, designed well stimulations, engineered well work operations and coordinated logistics with multiple vendors. Prepared the well integrity standards for the company particularly on well re-entries and workover operations.

Designed TCP and coiled tubing perforation operations in conjunction with related vendors.

Supervised installation of Realtime Downhole Monitoring System in completion string.

Upgrade the drilling unit with installation of top drive. Iranian Offshore Engineering and Construction Co. (IOEC) Senior Drilling & Completion Engineer/ Assistant Drilling Manager Feb 2015 – Sept 2018

Developed and implemented a detailed, comprehensive plan for the drilling and completion of a 22 J type offshore wells in Persian Gulf South Pars Gas Field.

Drilled and completed two learning wells on each platform to identify drilling challenges and the rest of the wells were drilled and completed in batch drilling with best detailed drilling procedures prepared from learning wells’ lesson learnt in outstanding time schedule and saved 220 days in the project drilling time schedule with substantial project cost saving.

Managed the drilling and completion operations of two jack up rigs working concurrently for detailed drilling procedures, logistics and operations support base activities.

Developed detailed procedures for installation of 7” CRA Mono-bore Completion System in conjunction with Norwegian supplier specially for challenging highly deviated wells.

Modeled and optimized multi-zone matrix stimulation operations resulting in surpassing production expectations and reducing completion cost. Tubular design and stress analysis in long reach and sour service environments.

Prepared Work Program & Budget using Work Breakdown Structure based on project management system (PMP).

Establish and promote safety and environmental performance expectations with employees and contractors.

Analyze, interpret and integrate data from daily drilling reports, directional surveys, mud reports, rig operations, AFE and Budgets, and Geologic Data.

Prepared drilling services invitations to tender, tender evaluation and recommendations.

Perform engineering well surveillance during execution and write post-well engineering reports using established standards.

2

Completion Technology Resources (CTR)

Sales Country Manager Mar. 2013 – Aug. 2015

Worked as Sales Country Manager for CTR a Norwegian manufacturer and service provider for Downhole Completion equipment. The completion equipment specially designed as 7” CRA Mono-bore Completion System” for high rate development gas wells.

Provided training courses for clients’ completion team for design and installation of challenging 7” CRA Mono-bore Completion System specially designed for highly deviated offshore wells. Edison Gas/ Petropars JV

Senior Drilling & Completion Engineer Mar 2008 – Feb 2013

Developed and implemented a detailed, comprehensive plan for the drilling and completion of a 36 J type offshore wells in Persian Gulf South Pars Gas Field development.

Drilled and completed two learning wells on each platform to identify drilling challenges and the rest of the wells were drilled and completed in batch drilling with best detailed drilling procedures prepared from learning wells’ lesson learnt in outstanding time schedule and saved 310 days in the project drilling time schedule with substantial project cost saving.

Managed the drilling operations of two jack up rigs working concurrently for detailed drilling and completion procedures, logistics and operations support base activities.

Developed detailed procedures for installation of 7” CRA Mono-bore Completion System in conjunction with Norwegian supplier specially for challenging highly deviated wells.

Modeled and optimized multi-zone matrix stimulation operations resulting in surpassing production expectations and reducing completion cost. Tubular design and stress analysis in long reach and sour service environments.

Prepared Work Program & Budget using Work Breakdown Structure based on project management system (PMP) for the drilling project.

Track, evaluate, and manage KPI’s to improve operations and identify areas to enhance performance

Analyze, interpret and integrate data from daily drilling reports, directional surveys, mud reports, rig operations, AFE and Budgets, and Geologic Data.

Writes AFE’s and performs economic evaluations on new projects and wells

Prepare accurate cost estimates, budgets and AFE’s

Responsible for preparing drilling and completions programs with reference to applicable company or industry standards

AGIP KCO (AGIP Kazakhstan North Caspian Operating Company) Senior Drilling & Completion Engineer Feb. 2000 – Jan. 2008

Working as Senior Drilling & Completion Engineer to support the drilling and completion activities for development of Kashagan HPHT extremely sour oilfield (%25 H2S) located in North Caspian Sea offshore Kazakhstan, a nature preserved area. (Zero discharge drlling operations)

Implemented proficient well design, directional planning, and torque and drag analysis. Develop and implemented programs to enhance performance.

Designed and executed mudcap drilling (Closed Hole Circulation Drilling) successfully in conjunction with specialized engineering contractor on artificial islands cluster drilling resulted in substantial time and cost saving.

Developed detailed procedures for installation of 5 1/2” CRA Mono-bore Completion System in conjunction with Norwegian supplier specially for challenging ERD wells.

Prepared Work Program & Budget using Work Breakdown Structure based on project management system (PMP).

Designed and executed ERD wells in conjunction with K&M for land cluster drilling and completion.

Analyze, interpret and integrate data from daily drilling reports, directional surveys, mud reports, rig operations, AFE and Budgets, and Geologic Data.

Carry out drilling, completion and workover engineering studies (design the well architecture, prepare well completion & well intervention program).

Prepared relief well design in conjunction with Boots & Coots company for development wells.

Responsible, in conjunction with contract department, for preparing tenders, analyzing vendor response, awarding contracts, and administering assigned contracts.

Simultaneously, worked on design and construction of a unique Ice-Class and winterized

“Submersible Cantilever Drilling Barge Rig” specially designed for the project. 3

Education

Abadan Institute of Technology (AIT)

B.Sc. in Petroleum Engineering

Languages

English: Fluent

Azeri: Fluent

Qualifications & Skills

Excellent interpersonal, leadership and technical skills

Strong analytical and problem solving capabilities

Excellent time management skills

Contracts and contractor performance management skills

Risk management skills, including Risk Assessment, HAZOP and Management of Change (MOC)

Diligent control of drilling & completion engineering, procurement and operations

Committed to high standard QHSE and professional conduct, proactively promoting accountability

Design and application of innovative process, tools and solutions to drive cost savings and best practice

Meticulous in planning, organizing and managing resources, people, tasks and projects to achieve targets

Builds and leads multicultural engineering and operational teams

Solid understanding of the critical nature and impact of economics, risks, HSE and QC on projects

Key Competencies / Technology

Drilling Project Management skills and procedures (PMP)

Drilling time and cost control management

Drilling projects contract strategies, tenders, bid evaluations and contract awards

Drilling & completion of highly deviated HPHT, ERD wells, offshore and onshore

Sour environment drilling and completion procedures

Cluster drilling on artificial islands in Arctic conditions utilizing RSS drilling system.

Casing and Tubing design for HPHT and ERD wells

Closed Hole Circulating Drilling (CHCD), Mud-cap Drilling systems for highly fractured reservoirs

Drilling directional and horizontal wells.

Material selection for extremely corrosive environment (H2S and CO2) wells

Work over (Heavy and Light WO Operations) and Rigless operations

Well Integrity Management for drilling, well intervention and workover operations

Design and operations of well completions especially large-bore Mono-bore completion systems and installation

DST, production well testing on land rigs and jack ups

SIMOPS operations on land and offshore

Suspension and permanent abandonment of onshore and offshore wells.

Drilling and completion operations QHSE Audit

Key Training Courses

Feb 2018 Material Selection for Corrosion Resistant Alloys, CRA (Sumitomo) Mar 2007 Hole Cleaning & Drilling Practices in drilling extended reach wells (K&M). Held in AGIP KCO office in Atyrau Kazakhstan

Jul 2006 Closed Hole Circulation Drilling System (CHCD), Mud Cap Drilling (Signa Engineering Corp.) held in AGIP KCO office in Atyrau Kazakhstan Nov 2004 Well Contingency Planning (Boots & Coots) held in Kazakhstan Apr 2004 Drilling HSE Audit (Shell Training) in Kazakhstan Aug 2003 Contractor’s Management Course (Shell Training) in Kazakhstan Nov 2002 IWCF for both land and offshore rigs.

Jan 1996 Full Landmark Package application held in Petronas office in Turkmenistan.



Contact this candidate