Curriculum Vitae for Purposed Expert
Purposed Position: Engineer
Name of Expert: Krishna Bahadur Basnet
Date of Birth: 14thMarch 1993 Citizenship: Nepali Gender: Male Address: Siranchok RM-2, Gorkha (Cell: 986*******, email: adzj0e@r.postjobfree.com) Education/Academic qualification:
S.N. Degree Obtained Name of Institutions Date of Obtainment 1 Bachelor in Civil Engineering Acme Engineering College 2015 2 +2 Science Janapriya Multiple Campus 2009
3 SLC Shree Himalayan English
Boarding School
2008
Membership in Professional Association: NA
Other Trainings:
S.N. Training Organizer Duration
Basic Training on Residence Reconstruction Government of Nepal 2 days Technical Inspection Training for Housing
Reconstruction
Gov. of Nepal 2 days
''Training of Trainers (TOT) on Earthquake
Resident Building Construction Technology
for DLPIU Technical Professionals''
CRS (Catholic Relief
Service)
7 days
Supervision and Management of Monastery
Constructions
Government of Nepal 11 days
Years of work Experience:
S.N. Districts Organization Details of Work Experience Number of Years of
Worked
1 Gorkha,
Kathma
ndu,
Kavrepal
anchok
Central Bureau
of Statistics
Kathmandu
Urmila Shahi
Statistics
Officer
014-227720
To assess the level and extent of damage of residential buildings caused by the 25th april 2015 Earth Quake in the affected district.
To collected data using CAPI
6 months
2 Gorkha Paragon
Engineering
Consultancy &
Research
Detail engineering survey of different water supply project.
Preparation of quantity estimate, rate analysis and cost estimate of water supply projects identified and
2 months
Center Pvt. Ltd.
Er. Narayanhari
Rijal
surveyed in the field.
Report preparation and other documentation works.
3 Gorkha District C0-
ordination
Committee
District
Technical
Office
(DTO) Gorkha
For Reference:
Homnath
Paudel
Chief District
Officer
Measurement of Bills (MB)
Feasibility study and detailed survey of project
Preparation of rate analysis, estimate and costing of the project
Carry out the works according to design and drawing for construction.
Prepared a plan for requirement of tools, plant &
materials.
Verify measurement of bills prepared by contractor, community user groups and supplier
Assist to formation of community user group, village worker committee and community based organization
Provide construction material and tools for the priority infrastructure project such as Water Supply, Rural Road and plantation in the rural road corridor
Training and orientation to users group and other field staffs
Attend meeting, workshop and training to represent Water Supply and Sewerage, Water Supply and
Sanitation DTO Office, Gorkha
Data collection, recording and periodic progress
reporting and documentation
Carry out progress monitoring, supervision of works and evaluation
Supervision of contractors and community worker’s
group to ensure planned specification standards are achieved
6 Month
4 Gorkha EHRP-JICA
National
Reconstruction
Authority
For Reference:
Sugandha
Subedi
CMP Technical
Expert-EHRP-
JICA
Mobile:
Prepare drawing of residential Earthquake affected building.
Layout of building at construction site.
Supervision and monitoring during construction of
building.
Provide all the database entry to the Government of Nepal.
Conduct feasibility and detail survey of all vulnerable household due to earthquake.
Facilitate to the community in social mobilization of new and maintenance houses work.
Support community in planning, managing and
implementation of community earthquake response
work.
Joint work together with local government
stakeholders in response issues.
2 year 3
month
Facilitate meeting, workshop, orientation and trainings for user groups.
Keep and maintain the measurement book as per field work.
Prepare and submit monthly and quarterly progress
reports of the projects.
5 Gorkha Government of
Nepal
District Level
Project
Implementation
Unit
(GMaLI)
Reference:
Ram Sharan
Acharya
Project Manager
Engage in fill work to provide technical assistance in the submission of Nepal Government by provisional local government and other necessary visit to determine
capacity development needs of sketcholders on road design Engineering Naya Gaun Bhachek – Sirandanda
road 13.86km premix and Ghyampeshal – Bakot –
Saurpani-Barpark road 9.46km premix.
Super Vision Instruction Measurement and Billing of Road.
Super Vision Instruction Measurement and Billing of Gumba
Prepare bill of quantity and progress report,
Preparation of rate analysis, estimate and cost of Water Supply, Sanitations, Landslide Protection and Bio- Engineering works.
1 year 5
month
6 Kathma
ndu
Zip Consult Pvt.
Ltd.
Er Laxman
Neupane
Managing
Director
Cary the detail survey of residential and
public/commercial buildings.
Supervision of above mentioned buildings site layout and monitoring of all stages of work.
Prepare bill of quantity and progress report.
Facilitate number of mason training at construction site.
Carry the detail survey of rural and gravel road and calculate quantity of excavation/filling work.
Prepare cross section and longitudinal section details of planed road.
2021 July
till date
now
Languages:
S.N. Languages Proficiency
Speaking Reading Writing
1 Nepali Native Fluently Fluently
2 English Good Fluently Good
Area of Expertise:
Conduct Survey, Design, and Estimate for the different construction infrastructure project. Excellent coordination, communication, management, linkage building & facilitation skills with district level technical and non-technical stakeholders.
Excellent skill of coaching and facilitation training, orientation to construction project. Integrity and impartiality, ability to work with external partners e.g. supplier, vendors, service providers; Ability to convey difficult issues and positions to senior officials proactively seek guidance and make clear recommendations to line managers;
Strong verbal and written skills; ability to draft short memos and conduct presentations; Remains calm, in control and good humored even under pressure; Solicits feedback from staff about the impact of his/her own behavior highest standards of integrity, discretion and loyalty.
Employment Records:
From [Year]: 18th Jan 2016 to [Year]: 16th March 2016 18th Jan 2016 16th March 2016
Employer: Central Bureau of Statistics, Kathmandu
Position held: Enineer
From [Year]: 15th June 2015 to [Year]: 10th Jan 2016 Employer: Paragon Engineering Consultancy & Research Center Pvt. Ltd. Position held: Engineer
From [Year]: 15 Jan May 2017 to [Year]: 15th July 2017 Employer: District C0-ordination Committee, District Technical Office, (DTO) Gorkha Position held: Engineer
From [Year]: 14 Nov 2017 to [Year]: 10 Feb 2020
Employer: EHRP-JICA, National Reconstruction Authority Position held: Engineer
From [Year]: 15 Feb 2020 to [Year]: 15 July 2021
Employer: Government of Nepal, District Level Project Implementation Unit, (GMaLI) Position held: Engineer
From [Year]: 20 July 2021 to [Year]: Till date now Employer: Zip Consult Pvt. Ltd. Ranibaan 1, Kathmandu Position held: Engineer
I, the undersigned, certify to the best of my knowledge and belief that This CV correctly describes my qualifications and my experience I am committed to undertake the assignment within the validity of proposal I understand that and willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
Er. Krishna Bahadur Basnet Date: 21 May 2022
NEC No. 13978 Civil A Day/Month/Year
[Signature of expert]