Dedicated hardworking with * years of local companies and 7 years experienced in abroad with
training for safety climbing tower and rescue. Skilled in terms in indoor and outdoor solution for installation. Skilled in power tapping equipment at rectifier from AC to DC. RF cable trouble shooting using site master for DTF and VSWR. Microwave alignment, from near to far end antenna Azimuth and polarization full installation of panel antenna from 2port to 12ports. Radio system installation and combiners, diplexer and triplexer. cpri fiber installation and power topping to rectifier. Employment History
Company: Key Tower
Position: Top Hand / Technician1
Project: DISH
Date: Dec. 4 2022 - Present
Place: Chicago, Illinois
• Dish Installation Project (Fujitsu radio)
Company: Roaming Networks
Position: Top Hand / Technician1
Project: TMobile/AT&T Ericson
Date: April 2022 – Nov. 4, 2022
Place: Miami Florida, Fort Lauderdale
• Ericsson Project
Company: ETSI Technologies Inc.
Position: Rigger/Installer/Technician
Project: Ericsson (TSSR) Phase18 to Phase19 projects. Date: October 2016
Place: North Luzon and South Luzon Philippines
• Solid mensuration of tower height, from buttom to top, antenna pole, microwave pole, and busbar
• Taking photos and parameter for microwave and existing panel antenna in detailed like azimuth, height and their size.
• Panoramic photos with 1/3 skyview and 2/3 coverage view for clear manifestation of subscriber coverage
• Taking mechanical tilt and electrical tilt of panel antenna
• Proposing of new antenna and ERS/RRUS (for Ericsson equipment ) to be installed with height and location in detailed
Marco Bito Abulencia
Cell #: 099********
City Address: Blk2, lot2 Yakal St. Silangan Subd.
Llano Kalookan City
Position Desired: Telecom Tower Technician.
Mobile no.: 092********
Email add : adziu5@r.postjobfree.com
CAREER SUMMARY
• Checking the integrity of the tower for the new proposed equipment if it safe for reused or for retrofit.
• Sketch of existing SLD (Single Line Diagram) for power system for checking the breaker capacity and the cable they used and make recommendation if internal upgrade or not
• Perform site audit with emphasis on the detailed information such as cabinet, space, antenna power and cable layout and requirement.
• Testing of AC and DC voltage and current reading using multitester (clamp meter) from transformer to rectifier
Company: Myanmar Tower Corp.(MTC)
Position: Erector/Rigger
Project: Tower Erection
Date: October.2014 -
Place: Yangon Myanmar
• Tower legs and arm segregation, bolt and nuts s segregation for each legs. Preparation of pulley, sling and gin pole for tightening of bolts and nuts from the top of the tower to bottom per segment. Company: Penta Consulting LTD.
Position: Rigger /Installer
Project: Alcatel Lucent Qatar,ProjectVodapone
Date: Nov.2012 -2014
Place: Doha,Qatar
• Indoor and outdoor of BTS installation which include panel antenna assembly, antenna erection, laying and grounding of 7/8” and 1’5/8 feeder cable
• 7/8 RF Feeder cable installion 1’5/8 RF Feeder cable installion 1/2 RF Feeder cable
• IF Cable for MicroWave Antennas
• BTS cabinet and interface cabling installation
• Electrical and alarm cable wiring
• Battery Bank Installation
• Digital Distribution Frame (DDF) installation
• Trouble shooting of R.F cable using (SITE MASTER)
• Indoor Unit and Outdoor Unit and MICROWAVE installation which include antenna assembly from 2 footer to 16 footer diameter, antenna erection, laying and grounding of elliptical wave guide and coaxial cable.
• Microwave antenna adjustment
• Preparation of connectors and accessories
• Outdoor unit (ODU) installation
• 19” rack installation which include indoor unit (IDU)
• Electrical wirings
• Digital Distribution Frame (DDF) from E1 purpose Company: Penta Consulting LTD.
Position: First Line Maintenance (FLM)
Project: Nokia Siemens Network 2G and 3G swap out Project Date: Nov.2007 - June 2010 Place:
Doha,Qatar
• Installation of Nokia BTS Refarmingfrom Antenna 8port to Rectifier
• Installation of jumpers from Antenna 8port to diplexer lowband and highband
• Installation of RRH radio FRCG-L850-FRGY-L2100-FHDB-U900-FXEA-FXEB-G1800-FRGTU2100
• Installation of Fiber from system module to RRH radio
• Installation of MCMKpower cable and OVP to system module
• Installation of System module FPFD-FTIF-FSMF-FBBA
• Installation of DC Cable from FPFD to Rectifier power toppingInstallation of trisectoral AMB to Antenna
• Installation of Land Cable from E1 to Fabis
• Installation of Filter to lowband L850 and U900Installation of MCRRH(0900)RRH(0800)MCRRH(1800)RRH(2100)
• Installation and Connection AC/DC from BTS,LRO,MCRRH,RRH to rectifier and a fullinstallation and Connection from Main Power torectifierbatteries.conducttesting and checkinDTF,VSWR,return loss and feeder length,rectification of siteclearingpunchlist Dismantling of existing antennas/microwave,radioequipment,and access. Conduct LOS line of site survey of optimization.
• Indoor and outdoor of BTS installation which include panel antenna assembly, antenna erection, laying and grounding of 7/8” and 1’5/8 feeder cable
• 7/8 RF Feeder cable installion 1’5/8 RF Feeder cable installion 1/2 RF Feeder cable
• IF Cable for MicroWave Antennas
• BTS cabinet and interface cabling installation
• Battery Bank Installation
• Electrical and alarm cable wiring
• Digital Distribution Frame (DDF) installationTrouble shooting of R.F cable using (site master) Nokia Equipment Install
Flexi BTS (2G and 3G Equipment)
FSMD/FRGT/FRGY/TMA/RET/
Katrein Triband Antenna(GSM900)(DCS1800)(UMTS2100 and)(U900) Katrein Dual Antenna(GSM900)(DCS1800)
Combiner, Triplexer, MicroWave Antenna, IF Cable (RG8), Grounding Kit Eltek Rectifier, Power DC cable
AC/DC bracket, BTS DE 34 Intratalk
Flexi edge Module
Battery Bank, AC Breake
BTS DE 34 Intratalk
BTS Flexitalk
BTS Citytalk
Ultra Site Edge
Ultra Outdoor
Connect Site
GSM900/DCS1800/UMTS1800/UMTS900/WCDMA
Node B Siemens (3G Equipment) BTS DE 34 Intratalk
Node B Siemens (3G Equipment)
Xinmin (Frequency Shifting Repeater)
Eltek Rectifier
Telecommunication Equipment Installed and Audit
RBS ERICSON EQUIPMENT
• RBS Cabinet Enclosure 6140, RBS 6120, RBS 6100, RBS 6202, RBS 6201, RBS 2216, RBS 2206, RBS 2116, RBS 6301, Delta Cabinet
• Ericsson Radio System (ERS) R2219, R2217, R4415 B0, B1, B3, B5, B8, B28A and RRUS 01/02, 12/13 B0, B1, B3, B5
• Baseband 6630, Baseband 5216, DUW 30 01, DUW 41 01, DUW 31 01
• Air Antenna 6488 (Antenna Included radio) for Ericsson 5G ALCATEL LUCENT
• Alcatel BTS (MB01-MB02)
• RRH900/RRH2100
• MCRRH 210
• Fiber Optic Power Cable
• Rectifier and Batteries
MICROWAVE EQUIPMENT INSTALLED
• MPR
• MPT
• MXC
• Nerra
• Siemens
• Huawei
• Harris Stratex
• Flexi hopper
POWER SUPPLY INSTALLED WITH BACK UP BATTERY
• Eltek Rectifier
• NOKIA PSSS6000
• NOKIA EMPOWER 1100-14
• Power One Rectifier
• Emerson Rectifier
• Benning Rectifier
Training
NWSA – TTTI Examination (Schaumburg – IT Expert System) 17Feb2023 951 N Plum Grove Rd. Suite A, Schaumburg, Illinois, USA OSHA10, Bloodborne Pathogens, Crane Signaling Awareness, Radiofrequency RF (pdhstar) Competent Climber, Rescuer, Rigger, Capstan Hoist Operation (Safety LMS) Adult First AID / CPR / AED r21 (Safety Achievement) Huawei ISDP Training (Institute for Security and Development Policy) Huawei Training Center 8186 Lombos Compound, Dr. A. Santos Ave., San Dionisio, Sucat Road, Parañaque City Huawei Working at Heights
Huawei Training Center 8186 Lombos Compound, Dr. A. Santos Ave., San Dionisio, Sucat Road, Parañaque City Skill
• Testing of VSWR and DTF using site master
• RFI Scanning for 5G in vertical and horizontal
• Microsoft Office
EDUCATION
SECONDARY SCHOOL
• Metro Manila Co
PERSONAL DATA
llege (Novaliches Quezon City) 1985-1989
Date of birth :
Dec.24, 1970
Place of birth : Manila
Age : 51 years old
Citizenship : Filipino
Civil Status : Married
Religion : Catholic
S.S.S. no. : 33-4223478
PAG IBIG No. : 121*-****-****
TIN No. : 285-***-***-***
Passport No. :
REFERENCE
P8093899A
I hereby certify that the above information data is true and correct to the best of my knowledge, ability and belief.
Marco Bito Abulencia