JONATHAN S. TATO
*************@*****.***
LINKEDIN URL
HTTPS://WWW.LINKEDIN.COM
WWW.LINKEDIN.COM/IN/JONATHAN-
TATO-44439242
OBJECTIVE
To pursue the latest knowledge in
various construction updates and
modern methods.
SKILLS
Having the ability to adapt and be
flexible to all sorts of assigned
duties, which requires special
skills, or experience in regards to
the work at hand.
EXPERIENCE
SENIOR TECHNICAL ENGINEER / PROJECT MANAGER
FLOOD CONTROL ASIA, CLARK, PAMPANGA
OCTOBER 20, 2020 TO SEPTEMBER 15, 2022
- Management of the Flood Protection Team Installers for each individual building and perimeter
- Dealing with clients and subcontractors
- OPCOM Meeting
- Conducts Training and on the process of Flood Protection and preparation before and during Flood Season
- During the Pandemic since no Face to Face dealings with client and contractors handled the project via remote video Supervision thru means of any video applications available COMPLETED PROJECTS:
JOSE C. PAYUMO MEMORIAL HOSPITAL @
DINALUPIHAN BATAAN
MASANTOL MEMORIAL REGIONAL HEALTH CLINIC
@ MASANTOL PAMPANGA
HEINEKEN BREWERY – CAMBODIA
SANDVIK PUNE – PUNE INDIA
RESIDENCE OF FILIPINO CELEBRITY MR. ARNEL
IGNACIO
OPERATIONS MANAGER
4B CONST. CORP.APALIT, PAMPANGA
MARCH 16, 2018 TO March 16, 2019
- Over –all management of the operations department mainly Project management team, Asphalt Plant Production, Quality Control, PMT Paving Group, Engineering, Motorpool and Equipment
- Dealing with clients and subcontractors
- OPCOM Meeting
COMPLETED PROJECTS:
- PHILCHEM Project ROMAN Expressway Highway
(Roadworks)
- MDC Alviera Project (Asphalt Laying)
- TALAVERA Nueva Ecija (Asphalt Laying) 29 Barangays
- APALIT MUNICIPALITY (Roadworks/Asphalt Laying)
- Construction of a TWO (2) Storey School at Hagonoy Bulacan
- Asphalt Overlay at North Expressway along Valenzuela to Northbound and Southbound
2
PROJECT TECHNICAL MANAGER
PHILEXCEL BUSINESS PARK CLARK PAMPANGA
December 2017 to September 2018
- Handle the day to day project construction of each client’s building inside the industrial area
- Meeting with clients for the required building documents to be submitted
- Coordination meeting with the LGU for any concerns of the client
- Signing and Approval of permits and other pertinent documents to be provided by clients for construction of their building
COMPLETED PROJECTS:
- Construction of Manufacturing Plant for a Japanese Company located inside the industrial area of PHILEXCEL
- Completion of Interior Finishes for the Apartment Hotel of the Company
- Other related construction and maintenance monitoring
- Responsible for the periodic and regular maintenance of all buildings and company equipment
PROJECT AND ADMINISTRATIVE MANAGER
WIDUS HOTEL AND CASINO CLARK PAMPANGA
September 2016 to August 2017
- Handle the engineering documents related to construction works such as but not limited to survey reports, engineering plans and calculations and installation drawings
- Lead Direct Field Engineers on their specific tasks
- Ensure Safety Policy and Procedures are implemented on site
- Ensuring quality objectives are implemented and submitted properly and management of the accomplished projects and test plans
COMPLETED PROJECTS:
- Construction of BACK of HOUSE for the managers and staff of the Casino Employees
- Coordinating Projects of Marriot Hotel Beside WIDUS HOTEL thru hiring of third party consultancy
- Other related construction and maintenance monitoring 3
CIVIL WORKS MANAGER
NESIC PHILIPPINES / NESIC THAILAND
June 2015 to January 2016
- Handle the day to day project construction of Telecom Towers
- Meeting with clients for the required building documents to be submitted
- Coordination meeting with the LGU for any concerns of the client
- Signing and Approval of permits and other pertinent documents to be provided by clients for construction of their building
COMPLETED PROJECTS:
- 30,60 and 90 meter telecom tower at Myanmar
- Coordination Meeting with consultancy group in Myanmar
- Other related construction and maintenance monitoring
- Responsible for completion of all telecom towers located in various strategic sites in MYANMAR
CONSTRUCTION MANAGER
PROMPT MANAGERS AND CONSTRUCTION
SERVICES MANILA
June 2015 to January 2016
- Responsible for the over-all construction management for the client to ensure completion of project is on time
- Lead and Direct Field Engineers (Gencon and Subcon) in works such as survey, indoor and outdoor installations, testing and commissioning and after sales report.
- Being part of the consultancy group to handle clients project
- Signing and Approval of permits and other pertinent documents to be provided by Gencons and Subcons for construction of their building
PROJECTS COMPLETED:
- Completion of Printing and Manufacturing Company at Laguna Technopark
- Coordination Meeting with clients and execom
- Other related construction and maintenance monitoring
- Assist in the construction of SMDC Condominium
Apartments located in Roxas Boulvevard, Philippines 4
OVER-ALL OPERATIONS MANAGER / NEWCORE
INDUSTRIES INTERNATIONAL INC.,MAKATI PHILS.
November 2012 to November 2013
- Responsible for the completion of finishing works for Civil, mechanical, plumbing and architectural finishes for various clients
- Meeting with building administrators for the required building documents to be submitted
- Coordination meeting with the clients for any concerns of the administrators comments
- Attending the conference call with management and clients
- Signing and Approval of permits and other pertinent documents to be provided by clients for construction of their building
- Review and approval of interior plans for scheduling PROJECTS COMPLETED:
-
- -Interior Finishes for TWOECOM – SAN MIGUEL for two floors
- Other related construction and interior works
SENIOR MATERIALS ENGINEER / PHILIPPINE ARENA,
CIUDAD DE VICTORIA BOCAUE BULACAN
June 2015 to January 2016
- Responsible for all Products and Materials required for quality testing and approved
- Meeting with clients for the required building documents to be submitted
- Ensuring submission of Quality Passed materials are passed and submitted to client
- Signing and Approval of permits and other pertinent documents to be provided by clients for construction of their building
PROJECTS COMPLETED:
- 50,000 Seating Capacity PHILIPPINE ARENA located at Bocaue Bulacan
- Other related Quality Control and testing requirements for the project
5
ARCHITECTURAL ENGINEER / AUTOCAD DESIGNER /
SENIOR DRAFTSMAN / ADWAN CHEMICAL
INDUSTRIES
2005 to 2010
- Responsible for all design drawings to be made in computer specifically in autocad
- Assigned in handling all incoming and outgoing documents or project plans which are approved for implementation
- Preliminary Architectural Designs for plants for the company’s additional chemical plants located in various country such as Algeria, Syria, Yanbu/Jubail in the Kingdom of Saudi Arabia
- Assistant to the project manager which handles all designs and implementation drawings for the company’s expansion project
COMPLETED PROJECTS:
- ADWAN Chemical Plant in Riyadh Saudi Arabia
- Hydrothermal and Chemical Plant in Yanbu
- Silica Plant in SYRIA
- Chemical Complex in ALGERIA
- Silica COMPLEX in YANBU
CADD DRAFTSMAN / DESIGNER / GRENHILLS
AIRCONDITIONING
2004 to 2005
- Responsible for site drawing implementation of Piping works and Air-conditioning Systems layout
COMPLETED PROJECTS:
- Greenhills Shopping Center in San Juan Metro Manila CADD ARHITECT DESIGNER/SIDANI GLASS AND
MIRRORS C/O SAUDI OGER
2005 to 2010
- Detailing and drawing of shop drawings for installation which will be submitted for approval
- Responsible for all site works implementation and installation
- Attending weekly meetings with French Consultants for the projects concerned
- Member of the Design Group to assist in the completion of all site / shop drawings and execution plans
- Submission of design to the Ministry
6
COMPLETED PROJECTS:
- King Fahad Royal Palace in Riyadh
- Prince and Princesses Royal Chalets in Riyadh
SYSTEMS DESIGN OFFICER
HERITAGE MULTI-OFFICE PRODUCTS, PHILIPPINES
1998 to 1999
- In-charge of the space planning designs for the Technical Department
- Approves Quantity take-off for the preliminary quotation for submission to client
- Responsible for all approved and design layouts, Conduct Site Inspections, Supervises Actual Installations
- Attends OPCOM Conferences
PROJECTS COMPLETED:
- Various Private Offices and Individuals
ARCHITECTURAL DESIGN ENGINEER / DRAFTSMAN /
PEAK DEVELOPMENT CORPORATION
1996 to 1998
- Responsible for drafting designs on various projects, which are to be implemented on site prior to approval
- Responsible for the proper arrangement of all the Company’s LOGO’s and Trademarks being utilized by the firm which requires registration and patent
- Responsible for all drafting works and revisions or updates on all building works, during and after construction PROJECTS COMPLETED:
- Heritage Park
- Various Buildings from different clients
TECHNICAL DETAIL DRAFTSMAN / SHAMS TOURISM
ENTERPRISES, DAMMAM KSA
1994 to 1996
- Handles all technical drafting works for HVAC layouts and details
- Part of the Project Management Group under the client
- Responsible for all drafting revisions and updates on all building works, before during and after construction both for conventional and precast structures
7
PROJECTS COMPLETED:
- Half Moon Bay Beach in Dammam Saudi Arabia
MECHANICAL DRAFTSMAN / ARABIAN CONSULTING
AND ENG’G. SERVICES KSA
1992 to 1994
- Assigned for technical drafting works for HVAC and Plumbing layouts and details
- Responsible for the completion of detailed drawings such as mechanical, architectural, structural and plumbing plans
- Assigned to all technical drafting detail works
COMPLETED PROJECTS:
- Ministry Of Defense and Aviation in Riyadh KSA
- Road Improvement projects in NAJRAN
- Other Projects
DESIGN ARTIST, ASSISTANT PRODUCTION
SUPERVISOR / THE MATTRESS CITY PHILS.
1989 to 1991
- Handles all visual artworks for sales and information
- Responsible for the design of Orthopedic Beds and Mattresses
- Handles all innovative designs for the company
- Assigned to assist the Production Manager in handling all quality and production control
COMPLETED PROJECTS:
- Various clients
ELECTRO-MECHANICAL DRFTSMAN / UNION –
HITACHI INDUSTRIES, QUEZON CITY
1987 to 1988
- Responsible for the design and drafting of mechanical parts for the Design and Research Department
- Making shop drawings for the final product to be manufactured and assembled
- Handles all drafting details for certain products or parts 8
COMPLETED PROJECTS:
- Various clients
APPRENTICE DRAFTSMAN AND FULLSIZER / CANCIO
AND ASSOCIATES
1983 to 1986
- Assigned in drawing and drafting visual aids for plant safety
- Trained for Furniture designs and full – sizing drawings
- Handles all stocks and materials for quality control inspection
PROJECTS COMPLETED:
- Various clients in Makati City
EDUCATION
BS CIVIL ENGINEER
EARIST
Half Scholarship / Working Student
SECONDARY
San Sebastian College
Full Scholarship
SEMINARS AND WORKSHOP ATTENDED
CIVIL SERVICE EXAMINATION
1996 – PASSED 86%
ISO AUDIT 2009 – 2018 Seminar
Strategic Planning November 2018
Prepared By:
Jonathan S. Tato