Technical Skills
Pipefitting
Plumbing
Welding
Painting
************@*****.***
San Fernando, La Union
Ramon Gaa
Contact Me
Work Experience
Skills
** ***** ** ********** ** Pipefitter/fabricator/plumbing/hydrotesting in Gas and oil project, Petrochemical plant
Builds platforms for offshore installation
Well-acquainted in power-piping, shop fabrication, yard erection & welding
Interpret ISO drawing, Blue-print and P & ID and operates warehouse equipment
Operate 7 stages of Waste Water Treatment and
maintaining in good condition of Fire and Jockey Pump and Gas farm equipment for the tenants consumption for everyday use of gas and water system.
PIPEFITTER /PLUMBER /S. T. P. OPERATOR
Robinson Place La Union - San Fernando I 2023
Carpentry
Plant growing Profesionnal Experience
Boiler
Construction
Stick welding
Schematics
Forklift
Warehouse Experience
Education
SECONDARY
La Union National High School - La union
SY 1988
PRIMARY
Catbangen Elementary School
SY 1980 - 1981
Perform multi-tasking such as Pipefitting/Plumbing, carpentry, Iron works, Electrical, Welding and painting PIPEFITTER/WELDER
Metaline Enterprises Inc I San Fernando City, La Union Philippines I October 2020 to July 2021
Perform multi-tasking such as Pipefitting/Plumbing, carpentry, Iron works, Electrical, Welding and painting MAINTENANCE PERSONNEL
Manila Philippines I September 2019 to February 2020 Installation/riggin up HDPE/SS pipe.
Installation of support on both classification of pipe. Lay out, cutting, fabricate, rigging, grinding and installation of pipes, gaskets, etc. as per drawing Hydro test all pipes at area 70
PIPEFITTER/STEAMFITTER (LEADHAND)
PCL Energy Inc - Saskatoon, SK I Canada
September 2013 to December 2014
Punch list/Deficiencies on 3 separator tank on area 300. Lay out & compute pipe installation for air line on area 200- 300 Bolt up and final torque as per job sheet.
PIPEFITTER/LEADHAND
URS Flint Energy - Fort McMurray, AB I Canada
May 2013 to August 2013
Installation / Rigging / Fabrication in MEG Modularization Division in the pipefitting trade.
Lay out and install spool 3" - 6" dia on Mod
Fabrication of spool as per drawing and cutting beveling using machine as per cut list.
Fabricate, tack and full weld pipe shoe, guide and anchored on mod.
Punch list, hydro test and re-instate as per mod required Fabricate shipping steel and scaffold platform for the mod. PIPEFITTER/LEADHAND
Worley Parson Cord - Red Deer, AB I Canada
June 2012 to March 2013
Lay out & install pipes as per drawing
Installation of shipping steel to hold the pipe in the module to secure cargo safety
Assigned at Hydro division to test the line.
PIPEFITTER/LEADHAND
Roevin Technical - Edmonton, AB I Canada
September 2009 to December 2009
Lay out & iinstallation of branch insulation of pipe 50"dia in skid row/ leg platform.
Installation of cone pipe in P-7,80"dia pipe sizes. Installation of external & internal ring of pipe.
Installation of cup 80"dia in leg platform.
PIPEFITTER
Vpeople Energy Services I Ga llano, Louisiana, U. S. A. December 2006 to December 2007
Lay Outing & Installation of insulation pipe (threaded & welding connection) in Furnace Utility cooling water.
Erection of Structural building where the plastic pipe laying & train tower conveyor building. Installation of pipe support as per drawing;alligning of pipe in acid pipe rack. Punch list as per Client approval.
Hydro test as per drawing (test package) also dismantling & installation of new cooling water line
(supply & return) threaded & welding connection.
PIPING/PLUMBING FOREMAN
Murray & Roberts MEI PTY LTD I Mopani Mufulira, Zambia West Aftica October 2006 to October 2006 Demolish of old fire water line and install a new fire water line both above / underground line. Segregation of latest ISO. DWG. For fire-water line with cement lining. Materials take-off / fabricated spools (piping) for fire water lines for scheduling. Schedule (plan) of the said target area and prepare the necessary safety precaution. Prepare fire Monitor hoses to the target area.
Demolish of old water lines around the 4 mother tank in the target area. Hydro test as per drawing (test pack) also dismantling & install of new sewer lines with the same procedure. PIPING/PLUMBING FOREMAN
TCHAD CAMEROUN CONSTRUCTORS I SSI/ AOS / COMELEX Chad, Africa I October 2002 to November 2003
" I hereby certify that the above mentioned information is true and correct to the best of my knowledge and belief " RAMON GAA
Applicant