Key Skills Profile Summary
A competent professional with over 20 years of experience in Project
Management, Liaison & Coordination and Team Management Rich experience in working on Substation Bldgs., Palace Projects, Metro Projects, Stadium Projects, Airport Projects, Underpass Highway Road Project, Oil & Gas, Utility works, Industrial projects (Desalination of Water Treatment Plant works), Residential and Commercial Buildings Projects A strategic planner with a flair for adopting modern project execution methodologies, systems & procedures in compliance with quality standards Proven excellence in developing and streamlining systems with proven capability to enhance operational & administrative effectiveness and meet operational goals within cost, time, and quality parameters Proficient in swiftly ramping up projects with competent cross-functional skills and ensuring on time deliverables within pre-set cost parameters IRW and MDR Inspection raising with BIM 360 Field Autodesk Successfully managed the multiple projects and milestones while ensuring that the projects are complied with all cost and scope specifications In-depth knowledge of Civil, Architectural, ID & MEP Material Submittal Preparation & Inspection work as per QCS, BS EN, ACI & ASTM standard Career Timeline
Soft Skills
MS-Office Applications, MS-Project and Auto CAD
Project Management
Material Management
BIM 360 Field Autodesk
Quality Management
HSE Management
Site Administration
Liaison & Coordination
Reporting & Documentation
Team Building & leadership
Manpower Management
Apr’10- May’12 &
Mar’13 - Apr’14
Larsen & Toubro Ltd.,
India as Asst.
Construction Manager
JEYARAJ KUMAR. S
Material Engineer
“Targeting Construction Management / Quality Management / Material Management / BIM 360 Field Autodesk and Site Execution with a growth- oriented organization.”
009**-******** / 0091 805-***-**** ***************@*****.**.** May’14 - Feb’15
NCC Emirates LLC- Dubai as
Project Engineer
May’12 – Feb’13
PAT Engg, Qatar as
Project Engineer
May’17-May’19 PORR
QATAR Construction WLL
as Material Engineer
Apr’15-Apr’17 FCC
Construction, S.A. Qatar
as Material Engineer
Sep’19 to Aug’22 Urbacon
Contracting Co. WLL as
Material Engineer
Work Experience
Sep’19 – Aug’22 with Urbacon Contracting Co. WLL as Material Engineer May’17 – May’19 with PORR Qatar Construction WLL as Material Engineer Apr’15 – Apr’17 with FCC Construction, S.A. Qatar as Material Engineer May’14 - Feb’15 with NCC Emirates LLC- Dubai as Project Engineer Mar’13 - Apr’14 with Larsen & Toubro Ltd., India as Asst. Construction Manager Key Result Areas:
To Study the project contract documents (time schedule, project design drawings, BOQ, etc.) Ensures all shop drawings are prepared accurately followed by all as-built drawings Administered functions including Prequalification & Material Submittals Evaluation, Material Submission Documents Checking, Test Reports Checking for material as per project specification, Material Sustainability, Schedule Preparation of Procurement List, Consultant / Client Liaising for Material Approvals and Manufacturer / Supplier Coordination for material delivery
Coordinated with Site Team for necessary arrangements regarding delivery/storage of materials according to manufacturer recommendation
Analyze the test results in a timely manner and recommend action to the Senior Technical Manager and Maintain records of test results and all taken corrective actions Analyzed project contract documents (time schedule, project design drawings, BOQ), reviewed Design Drawings, Shop Drawings, Architectural & Structural Drawings and steered IRW & MDR Inspection raising through BIM 360 Field Autodesk
Conducted project feasibility studies & review meetings for evaluating project progress & de-bottlenecking and developed, reviewed the business case and the definition of requirements while clarifying the quality of the project Coordinated complete functions of end-to-end project management including project team resource identification, stakeholder interface, project planning, requirements gathering, technical & functional documentation and issue tracking & resolution
Prepared & implemented Project Execution and QHSE Plans for all assigned projects Identified & evaluated the project risks / lesson learnt registers, preparing mitigation plans and ensuring their successful implementation
Developed & maintained detailed project schedules and monitoring costs to ensure project schedules are on track and meet all deadlines
Translated requirement in constructability review, project meetings with clients, contractors & vendors into workable project schedule
Assessed the generated project plans, schedule of activities, budget & cost estimates and procuring, mobilizing & deploying resources to deliver the project within the defined time Performed material reconciliation of project materials by anchoring on-site construction activities to ensure completion of the project
Imparted trainings to the resources during preparation of technical and cost estimates for the project, work breakdown structure, project plan, contingency plan & schedules Prepared cost estimates, Bill of Quantity /Material take offs from drawings & site investigations. Ensured that all Procurement & Materials requirements for the Project and ensured that EPC Contract requirements are met; developed Closeout & Materials Reconciliation plan Conducted Materials Test, Civil, Structural, Architectural & MEP Inspection, Submittal, Coordination with Consultant for site and offsite Inspection and test Notified non-conformances identified during site inspection and recommending corrective measures through QA/QC, implementing QC Plan /ITP / QA/QC documentation Studied & prepared requests for information (RFIs) for all missing, unclear, conflicting, or other technical matters that may arise during construction
Updated Drawing Register Controls on a daily basis for the project and implementing & communicating risk controls and actions involved in delivery and implementation of projects Ensured weekly report detailing exact progress of all material requirements & areas of concern/delay Managed steel structure work from material inspection, assembling & erection in the stadium including catwalk & Garage
Administered functions including Site Auditing, Material Testing Tracker Reviews, Weekly Reporting, Site Administration, Value Engineering, Cost Savings, Material Testing, Material Inspection, Assembling & Erection, Project Quality Management, BOQ & Technical Standardization, MIS Reporting Quality Assurance Documents Preparation like DQR, Quality Ratings, Material Testing Reports & Drawing Review Performed Qatar Civil Defense approval for Stations, by ensuring Fire-rated materials, Fire-rated walls, Partition walls, Silicon, Ceilings, Structural steel, Emergency Exits, Doors Studied the Superstructure drawings for cast in-situ segment, PT strands profile drawing, Pre-stressing drawings, and implementation at site through workforce
Coordinated & organized meetings with sub-contractor regarding Close-out Document Tracker lists of OMM, Training Manuals, Warranties, Redline Submittals, As-built submittals Education
Diploma in Civil Engineering from (1992) Board of Technical Education Chennai, Tamil Nadu BE Civil Engineering (2005) Chennai, Tamil Nadu
Trainings
Training Program for OHSAS Internal Auditing and ISO Internal Audit (Dubai Institute of Business Management) Managing Safety in the workplace ((Dubai Institute of Business Management) BIM 360 Field Autodesk Advance
Certifications
Project Management Professional (PMP)
IRCA Certified QMS LEAD AUDITOR ISO 9001-2008/ISO 9001-2015 (QMS) For project details, please refer to the annexure: Annexure
COMMERCIAL AND HIGH-RISE BUILDINGS AND INFRA PROJECTS Palace, Real Estate & Amenities Buildings Projects At Urbacon Contracting Company
Title: Design & Build Lusail Palace Project
Design & Build Integrated Family Housing Project and Labor Accommodation Project in Al Wakra Period: Sep’19 – Aug’23
Client PEO (Private Engineering Office) & Rawasi Real Estate Consultant: Arab Architects, AECOM & GHD and TIME QATAR, CEG, DARA Designation: Material Engineer
METRO AND STADIUM AND INFRA PROJECTS
Infra Projects (Stadium & Metro Projects)
At PORR QATAR Construction WLL.
Title: Al Wakrah Stadium Projects and Precinct works & Metro Green Line South Elevated project works Period: May’17 - Mar’2019
Client Supreme Committee and Legacy & Qatar Rail
Consultant: KEO & AECOM & AKTOR
Designation: Material Engineer
At FCC construction S.A. Qatar (Metro Projects)
Title: Metro Red Line South Elevated & AT Grade & Al Wakra Underpass Road Highway Project Period: Apr’15 – May’17
Client Qatar Rail & Ashghal
Consultant: Louis Berger & Egis Rail
Designation: Material Engineer
Date of Birth: 18th January 1978
Passport Number W1428564 valid up to 01-08-2032
Languages Known: Tamil, English, Hindi, and Telugu Driving License Expy. 09th March 2027 (State of Qatar) GIS SUBSTATION BUILDING AND TRANSMISSION LINE PROJECTS Power Projects (Substations)
At NCC Emirates Dubai
Title: E18 & E19 Substation Projects in Northern Emirates. (UAE) Period: May’14 – Feb’15
Client: Federal Electricity & Water Authority (FEWA) Consultant: Energy projekt Entel Co. Ltd., Dubai
Designation: Project Engineer
At PAT Engineering WLL, Qatar
Title: Qatar Power Transmission System Expansion Phase VIII Substations Period: May’12 – Feb’13
Client: Kahramaa (Qatar General Electricity & Water Corporation) Consultant: Lahmeyer International
Designation: Project Engineer
Power & Infrastructure Projects
At Larsen & Toubro Ltd. Chennai
Title: Construction of 132Kv GIS Substation Building & Transmission Line Projects in 132Kv, 220Kv & 400Kv at MC/DC
Period: Apr’10 – May’12 & Jun’13 – Mar’14
Client: Power Grid Corporation India Ltd. (PGCIL), TANGEDCO & Tata Steel Ltd Designation: Asst. Construction Manager
OIL & GAS ONSHORE INDUSTRIES PROJECTS AND INFRA AND ADMIN BUILDING PROJECTS Oil & Gas and Infra Projects
At East Coast Construction Industries Ltd. (ECCI Ltd.), Chennai Title: Infrastructure works for Indian Oil Corporation Limited – Marketing Terminal Period: Nov’08- Mar’10
Client: INDIAN OIL CORPORATION LTD
Designation: Sr. Civil Engineer
Oil & Gas - Onshore Infra & Admin Buildings Projects At ETA Ascon Group EMCO Abu Dhabi, UAE
Title: Construction of Bund wall construction in UMM AL NAR power & Desalinated Water Treatment Plant Works & Enabling works SHAH Gas Development Program, (Storage Tanks, Vessels & Process Piping, Petrochemicals, Fertilizer, Boiler and Refinery Shutdown works) in Abu Dhabi, UAE & UG Pipeline using DI Pipeline works
Period: Oct’05 – Oct’08
Clients: ADNOC, ADWEC, TAKREER Refinery, Ruwais Refinery, ADDC UAE Designation: Site Engineer
Oil & Gas – Onshore Industries Projects & Admin Building Projects and Infra works. At K. Chinnu & Co. (P) Ltd., Chennai
Title: Construction of Cooling Tower Project, Desalinated Water Treatment Plant Works & Oil Storage Tank Facilities & Construction of Software Development Buildings, Industries buildings, University & Commissioner Office Buildings
Period: Aug’98 - Jan’02
Client: M/s Chennai Petroleum Corporation Ltd. (CPCL) & MRL & Futura Polymer Ltd. Manali, & PWD Chennai
Designation: Site Engineer