Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
San Jose, Carabobo, Venezuela
Posted:
September 04, 2023

Contact this candidate

Resume:

Calle *** with Av.Arturo Michelena, Res El Gran Pama, La

Trigaleña, Valencia. Telephone: 58-426-*******.

E-mail:adzgbs@r.postjobfree.com, adzgbs@r.postjobfree.com

LinkedIn: www.linkedin.com/in/henryrcp/

Henry Rafael Castañeda Perez

Identity Card: 11.919.682 College of Engineers No.: 118.571. APPLIED STUDIES

Electrical engineer,Simón Bolívar University, November 18, 1999. Bachelor of Science,Esteban Gil Borges High School, July 1991, Caracas. - WORK EXPERIENCE

Promoter Ttontalo, (Engineering)(May 06, 2019 - June 2023) Electrical Project Engineer, for installations in shopping centers, hotels or department stores, design of lighting systems, photovoltaic installations, electrical power installations, backup, among others. PDVSA, (August 15, 2005 – May 5, 2019))

Electrical Engineer, Operations Engineering Technical Management National Market, Storage Plants and Polyducts. Electrical Engineer, Engineering and Maintenance, Services Management Technicians and Mtto. Deltaven, development of Detailed Engineering Service Stations and Fuel Outlets. SAP PM Reimplantation Project.

Servipet (oil services).(December 20, 2004 – August 15, 2005) Hired as Integral Inspector for the Gcia of Technical Services and Maintenance. from Deltaven. AB Projects and inspections.(June 1, 2004 – December 17, 2004) Contract for the provision of professional and technical services for the execution of projects of Bariven Technical Management of Marketing and DistributionVenezuela.

MARN.(May 26, 2003 to September 2, 2003)

Participation together with Eng. Juan Calcaño in theTechnical and Administrative Inspection of:Completion of the Simón Rodríguez Wastewater Pumping Station:to. Installation and Commissioning of Electromechanical Equipment and Completion of Civil Works and Finishing, Building and Interconnection Pipe 1000.b. Construction and Installation of the Motor Control Center for E/BSimón Rodríguez, Puerto La Cruz, Anzoátegui State. Gerasin Consortium - CIDESA - SMX.(April 16, 2001 to May 31, 2002) Electrical Area Consultant: Develop Electrical Sector Model, perform specific tasks of definition of entities, relationships, quality indices, data warehouse (DW), operational (ODS) models and design OLAP cubes. Participation in the elaboration of forms of information capture to feed the models developed within the Information System of the Electricity Sector (ProyectoSISE).

Santa Maria College.(October 2000 – February 2001) Professor of Mathematics I and III courses at the Faculty of Engineering.

Constructions Leonel Pérez Salazar. (April 2000 to August 2000) Supervisor in the adaptation of the new children's intensive care room at the Pérez de León Hospital in Petare (electrical installation, etc.). Supervisor of various works. LTI (Lopez Trading International). Training Instructor in the use of VIP Scanner equipment Monitor in Electricity of Caracas. At the Santa Rosa and Los Teques offices. PRACTICE,AC lightning rods and grounding. (October 99- January 2001) Technical advice for the installation of ground systems. Electrical installations for atmospheric protections. CHOOSE,(May-September 99).

Internship:Energy Audit to an Industrial Plant: Measure the level of harmonic pollution in the Primavera Publishing Company and monitor the different electrical parameters that can affect the quality of energy. Objective: to determine the effect of non-linear charges associated with the Electrical System and the problem of harmonic pollution. Preparation of the user manual for the VIP Scanner Monitor equipment. Management of IEEE, CEN (National Electrical Code) standards.

Simón Bolív University.arCourse Preparer: Electrical Systems I (Sep - Dec 97), Electrical Systems II

(Jan 98 - Apr 99)

TRAININGS, COURSES, WORKSHOPS.

1.

2.

Design of Photovoltaic Installations, CITECI Training, 07/2022-08/2022, 40 Hrs Revit 2020 Basic Module, CEIDEC, 30 Hrs, 12/2021, 30 Hrs 3. Autodesk Autocad Plant3d 2018, Grupo Distmah Training Center, 2018-05-11, 30 Hrs. 4. Autodesk Revit Architecture 2017, Abstract Training Center CA, May 2017, 40 Hrs 5. Autodesk Autocad Mep 2017 Sanitary Systems and Pipes, Abstract Training Center CA, May 2017, 40 Hrs 6. Visualization, Conceptualization and Definition of Major Projects, Advanced Level, Eng. A. Mayol, May 2017, 24 hours

7. PUMPING SYSTEMS: Principles of Design, Operation and Maintenance, MOLIROCA, sep 2015, 32Hs 8. Basic Cathodic Protection, Asvencor Venezuela, July 2015, 40 Hs 9. Hazard Analysis, Use of What If Techniques, Hazop, Integra, September 2014, 16 HRs 10. Advanced Technical Report Writing Workshop, Integra, August 2014, 4:00 p.m. 11. "Total Quality Tools for Problem Solving".09-10/09/2013 12. Induction to Fiscal Measurement Systems, and Transfer of Custody, Ferrum, January 2013, 4 Hrs. 13. Preventive Behavior, Asha Asesores Humanos, 06/11-12/2012, 4:00 p.m. 14. Etap Pow er systems Basic-Intermediate, Etap Venezuela, 05/22-25/2012 15. Basic Operation and Maintenance of Baldor Generators, Dist. Baldor Oriente CA, May 2011, 4:00 p.m. 16. Basic First Aid, Valencia Fire Department, 10/25/2011, 8 hrs 17. Investigation of Accidents and Incidents, Root Cause Determination, Silog, November 2010, 32 Hrs 18. Trading Strategies, 12/17-18/08

19. Teamwork, 01-02/09/08

20. Analysis And Application Of The Iso 9001:2000 Standard" 08/29/2008 21. Local Administrator of Master Data Sap Pm, 26 to 30/05/2008 22. Drafting of Documents and Reports, 05/19-20/08 23. NUPI PIPING INSTALLATION CERTIFICATION 8th April, 2008 24. Pcp - Report of Irregular Situations in PDVSA, 08/24/07 25. Pcp - The Culture of Quality, 08/24/07

26. Pcp - Security in PDVSA Parking Lots, 08/20/07 27. Pcp – Identification And Identification, 08/20/07 28. Pcp - Access In PDVSA, 08/20/07

29. Training of Facilitators, 06/20/07

30. Maintenance Plans, 12/22/06

31. Ad Maker Sap 12/18/06

32. Installation, Inspection, and Management of Fiberglass Tanks, 10/06/2006. 33. Sap, Plm316 Maintenance Processing, 08/23/2006 to 08/25/2006. 34. Sap, Ac415 Internal Orders, From 08/21/2006 To 08/22/2006. 35. Consultation of the Master Record of Materials, August 14 and 15, 2006. 36. Sap, Plm300 Plant Maintenance, 06/19-23/06

37. Procedures for Inspection of Smartflex Piping Installations (Nupi). 04/20/2006. 38. Installation of fiberglass tanks, Fibratank, 04/20/2006. 39. Autocad 2006 Three-dimensional, 03/06

40. Safety, Hygiene And The Environment In The Industry. 'Module "C": Supervisory 41. I Conference on Internal Fuel Trade, February 20 and 21, 2006 42. International Corrosion Congress, Puerto La Cruz, 2005, 11/22-26/05 43. Microsoft t Project Introductory", 11/11/05

44. Pep's- Project Execution Plan 09/23/05

45. Module Bml Taller Fel Minor Projects", September 15 and 16, 2005 46. Introduction To Programming From:Plc's, 19-20/08/05 47. Vehicle Driving Safety (Light Fleet)" 08/16/05 48. Upp System Inspector 08/11/05

49. II Informative Conference on Technologies Applied to Service Stations, 07/28-29/05 50. Effective Work Teams"06/07/05

51. I Informative Conference on Technologies Applied to Service Stations, 06/02/05 52. The Noble And Difficult Art Of Trusting" 07/12/05 53. Inspection Certificate, Durapipe Pipes, 05/11/05 54. The Architect, From Communication, 05/04/2005

55. Autocad 2005 Bidimensional, 05/05

56. Basic Metrology, 10/21-22/04

57. University Facing the 21st Century, 10/14/98



Contact this candidate