Post Job Free

Resume

Sign in

Pipe Fitter High School

Location:
Malabon, Philippines
Posted:
August 30, 2023

Contact this candidate

Resume:

ELDEBRANDO M. LABAO

Industrial St. ** Al Mana Camp Building – 49 Zone – 57

Doha, Qatar

Email Address: adzcxe@r.postjobfree.com

Contact No. +639*********

WORK EXPERIENCES:

• LEIGHTON CONTRACTING (Qatar) W. LL

Mega Pipe Line Water District

Senior Supervisor

January 04, 2016 – December 12, 2021 (Resigned)

Umm Salal Mohamad to Umm Al Aphay Package A & Package B State of Qatar

Installation Drainage System Project of Concrete pipe or R.C pipe, GRP pipe and Clay pipe in concrete pipe project in P.R.P.S 3 Mega Reservoir Communicating D.N 2000mm. Experienced and knowledgeable worker on Earthworks (engineering), such as handling the breaking of trenches. Moreover, arranging the formation level and backfilling based on blueprint. I have skills and a long term experience on Potable Water Sterilization especially on the safety of the pump and installation of discharge and suction pipe.

Duties and Responsibilities:

o Communicating with various employees within the same company and providing them the task for a certain project.

o Proceeded the arranging of materials in the stuck and pipe yard from Japan. o Finished the package A from P.R.P.S I to P.R.P.S II prior to the deadline under my supervision. o Manage the final hydro testing in the whole mega pipeline from package A, B, C, D, E after the hydro testing and continued overseeing the P.R.P.S III Mega Reservoir. o Supervise the trench for the installation of pipe in preparation of attaching the joint in the proper location to avoid leakage during Hydro testing. o Supervise the installation, repair, and maintenance of water, pipe fitting and heating systems; maintain records and files; prepare reports. o Determine sequence of installations by reading plans and working drawings. o Regulate the installation and repair of hot and cold water, oil, steam or gas pipes and necessary connections.

• LEIGHTON CONTRACTING (Qatar) W. LL

Water Line District Project

Foreman

June 25, 2011 – January 05, 2016

Al Shahamya, Umm Garn, Duhail and Al Khaban Pumping Station State of Qatar

Duties and Responsibilities:

o Headed the fixing of optional pipeline of 1400mm, 1200mm, 900mm and 600mm diameters including the fixing of butterfly valve, dismantling joint inside the chamber and optional pipeline from Duhail to Lusail City.

o Proceeded the installation of pumping station from suction pipe to motor pump, discharge pipe to motor pump and alignment from suction line to motor pump. o Determine sequence of installations by reading plans and working drawings. o Supervise pipefitting crew in safe installation and assembly of all aspects of piping systems and fixing the instrumental pipe tubing.

o Inspect work in progress and completed work to insure conformance to specifications and local codes.

• LEIGHTON CONTRACTING (Qatar) W. LL

Water Line District Project

Pipe Fitter Chargehand 2

June 25, 2010 – June 24, 2011

Duhail

State of Qatar

Duties and Responsibilities:

o Assembled and installed a variety of valves and fittings. o Managed job site hazards by accurately locating biohazards, low-grade radiation, and chemicals.

o Process maintenance and construction piping project. o Attended seminars and trainings for career development.

• LEIGHTON CONTRACTING (Qatar) W. LL

Water Line District Project

Pipe Fitter Chargehand

March 25, 2009 – June 24, 2010

Al Saquab

State of Qatar

Duties and Responsibilities:

o Assembled and installed a variety of valves and fittings. o Managed job site hazards by accurately locating biohazards, low-grade radiation, and chemicals.

o Process maintenance and construction piping project. o Attended seminars and trainings for career development.

• LEIGHTON CONTRACTING (Qatar) W. LL

Water Line District Project

Mechanical Pipe Fitter

2007 – March 24, 2009

Al Saquab

State of Qatar

Duties and Responsibilities:

o Preparing all tools and materials for pipe alignment. o Fixing pipe 250 O, 150 O and 100 O.

o Fixing of joints and fitting like Glob, Motorized, Solenoid and Butterfly Valve. o Perform duties and responsibilities assigned by the supervisor.

• AL-JABER ENGINEERING COMPANY LLC

Water Line District Project

Pipe Fitter

June 2006 – July 2007

Doha, Qatar

Duties and Responsibilities:

o Preparing all tools and materials for pipe alignment. o Fixing pipe 250 O, 150 O and 100 O.

o Getting accurate measurements and cut the pipe for fixing of joints and fitting like elbow, tee, coupling, reducer, and any kind of valve.

o Perform duties and responsibilities assigned by the supervisor.

• MOD-AIR MANILA CO, Ltd.

Chilled Water Project

Pipe Fitter

December 2005 – February 2006

Makati City, Philippines

Duties and Responsibilities:

o Pipe erection from F.U and H.U.

o Fixing and centralizing of pipes.

o Getting accurate measurements for the take off and offset line. o Fixing motorize and butterfly valve.

o Perform duties and responsibilities assigned by the supervisor. SKILLS AND ABILITIES:

• Knowledgeable in installation of concrete, GRP and clay pipe.

• Use testing equipment to check systems for leaks.

• Join pipe sections, related equipment and secure in position.

• Measure, cut, thread, groove, bend and assemble and install metal, plastic and fiberglass pipes, valves, and fittings.

• Team-oriented with the ability to work well and communicate with others. • Demonstrate willingness to accept responsibility and leadership role.

• Ability to read and understand blueprints.

EDUCATIONAL ATTAINMENT:

Vocational Course : Power Plant Mechanic

Cebu State College of Science and Technology

Cebu City, Philippines

Secondary : Kasapa Barangay High School - Completed Primary : Kasapa Elementary School - Completed

PERSONAL INFORMATION:

Age : 57 years old Height : 5’7’’ ft.

Birthday: August 21, 1964 Weight : 89 Kg Religion: Roman Catholic Civil Status : Married Nationality: Filipino

I hereby certify that the above statements are true. ELDEBRANDO M. LABAO

Applicant



Contact this candidate