Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Bajpe, Karnataka, 574142, India
Salary:
1200kwd
Posted:
August 29, 2023

Contact this candidate

Resume:

PREM ARTHUR CUTINHA

Email: adzbba@r.postjobfree.com

Contact nos.: Mob. +91-974*******/781-***-****

Date of Birth

:

20May 1972

Nationality

:

India

Marital Status

:

Married

Qualification

:

Bachelor of Engineering (Electrical )

Additional Skills

:

Proficiency in Microsoft Office

CAREER SUMMARY

21years experience in Estimation, Design, Construction, testing and commissioning in the field of Electrical Engineering.

9years of Experience in Kuwait and has worked in projects of Kuwait National Petroleum Company (KNPC), Kuwait Oil Company (KOC) and Public Authority forIndustries (PAI).

5 years of Experience in Saudi Arabia mainly in projects of Arabian Oil Company,Al- Khafji Joint Operations etc.

7 year of Experience in India mainly in Electrical consulting.

Proficiency in Design, Construction, testing and commissioning in Electrical system.

Conversant with IEC, SHELL DEP, NEC codes and standards.

Familiar with Hazardous area classification.

Proven ability to swiftly ramp up projects with competent cross-functional skills & special delivery mechanism.

Experienced in Cost Estimation of Electrical works and Bid Evaluation.

Familiar with Motor selection, Cable selection etc

PROFESSIONAL EXPERIENCE:

May 2013 till date

Working in Trinity Enterprises as Senior Electrical Engineer

Liasing with clients on technical matters

Ability to build and maintain client interactions and contractor's staff to determine and verify project requirements.

Preparing reports and site records, performing electrical tests.

Providing general inspection on all construction labour and subcontracted tasks to ensure professional workmanship.

Identifying non-conforming works, generating reports and corrective actions and coordinating responses.

Progress Review meetings with the Client/Management.

Coordination with the Material suppliers.

Preparation of Data Sheets for Electrical Equipments and accessories.

Monitoring Safety Precautions and adhering to Safety rules and regulations.

Reviewing and checking of these electrical deliverables to ensure accuracy and alignment with the scope of work prior to issue

Hold co-ordination meetings and engineering review meetings with Vendors of major equipment as required

Participates in project reviews, design reviews, audits and other workshops as required

Completion of site surveys and data gathering for the scope of work, taking responsibility for development of the site survey report

Provide relevant knowledgeable practical skills for Site visits and site surveys, Site queries and discussions, Supplier, vendor, contractor, client and site related discussions and Site based activities

Managing the tasks and ensure it is within the scope of work and highlighting any significant issues

April 2005 to April 2013

Worked in Mushrif Trading & Contracting Company Kuwait from April 2005 to April 2012 as SeniorElectrical Engineer.

A Reputed Contracting & Trading company with significant presence in oil, Petrochemical and General Sectors.

Job Profile:

Design, Construction, Testing and Commissioning of Electrical works of Projects assigned.

Estimation of oil and gas tenders for MPW, MEW and MOH Projects.

Coordination with other departments for Multi-disciplinary Projects.

Organises and Allocates Manpower, Equipment, Tools and Tackles for the electrical works of the projects assigned.

Attend Progress review meetings with Clients.

Preparation of Progress reports, Concerns and Corrective actions for the Management.

Technical and Commercial Evaluation of Equipment and material offers from vendors.

Coordination with the Procurement, Expediting Departments for the projects assigned.

Preparation of bid proposals, sub contract documents

Attending Pre-Tender Meetings

Asa Senior Electrical Engineer handled the following projects:

Project Contract No: SE/100,Study, Design &Construction, Operation &Maintenance of Pumping Station, Waste Water Treatment Plant& Pressure Mains in South of New Jahra Scrap Area.

Client: Ministry Of Public Works

Value: KD 36 Million

Electrical Works Involve Estimation, Design, Supply, Installation,Testing and Commissioning of the following.

11KV switchgear Panels,Battery Charger, Standby Generator, Control Panels etc.

11KV Over Head Transmission line

3.3KV Induction Motors

440V MLTBs &MCCs

Earthing System

Associated HT &LT Power and Control Cables

Project: Contract no: 28164, Improvement to ESD System in 8 – Gathering centres- East Kuwait.

Client: Kuwait Oil Company

Value: KD 2.32 Million

Electrical Works Involve Design, Supply, Installation Testing and

Commissioning of the following:

Modification Works in 440v MCC in Each GC

440V flame proof DB’s in Each GC

Motor Operated Valves-44nos

Earthing system for MOV’s in each GC

Associated LT Power and Control Cables

Project: Contract no: 32861, Improvement to ESD System in 6-

Gathering centres - South Kuwait.

Client: Kuwait Oil Company

Value: KD 3.2 Million

Electrical Works Involve Design, Supply, Installation Testing and

Commissioning of the following:

Modification Works in 440v MCC in Each GC

440V flame proof DB’s in Each GC

Motor Operated Valves-36nos

Ear thing system for MOV’s in each GC

Associated LT Power and Control Cables.

Project: Contract HQ 595PC06-Renovation of Water Treatment Facilities in Al-Khafji Saudi Arabia.

Client: Khafji Joint Operations

Supervision during the Construction Phase of the project

Interdepartmental coordination for Multi-disciplined Project.

Preparation of Progress reports for the Management/ Client.

Progress Review meetings with the Client/Management.

Preparation of RFQ’s, Data sheets for Electrical Equipments and material like HT and LT cables, HV &LV Transformers, MV&LV Switchgears & MCCs etc.

Technical and Commercial Evaluation of Equipment and material offers from vendors.

Coordination with the Procurement, Expediting Departments for the material and material delivery.

As Project Engineer handled the following Projects

1)Diversion of Power Supply at North Tank farm area.

Client: Kuwait Oil Company.

Value: KD 1.5 Million

Electrical works involved in the project:

Laying, Termination, jointing of 11KV power Cables to a Distance of 3 Kms ..

Modification works in existing 11KV Substation.

Testing and Commissioning works.

2)Maintenance Works in Riqqa Sewage Treatment Plant.

Client: Ministry of Public Works

●Maintenance of 11KV Switchgear.

● 440V MCC.

●Distribution Boards,

●Battery& Battery Charger.

●Transformers

3) Design,Construction, Operation & Maintenance of Sewage Treatment Plant at Lusail Qatar.

Client: Qatar Diyar

Value: KD. 40 Million

Electrical Works Involved in the Project:

Installation Testing &Commissioning of 11KV Switchgear panels

440V MCC, Announiciator and Marshalling Cabinets

440V, 15KW pump motors.

LV and HV power and control cable laying and termination.

Plant Lighting system, small power

Earthing system

June 2002-April 2005

M/s. Al-Ahleia Switchgear Co. KSC

One of the Leading Switchgear Manufacturers in Kuwait. And also Carryout all Electrical installations, testing and Commissioning of Switchgear, Transformers, UDS,MCC and Battery charger etc in KOC, KNPC, MEW, and MPW.

Job profile

Supervision during Construction Phase.

Estimation of tenders.

Coordination with the Inspection Authorities of the Client.

Progress Review meetings with the Client/Management.

Technical coordination meetings with the Client.

Coordination with the Material suppliers.

Preparation of Monthly Payment Certificates

Preparation of Data Sheets for Electrical Equipments and accessories.

Monitoring Safety Precautions and adhering to Safety rules and regulations.

1) Project Synopsis: Design, Installation testing and commissioning of 7Nos. Of Package Substations.(M78,M79,M80,M81,M82,M83,M84) for New Oil Pier and its associated Facilities .

Client: Kuwait National Petroleum Company(KNPC)

Electrical Works Involved in the Project

11 KV Switchgear installation, testing & Commissioning works

3.3KV Switchgear installation, testing &Commissioning

440V switchgear & MCCs

11/3.3KV,11/0.480KV,dry type Transformer Installation, testing & commissioning.

Battery, Battery Charger installation, testing& Commissioning.

Substation lighting system

Substation fire alarm system

Earthing System.

HV & LV Power Cables, Control Cables.

Primary and Secondary Injection tests for checking CT Ratio, Polarity and CT Magnetisation Test, Testing PTs, Transformer Tests, Hipot Test, Charging and discharging test for Batteries, Setting of Protection Relays.etc

2)Reconstruction of M-74A and M74-B Conventional type Substations in Mina Al-Ahmadi Refinery

Project Synopsis:Design, Installation testing and commissioning of 2Nos. Of Substations

Client: Kuwait National Petroleum Company.

Value: KD 8.0 Million

Electrical Works Involved in the Project:

Modifications of Existing 11KV Switchgear

11 KV Switch gear& MCC

440V Switch gear and MCC

Battery and Battery charger

11 KV generator control panels

Auxiliary control panels

Plant Lighting System

Earthing System

HV & LV Power cables, Control cables

3)Vaccum Re run Revamp project in Mina Abdullah Refinery.

Project Synopsis:Supply,Installation, Testing and Commissioning of One no of Package Substation.

Client: Kuwait National Petrolium Company

Value: KD1.0 million

Electrical works include Supply, Installation, Testing and

Commissioning of the following:

Modifications of Existing 11KV Switchgear

11 KV Switch gear& MCC

440V Switch gear and MCC

Battery and Battery charger

11 KV generator control panels

Lighting and small power system

Earthing system

4)EPC of New Package Substation to replace M56 and P/H2 Substations in Mina Ahmadi Refinery.

Project Synopsis:Supply, Installation, Testing and Commissioning of One no of Package Substation.

Client: Kuwait National PetroleumCompany

Electrical works in the above projects include:

Installation of 11 KV Switch gears.

Installation of 440V Switchgears and MCCs

HT and LT cabling

Installation of Transformers up to 5MVA

HVAC System

Fire Fighting and Fire Alarm System

.

5)Diversion Of Power supply and Construction of New Centralised Substation at GC-17, North Kuwait.

Project Synopsis: Design,Supply, Installation,Testing and Commissioning of 11KV Switchgear Panels,440V MCCand related modification works.

Client: Kuwait Oil Company

Electrical works in the above projects include:

Installation of 11 KV Switch gears.

Installation of 440V Switchgears and MCCs

HT and LT cabling

Installation of Transformers

HVAC System

Fire Fighting and Fire Alarm System

Battery and Battery Chargers.

6)Installation Of 4 Nos. of Inverters and related Cabling works in Mina Al- Zour Power Station.

Client: Ministry of Public Works. (MPW)

Electrical works in the above projects include:

Supply &Installation of Inverter Panels.

Associated Cabling Works.

7)Supply, Testing & Commissioning of 11KV Substations (15 nos.) Sulaibiya andArdiya Waste water Treatment plant.

Client: Ministry of Public Works. (MPW)

Electrical works in the above projects include:

Installation of 11 KV Switch gears.

Installation of 440V Switchgears and MCCs

HT and LT cabling

Installation of Transformers

Battery and Battery Chargers.

May1997-May 2002

M/s. Arabian Construction & Maintenance Co.

Al-Khafji, Kingdom of Saudi Arabia

A Reputed Contracting & Trading company with significant presence in oil,Petrochemical and General Sectors.

Job Profile:

Design, Construction, Testing and Commissioning of Electrical works of Projects assigned.

Estimation of tenders for major projects.

Coordination with other departments for Multi-disciplinary Projects.

Organises and Allocates Manpower, Equipment, Tools and Tackles for the electrical works of the projects assigned.

Attend Progress review meetings with Clients.

Preparation of Progress reports, Concerns and Corrective actions for the Management.

Technical and Commercial Evaluation of Equipment and material offers from vendors.

As a Senior Electrical Engineer handled the following projects:

1) Construction of Sea water Desalination Plant

Client: Arabian Oil Company

Electrical Works Involve Design, Supply, Installation Testing and

Commissioning of the following:

Installation of 11 KV Switch gears.

Installation of 440V Switchgears and MCCs

HT and LT cabling

Installation of Transformers

HVAC System

Fire Fighting and Fire Alarm System

Battery and Battery Chargers.

Cathodic Protection System to Tanks and Pipelines.

Standby Generator sets, Automatic Transfer Switch.

May1996-April 1997

M/s.Canara Springs Limited, Mangalore, India.

Canara Springs is a Integrated Mini Steel Plant with Rolling Cast Iron Foundry and Automobile Spares Manufacturing Facilities

Job Profile:

Design, Construction, Testing and Commissioning of Electrical works of Projects assigned.

Procurement of New Equipment as per data sheets and specifications

Inspection, Installation and Commissioning of Electrical Equipments.

Supervision of all Electrical Maintenance works.

Preparation of Shutdown Schedule and Manpower planning.

Preparing of Reports and related Correspondences.