Hisham Fakhery Mahmoud

• Address: Giza – Fasel 26 Hossam El dein /eleshren

• Mobile: (002 011********) (002 010********)

• Email: adz80t@r.postjobfree.com

Academic qualification: Diploma of the Institute of Advanced Architectural Technical Studies in Architectural Studies

Job Description: Civil and Architectural Supervisor accredited by the Kuwait National Petroleum Corporation Petroleum Facilities

To work in Al-Zour and Al-Ahmadi refineries

Accredited by the advisory body for supervision, Quebec, to supervise petroleum and oil refinery projects in the Middle East.

Functional objective: work, follow-up and monitor the activities and civil and architectural works in progress in the project by implementing plans, procedures and controls. Quality according to the highest standards of engineering and compliance of all companies and contractors, in cooperation with the implementation staff and review of specifications And reviewing it during work and handing it over in cooperation with the implementation staff and entering any materials to the site and matching them with the one approved by the authority Advisory

\MSR\ IR \MIRRFI \NCR MS

Previous experience :

Page 2 of 4

BIC company Dec 2022 till now

pro service (mid town villa project) Nov 2021 till Dec 2022 at Egyptian Co. for works and finishing Al Marwan indoor

& outdoor(hospital sabet sabet project ) June 2021 till Nov 2021 for KNPC Al-Zour Refinery Project EPC Package # 4 April 2015 till June 2021 Total 2. WORK EXPERIENCE

Over 22 years of experience in the construction field in Egypt as QC Inspector - Civil Civil Supervisor (9 years).

1 -2016 to 2021 kccec Kuwait worked with the National Petroleum Company KIPIC & ESSAR- SAIPEM (PMC Consulting Office)

Work in the construction works of the Al-Zour Refinery station in the port of Al-Zour, the works of oil and liquefied gas tanks and all other works

Construction from the refinery to final delivery 2016/2018 Work in slipper podium tanks, orbital sewer pipe, shelters and manholes

. Responsible for the precast concrete area of the project

. Pipe fitting supplier

. Responsible for the completion of ready-mixed concrete, special bases and casting on site, Precast

. Responsible for the final finishing works of concrete

. Final inspection and delivery after reviewing fees General contractor, National Oil Company

. Working under SAIPEM/ESSAR. KIPIC contractor

16. February 2016

2- Work in Mina Al-Ahmadi Refinery, construction work, especially for the work of 2 power stations 2018/2019

Works at Al-Wafra station (high-pressure power station), its construction until completion, 2019/2020 3- Nile Valley Contracting Real Estate Investments Company Fayoum project from 3/1994 to 3/1995 with a total cost of 60 million pounds Excavating and leveling the level

Making regular bases, posts and necks of columns up to the ground level concrete structure

Building works

External finishes until final delivery

Page 3 of 4

(Police Academy in Abbasiya) A building for training foreign police officers from 4/1995 to 7/1995 with a total cost of 24 million pounds

1- The building of the general administration of the academy 2- A building for the officers

Preparing buildings, columns, concrete and renovation Finishing facades and landscaping.

4- Mubarak Security Academy from 8/1995 to 8/2003 at a total cost of 2.5 billion Preparing buildings, columns, concrete and renovation Interior finishing, facades and landscapes

1. 1- The building of the general administration of the academy 2. 2- A building where the officers lived

3. 3- Education classes

4. 4- Student stands

5. 5- General services and maintenance building

6. 6-Workshop building

7. 7 building of the General Services Administration 8. 8- Soldiers accommodation building

9. 9-The restaurant building

10. 10- Soldiers' restaurants, non-commissioned officer Land preparation up to foundation level

Bases, meads and necks of columns until reaching the surface of the earth concrete structure

5-Finishing for facades and landscapes for the following buildings: The meeting room in the administration building

Training ground building

Ground tank

- Fire station

The main hospital building

Disciplinary building

Ammunition building

The outer walls of the main street

- GRC works for the facades of all previous buildings Ground tank

-Treatment plant

- Students' stands, Dr.'s runway

The main gate (Gate 1), complete finishing, granite, marble and landscape works Suez market from 9/2003 to 10/2006 at a total cost of 60 million pounds. Fruit and vegetable building

fish building

Final finishes and landscaping

Page 4 of 4

Marble, ceramic and granite works

6- Vodafone "Alkan Network Company" from 11/2006 to 1/2008 Supervision of regular and reinforced concrete works up to the column necks of the tower Making rules for machine devices on the surface of the earth Work rules for the electric generator

Finishing the site after installing the tower and operating the networks Total number of 120 sites with a total of 40 million Until Vodafone delivers the complete business and raises the network to work 7-Nile Valley Contracting and Real Estate Investment Company from 2004 to 2008 Al Diyar project "New Cairo" 800 villas

In all the "villas" works for 90 villas, the works were supervised from excavation to street level to finishing

External landscaping for all villas and work on it to date Civil and Architectural Inspector General

Will provide guidance, support and professional advice as site representative on all matters related to ensuring quality construction for civil works

Compliance and procedures management

To assist in the coordination and delivery of the project. To work so that the project meets time, quality and budget targets, while meeting or exceeding customer expectations. Supervise the contractor's work and maintain required records and related records Check metrics of work completed and prepare regular reports on progress against the programme Review and comment on contractor offers

Attend inspections with authorities

Review the design and help coordinate with other disciplines to ensure buildability Provide all necessary directions on site and issue site instructions Ensure that all material checks and tests are carried out in accordance with specifications and contract requirements

Review and prepare responses to contractor proposals (i.e. method statements, information requests, ITPs, etc.)

Monitor site integrity and issue notifications as appropriate Report to the Resident Engineer and update drawings and specifications as required Participate in planning, identify risks and help solve problems in a timely manner Check the instructions in action

Page 5 of 4

Ensure accuracy and completeness of records, including documents generated Prepare documentation for works completed for client handover Ensure that the contractor works on the latest approved executive plans shall plan, supervise and control the work forces and/or sub-contractor for the successful execution of the civil activities under the direction of construction manager and civil superintendent. Also he will persist the close cooperation with other staffs and client’s personnel at the job site. See attached organization chart for details

HSE auditing: observe the work in progress to ensure that such work being performed in accordance with safety regulation.

Conduct that the safety requirements and regulations are to be observed by all assigned workers and construction equipment and tools are maintained and used in safe condition and correct manner

- Material control; (relevant work for the materials which shall be supplied by client, company or subcontractor).

Daily: daily report which define manpower, construction equipment, performed work and event

Weekly: weekly working schedule and progress report concrete work (test report, check list etc Technical specification for civil works

Page 6 of 4

Page 7 of 4



Contact this candidate