Post Job Free

Resume

Sign in

Project Manager Production

Location:
Weirton, WV
Salary:
$100/hr
Posted:
October 05, 2023

Contact this candidate

Resume:

THOMAS R. MAROSI

*** ******** *****, **********, ** 26037

Phone: 304-***-**** (H) 304-***-**** (C)

Email: adz6ow@r.postjobfree.com

Professional Summary

Versatile Production Manager and engineer knowledgeable about equipment operation, quality standards, and safety hazards. Able to step into any production position and work hands-on with team members. Versed in documentation, compliance, and scheduling.

Experience

Creativity Before Capital - Consultant

Various locations – Somerset, NJ; Hagerstown, MD; Lake Charles, LA; Lesage, WV

10/2021 – present (under consulting contract)

Develop mechanical integrity process and procedures.

Develop/implement maintenance work planning/scheduling process and set up maintenance shop.

Project manager of new product line.

Power Boiler and Turbines Area Manager

Pixelle Solutions – Chillicothe, OH

06/2021 – 10/2022

Manage utilities power boilers 2 gas fired and one waste wood/tire fired.

Manage 3 steam turbines and electrical system.

Manage develop and administer budget for these areas.

Support management of other areas such as woodyard, pump mill, and recovery boiler

Energy Production Superintendent Sr.

AEP – Kentucky Power – Mitchell Plant, Moundsville, WV

05/2014 – 10/2018

Set and revised production schedules to meet changing demands

Managed plant operations staff of 150 people (represented and non-represented) for a 1600 MW generating facility. Ensured adherence to all processes, policies, and applicable industry standards.

Established clear priorities and production quality standards.

Prepared and maintained production reports and personnel records.

Reviewed processing schedules and production orders concerning production requirements, staffing requirements, work procedures, and duty assignments, considering budgetary limitations and time constraints.

Oversaw the production process and managed the production schedule.

Monitored production performance and quality-controlled programs.

Managed environmental and lab operations and activities

Managed multimillion dollar landfill project, contract execution, and fixed price contract implementation.

Responsible for achieving production requirements.

Organized work to meet demanding production goals.

Kept work environments safe and efficient at all times.

Set up and verified the functionality of safety equipment.

Managed team performance by training, mentoring, disciplining, and motivating employees.

Planned, scheduled, and delegated the daily work.

Maintenance Supervisor Sr.

AEP – Ohio Power Co. – Cardinal Plant, Brilliant, OH

05/2002 –05/2014

Responsible for creative design and installation of selective catalytic reduction and flue gas desulfurization environmental control project controls. Worked to manage and develop program budget for projects and utilized cost and control methodologies and tools. Project manager for instrumentation and control installation for these projects and a plant control upgrade. Lead and managed design, design reviews, staffing, construction, and installation of this $800 million project portion within schedule and within budget.

Lead safety and health directives for project installation management. Held and directed daily/weekly/monthly job safety analysis. Performed daily job site safety assessment (JSSA). Lead and prepared reports and resolution for accident investigations if/when needed.

Lead lean continuous improvement efforts by measuring, reporting, and initiating improvement activities and studies for implementation. Lead development of KPIs (key performance indicators)

Responsible for daily walk up job site safety assessment reviews with follow-up reports

Reviewed and approved control logic upgrades and project controls. Coordinated these reviews with engineering, construction project, environmental, and safety groups.

Managed and provided technical direction for environmental, health, and safety (EHS) roles.

Perform daily progress review walk downs and prepared update/status reports of project progress.

Assisted with training development strategy for technicians.

Managed running maintenance instrument, control, and electrical maintenance.

Plant Engineer Sr.

AEP – Ohio Power Co. – Cardinal Plant, Brilliant, OH

05/2000 – 05/2002

Managed plant O&M and capital budget for 1800MW generating facility.

Project Engineer

AEP – Capital Investment Co – Columbus, OH

05/1999 – 05/2000

Liaised with company executives and project managers to acquire resources to perform maintenance reviews of refinery facilities for proposal for maintenance contracts with other businesses to grow AEP capital investments extended business company growth.

Energy Production Operation Team Leader

AEP – Ohio Power Co. – Cardinal Plant, Brilliant, OH

05/1996 – 05/1999

Managed and led the shift production and maintenance of an 1800 MW generating facility.

Coordinated maintenance and operation with daylight personnel.

Responsible for and managed an administrative department leading budget, accounting and project engineering.

Plant Operations Engineer

AEP – Ohio Power Co. – Cardinal Plant, Brilliant, OH

05/1995 – 05/1996

Worked directly with operations department and engineering disciplines and analyzed operation to achieve production optimization.

Plant Engineer Sr.

AEP – Ohio Power Co. – Tidd PFBC Demonstration Plant, Brilliant, OH

09/1989 – 05/1995

Managed design, construction, and engineering installation and operation of a pressurized fluid bed combustion design test facility under contract and partnership with the US Department of Energy.

Performed installation and control checkout of the facility and managed the testing program.

Prepared reports of testing success and analysis of operation with data.

Mechanical Engineer

AEP Service Corp –Mechanical Engineering Dept - Columbus, OH

08/1988 – 10/1989

Wrote and developed system descriptions and operating procedures for a pressurized fluid bed combustion test facility.

Plant Performance and Maintenance Engineer

AEP – Ohio Power Co. – Kammer Plant, Moundsville, WV

05/1984 – 08/1988

Produced performance testing, reports and documents for senior team members.

Analyzed system documents for appropriate plant engineering.

Performed project engineering functions.

Performed plant maintenance functions including outage inspections and balancing rotating equipment.

Education

Bachelor of Science Mechanical Engineering (BSME)

West Virginia University, Morgantown, WV

1984 graduated Cum laude

Master of Business Administration (MBA)

West Virginia University, Morgantown, WV

1988

Accomplishments

Earned and was nominated for “AEP Key Contributor” monetary and recognition award for corporation (AEP) in May 2007 for successful installation and start-up of flue gas desulfurization environmental controls equipment.

Safety audit – Lead safety audits to monitor employee behavior and ensure safe compliance with company policies and safety regulations.

Additional Information

Completed course for PMP (Project Management Professional)

Software experience – MS Word, Access, Excel, Project; ABB logic and graphic development software; Work management, time reporting, time/contract approval, budgeting software

Experienced with work management software tools SAP, Hippo, and AssetSuite

Completed AEP Executive management program with Ohio State University in 1998.

Completed Leaders in Changing Times program at Virginia Tech in 1997.

Completed Leadership Weirton Program in 1998.

Completed Dale Carnegie Leadership Course 1999.

References

References are available on request.



Contact this candidate