Post Job Free
Sign in

Data Center Field Technician

Location:
Merrick, NY
Salary:
120 yearly but negotiable
Posted:
October 04, 2023

Contact this candidate

Resume:

Kester Campbell

* ********* **, *********, ** ***75

**************@*****.***

201-***-****

Over 20 years of experience as a telecommunications field technician & specialize in maintenance, managing projects, test & turn up programing and installation. Skills

● An effective leader and team builder highly skilled in verbal and written communication.

● Have advanced skills with Windows and Linux Servers, Network maintenance, System upgrades, System backups, Data backup and retrieval, Brand development, Technical specifications creation, CISCO router management, IP Forwarding, diagnostic skills, Cisco 2900 series routers, Cisco 3400 stackable switches, HP servers, Network connectivity knowledge, VOIPinstallation and repair DC Power, Calix’s C7 and E7, Adtran 5K & Cisco 15454 Transport.

Employment

Commscope/Arris November 2020 - Present

● New data center build

● Install cabinets according to floor plan

● Install all gears: dcn /ciena /gear/juniper/arista/del-servers/hp-servers .

● Run all cables power/copper/fibers

● Cables terminations at both ends/test all connections

● Ordering materials to start or complete projects

● Working remotely with engineers

● Grounding all units/cabinets

● Power up all device/confirm with customer

● Editing/updating EDP-MOP

● Troubleshooting /replace -fibers,cat6,optics

● Inventory confirming the bom-list is accurate

● Reverse logistics

● Full site clean up

● Take photos/share with customer in work chat

● Console in to units if needed

● Update ios /script if needed

● Full site decom as per EDP-MOP

Arris Solutions Jan 2019 – November 2020

● Fiber

● Cat6

● Optics

● Switch replacements

● Installations at remote locations

Adex Telecom Network Technician Nov 2016- Dec 2018

● Install & test Calix’s E7 cabling and software

● Verify tests & turn ups

● Install patch panels

● Install power edge R630 & cable

● Install Cisco 15454 transporter

● Rolled traffic over to CWDM and verified customer lines were operational.

● Installed new power plant and multiple remote locations ONYX

● Installation of Cisco switches along with SPF

● Gigamon patch panel

● Radware R4420 DDos pro

● Router fiber cabling as well as Cat6 cable

● Power cabling AC/DC using then MOP for AT&T or Verizon

● Communicating assistance with engineers by phone or Skype to ensure the job is complete as well as done effectively.

ERICSSON

● Work scope for SPRINT

● Programmed routers

● Cabled router with Cat6n or n fiber designated remote locations

● Installed and Grounded router at designated remote cell sites.

● SFP swap on radio antennae and on node for better signal and reception between Alpha Gamma and Beta. Version Current Telecommunications Tech. October 2016 - November 2016

● Installed racks, ran power cables

● Lace cable, add breakers

● Build up return bars, add rectify bays

CBM OF America at Verizon Central Office Installation 2015 - 2016

● Installed cabinets, racks

● Rack & stack servers, run fibers

● Power up servers from fuse Panel

GDT at Verizon Wireless Central Office Installer Level III & IV 2014 – 2015

● Data Center

● Installation of Cisco routers 7600 and 7613

● Installation of Tektronix systems

● Installation of sun servers

● Changing blades for Cisco routers and Sun servers

● Plugging fibers into ports and labeling them

Strategic Solutions Central Office Installer Level III 2011-2014

● Installation of Cisco routers 7600 and 7613 • Installation of Juniper series 3400

● Installation of OpNet response expert 4200

● Installation of Anue series 5723

● Testing and cleaning fibers

● Full knowledge of matrix to establish cable run

● Installation of primary as well as secondary power cable racks

● Running and lacing 750 load and return 750 power cables

● Installing BDFB

● Spill containment for battery string

● Building battery stands from ground up

● Applied Noox lightly to battery straps; place batteries to charge. MGA Central Office Installer Level 1, II and III 2011 – 2011

● Installation and removing racks and bays such as HSE, IMTN, DDP, and DSC

● Testing and cleaning fibers

● Running, lacing and heat shrinking cables

● Slicing LCC connectors

● Crimping power cables

● Labeling and ordering supplies for inventory

● Installation of ground external discharge bus bars

● Running frame ground

● Removing and Installation of rectifiers

● Performing installation test such as power verification and hardware provisioning and system test cable mining operations

● Removing and replacing battery strips

Education

George Wingate High School September, 1996 – June 1999

● High School Diploma

● Certificate in Workshop technology



Contact this candidate