Post Job Free

Resume

Sign in

Technical Support Risk Assessment

Location:
Karachi, Sindh, Pakistan
Posted:
August 17, 2023

Contact this candidate

Resume:

* * * * *

Muhammad Irfan

A-*** Gulshan e Hadeed Phase 01

Bin Qasim Town

Karachi, Pakistan.

Phone: +92-331-**-**-*-**/ +92-301-**-**-*-**

E-mail: adyzx0@r.postjobfree.com

Objective

To obtain a position in reputable organization where I can utilize my skills to make the workplace safer and promote safety culture by implementing company’s HSE policy; and fulfill the legal requirements. Professional Summary

Construction and Drilling Safety Professional, dedicated to ensure the safety of employees by raising their awareness and perception level through orientation and liaison. Detail-oriented and highly skilled in identifying potential hazards and dangers on the workplace. Education

M. SC Environmental Science 2013

Federal Urdu University for Arts, Science and Technology, Karachi One Year Diploma in HSE 2009

Modern Institute of Informatics and Management, Islamabad Bachelor of Science 2006

University of Karachi

Trainings/ Certifications

NEBOSH International General Certificate

TUV NORD

IMS training for Internal Auditor (ISO 14001 & OHSAS 18001)

IOSH IOSH Managing safely certificate

CONSULT & TRAIN Onsite Fire Fighting and extinguishing Systems CIVIL DEFENCE Fire Prevention Officer

RUTLEDGE H2S Level 01 H2S safety training from Rutledge H2S Safety Services HABC Level 02 H2S safety from HABC United Kingdom

HABC Basic Fire Fighting from HABC United Kingdom

SAINT JOHN & HABC

First Aid and CPR Training from Saint John Ambulance Association & HABC

ICI PPTA

Training for basic firefighting from PTA limited.

Training for operating and use of breathing apparatuses from PTA limited CHASHMA NUCLEAR

POWER PLANT

Nuclear radiation acute and chronic effects

Radiation Absorbed Dose limits and controls

Use of TLD (Thermo luminescence Dosimeter)

DESCON ENG LTD Scaffolding Inspector

2 P a g e

Professional Experience

Descon Engineering Limited April 2022 to Present

In-charge Site HSE at AkzoNobel Pakistan

EPC of AkzoNobel Chemical and Paint Factory

Evaluate safety hazards and develop proactive strategies to address.

Coordinate safety action plans and ensure implementation and continuous improvement.

Implement and maintain ISO 14001 and ISO 45001 management systems.

Establish and lead programs to evaluate and monitor safety, health, and environmental practices.

Perform safety surveys and walkthroughs to identify unsafe acts, unsafe conditions and eliminate risks proactively.

Design and conduct safety trainings for staff to enhance capabilities

Conduct awareness session and safety campaigns to promote safety culture.

Conduct daily walkthroughs, site safety meetings, HSE reward and recognition programs.

Investigate and report all incidents and critical findings, initiate corrective actions to avoid recurrences and action plans for preventive measures.

Monitor sub-contractor’s safety activities to ensure services performed in accordance with company guidelines and regulations.

Develop audit plans and facilitate internal and external audits.

Compile and report HSE statistic on daily and monthly basis.

Perform quality inspection of protective gears and report quality issues for further improvement.

Liaison with line management to achieve optimum level of safe working. Pakistan Petroleum Limited May 2017 to April 2022

HSE ADVISOR (Drilling and Construction Works)

Responsibilities:

Implementing company’s HS & E policy to achieve targets and objectives

Perform hazard identification, risk analysis, risk assessment and job safety analysis. Create safety awareness by promoting safety meetings, presentations, and open forum discussions.

Perform inspections of construction activities including excavations, heavy lifting, steel reinforcing and mechanical erection of structure and construction of access roads.

Perform fire risk assessment and actively monitor all activities to prevent fire. Train the crew on fire prevention techniques and ensure the use of flameproof equipment in hazardous zones.

Attend HSE Meetings and provide technical support related to HSE issues.

Conduct awareness sessions and motivational campaigns on 18 LSRs.

Conduct T-20 meetings and advise on resolution of STOP Cards

Conduct pre-spud rig audits to confirm local and API standards.

Perform and accommodate internal and external audits.

Ensure that drills are conducted i.e., Fire, Man Down, BOP and other drills. Training fire teams, rescue team and rig crew to enhance the abilities and skills to overcome in real emergencies.

Actively involved in preparation of site-specificeffective medical evacuation plans before spud and keep in contact with local authorities.

Actively involved in investigation of Accidents/incident / near miss / Spills / Fires to find the root causes and recommends corrective and preventive actions.

Perform pre spud inspections for all critical QHSE Equipment and ensure the availability of all mandatory documents/ certifications pertaining rig and personnel.

Ensure that contractor performs inspections and preventive maintenance of all rig safety equipment.

Perform walkthroughs to identify any non-compliance and deviations pertaining legal and IOGP requirements and advises as per need.

Identify chemical, physical, mechanical and biological agents hazardous to health during operations and recommend personal protection and operational technical methods.

Prepare, conduct and assure implementation of periodic educational programs with a view to promote employee’s 3 P a g e

awareness on health hazards and effects concerned to the operations.

Coordinate with Rig Doctor in assessment of employee exposure to potential risk and damage caused by working environment, ensuring the proper loss prevention measures in place to minimize employee exposure and providing required protection.

Ensure the calibration and maintenance of occupational health monitoring equipment.

Ensure environmental testing for the evaluation of airborne chemical contaminants, and biological agents considered hazardous to health (Silica, Asbestos, Lead, Mercury, NOx and SOx) and physical agents including noise, heat, light radiation etc.

Exalo Drilling S.A June 2013 to April 2017

HSE ADVISOR (Drilling and Construction Work)

Worked on Kelly drive and Top Drive Rigs for drilling and work-over operations i.e Drillmec 2000, RR-600, IRI 1700 and IDM-2000.

Working experience with major operating companies of Pakistan as mentioned below:

UEPL (Formerly British Petroleum limited) for drilling and workover wells in Badin, Tando Muhammad Khan and Tando Allah Yar blocks including

MOL BV in TAL Block at Mardan Khel 1 and Makori Deep wells

OGDCL at Qadirpur Gas Field

POL in Khaur field at Jhandial well.

Responsibilities:

Implement company’s H&S policy to achieve targets and objectives

Prepare HSE Plans and presentations.

Perform hazard identification, risk analysis, risk assessment and job safety analysis. Create safety awareness by promoting safety meetings, presentations, and open forum discussions and by implementing safety training.

Carryout inspections and monitoring of construction sites for civil works on new locations before rig move.

Perform fire risk assessment and actively monitor all activities to prevent fire. Train the crew on fire prevention techniques and ensure the use of fireproof equipment at site.

Attend the HSE Meetings and provide technical support related to HSE issues

Conduct Fire, Man Down, BOP and other drills and provide trainings to the fire team, rescue team and rig crew to enhance the abilities and skills to overcome the real emergencies.

Assist emergency team leaders and take control when required.

Prepare and ensure the effectiveness of medical evacuation plans before spud and keep in contact with local authorities.

Investigate of all Accidents/incident / near miss / Spills / Fires to find the root Causes and recommends corrective actions.

Inspect all rig safety equipment and ensure the preventive maintenance of equipment to avoid any mishap.

Plan heavy lifting and rig move procedures. Visit the new locations for readiness prior to rig move and advice on any non-compliance.

Identify and recommend personal protection and operational technical methods for controls of chemical, physical, mechanical and biological agents, which are hazardous to health during operations.

Prepare, conduct and assure implementation of periodic educational programs with a view to promote employees awareness on health hazards and effects concerned to the operations.

Update record of personnel sick leaves and personnel occupational health matters.

Coordinate with Rig Doctor in assessment of employee exposure to potential risk and damage caused by working environment, ensuring the proper loss prevention measures in place to minimize employee exposure and providing required protection.

Maintain occupational health monitoring equipment inventory, calibration and maintenance.

Conduct environmental testing for the evaluation of airborne chemical contaminants, and biological agents considered hazardous to health (Silica, Asbestos, Lead, Mercury, NOx and SOx) and physical agents including noise, heat, light radiation etc.

4 P a g e

Deutsche Babcock Energie-Und Umwelttechnik A.G. Feb 2009 to Dec 2010 HSE IN-CHARGE

Worked on below projects:

1. ABU DHABI WATER AND ELECTRICITY AUTHORITY (ADWEA) 2. EMIRATES ALUMUNUM SMELTING PLANT 1400000 TPA (Taweelah, Abu Dhabi) 3. FUJAIRAH ASIA POWER COMPANY F2-RO PLANT (UAE)

4. QURAYYAH POWER PLANT (Saudi Arabia)

Responsibilities:

Responsible for implementation of Company’s EHS program in all sites at Western Region.

Perform walkthroughs and site audits; liaise with site management for improvement.

Collect HSE reports from site HSE Officers and after compiling, submit to Country HSE manager.

Perform training need analysis and arrange in house and third party trainings of workers.

Deputed as Internal Auditor at Asia Power Company F2 RO Plant project to support site HSE Officer for preparation third party audit of ISO 14001 and OHSAS 18001 certification of company.

Audit was accomplished by TUV Nord and certification achieved without any non-conformance. Descon Engineering Limited July 2006 to Feb 2009

HSE OFFICER

Worked on several projects as mentioned below:

1. Land Reclamation work for Trans Asia Oil Refinery (Karachi) 2. Major Shutdown at Akzonobel Pakistan PTA Limited (Karachi) 3. Construction of world’s largest ammonia urea complex at Engro Chemicals Pakistan Limited 4. Bosicor Oil Refinery CDU Revamp

5. Construction of Indus Refinery

6. Chashma 325 Megawatt Nuclear Power Plant RFO-04 7. Construction and commissioning of Dg Khan Cement Company Limited 8. Major Shutdown at Fauji Fertilizer Bin Qasim Limited 9. Several Shutdowns and Live Plant Maintenance works at ICI PPTA Limited Skills

MS OFFICE APPLICATION: (MS Word, MS Excel, MS PowerPoint and Outlook Express). Microsoft Windows and DOS: (Installation, Application and troubleshooting) Personal

Full Name: Muhammad Irfan

Father’s Name: Muhammad Aslam

DOB: 05, Aug 1980

CNIC: 42501-6177520-3

Address: A-875 Gulshan e Hadeed Phase 01 Bin Qasim Town Karachi Cell: +92-331-***-**-**/ +92-301-***-**-**

Email: adyzx0@r.postjobfree.com



Contact this candidate