MR. HANZLE L. DELOS REYES
Sangkat Boeung Keng Kang III,
Phnom Penh.
Mobile no.: +855-********
Email: *******@*****.***
I. POSITION DESIRED : Project Manager/ Construction Manager/ Technical & QAQC Manager /or any relevant.
II. PERSONAL DATA
Date of Birth : August 18, 1979
Place of Birth : Zamboanga City
Nationality : Filipino
Age : 41 years old
Marital Status : Married
Languages/Dialect : English and Melayu (Written and Spoken) Tagalog, Chavacano and Visaya
III. EMPLOYMENT RECORD
EMPLOYER POSITION PERIOD PROJECT TITLE AND CONTRACT SUM UC Design Build (Developer)
CK&A Consultancy International
Cambodia Ltd. (Singapore
based company)
Project
Management
Officer
Construction
Manager/
Project
Coordinator
1st March 2020
– present
1st March 2017
– 29th Feb
2020
• Coordination among Heads of Departments Design team
(Architect, Structure, MEP & QS).
• Progress monitoring of 4 projects assigned – by introducing, improved and implementing systematic project management to an international standard.
• Assigned as Project Engineer, QAQC, managing QS & document controller, and safety in-charged for company project.
• Assisting an international project management consultant to ensure smooth project operations.
• Miscellaneous progress reporting to top management.
• Coordinating site management team on the status of the projects.
• Consultancy, project management and administration for buildings and housing projects for the following projects in Phnom Penh, Cambodia;
i) One of the first affordable housing development in Cambodia consist of 2457 house units (Phase I) & commercial lots; Srey Mongkul Satellite City.
(USD 28,000,000.00)
ii) WB Arena development in Sang Kat Chat Angre Krom, Khan Meanchey.
(USD 2,300,000.00)
iii) Proposed Mekong Housing Project – The Palms (Hi-ends residential development in Cambodia)
(USD 46,500,000.00)
2 8
AKAS Permai Sdn. Bhd.,
Malaysia.
General Sub-Contractor
Kata General Engineering Sdn.
Bhd. / Apex Energy Sdn. Bhd.
Malaysia.
Freelance
Quantity
Surveyor
Construction
Manager
October 2016
– February
2017
Feb 2015 –
May 2016
Work Responsibilities;
• Ensure contractors to comply with construction
specifications, standards and procedures.
• Responsible in checking and coordination for all drawing so as to avoid any interface conflict in the construction.
• Coordinating all correspondents, documentations & submissions.
• Responsible in reporting and solving all technical issues and discrepancies by means of dealing with the in-house consultant in those particular matters.
• Attending general meetings for the undergoing projects.
• General project monitoring.
• Internal coordination and management of staffs.
• Reporting to general manager and director.
• Proposed 999 Units Apartments (3 Blocks 24 Storey Subsidiary
(Strata) to be Applied For) & 1 Block 4 Storey Community Facilities Cum Carpark and 24 Units of 2 Storey Shops on LA No. 20-09070134 Lot 1 at Mile 1, Jalan Buli Sim Sim, Sandakan, Sabah, Malaysia.
Work Responsibilities;
• Preparation and evaluations of monthly Claim for Architectural, C&S and M&E works for 16 nos. of sub-labour contractors.
• Preparation and evaluations of mid-term cash advance for all sub-labour contractors.
• Taking of quantity of materials for all construction works as existing BQ cannot be used for sub-labour payments.
• Coordination and managing of sub-labour contractor area of works to avoid conflict of claims.
• Proposal of sub-labour rate to the managing directors.
• Make analysis and proven calculations of BQ construction materials for variation orders.
• Sabah Ammonia Urea (SAMUR) Project for Petronas Chemicals Fertiliser Sabah Sdn. Bhd. At Sipitang, Sabah, Malaysia. Consortium Company;
Mitsubishi Heavy Industries Ltd. (Japan), Apex Energy Sdn. Bhd.
(Malaysia), and Rekayasa Industries (REKIND) (Indonesia). Supply, Fabrication and Construction of Civil Works (Package 4)
(RM 24,000,000.00)
Scope of Project:
• Stationary equipment foundations.
• Machinery equipment foundations.
• Foundation for bulk urea storage house.
• Pipe rack foundations and R.C. structures work.
• Construction of ammonia storage tank foundation.
• Other foundations and R.C. structures.
• Brickworks and other architecture work for BUSH Building.
• Pits and Drainages system works.
Work Responsibilities;
• Overall site management and operations; Technical staffs, 3 8
Pembinaan Kekal Mewah Sdn.
Bhd. Malaysia.
Concessionaire Company for
Road, Road Kerb & Drain
Maintenance
Ultimate Reserves Group
Sabah, Malaysia.
• Contractor
• Developer
• Manufacturer
• Supplier
• Quarry Miner/Operator
Senior Engineer
Project
Executive /
Project Engineer
/ QA/QC
Engineer
August 2014 –
January 2015
December
2012 –
June 2014
general manpower, machineries, materials, methods, safety and logistics.
• Coordination and mitigations of third-party contractors’ interface.
• Attending and updating of all weekly meetings;
Coordination/Interface, QAQC, Management and Safety meetings.
• Solving technical issues, materials and proposals.
• Overall project control and planning.
• Miscellaneous paper works and reporting.
• Report to project manager and managing directors.
• Concession Company of Malaysia Government in state of Sabah in maintenance works for town infrastructure, particularly roads and drains.
Scope of Work & Responsibilities:
• Updating records in RMIS (road surveillance system software).
• Coordination and Planning for the in-house team works.
• Coordination and Planning of Sub contractor maintenance works.
• Preparation of sub-contractor works order.
• Preparation of sub-contractor works order claim.
• Investigating reported defects and damage.
• Preparation of engineering report and repair proposal for the defects.
• Liaising with local authority officials pertaining to maintenance
• Liaising and settling public complain.
• Attending, reporting and updating routine monthly meetings with local government officials (Roads & Infrastructures Department and Safety & Health Department)
• Reporting & feedback documentations for the headquarter.
• Miscellaneous paper works and reporting.
• Design, built and to complete 180 units 5 storey apartment and other services, infrastructure works and M&E works for Public Housing Program at Sandakan, Sabah, Malaysia.
(RM 30,290,000.00)
• Proposed upgrading road works Kota Kinabalu to Sandakan, Phase 2 of 8.1km length road. Sabah, Malaysia.
(RM 19, 900, 000.00).
• Proposed 20 units Shop lots construction, public services, infrastructures and Mechanical & Electrical works at Beluran Sandakan, Malaysia. (RM 20, 346, 982.00)
Scope of Project:
• Project Monitoring and assisting project manager.
• Preparations of monthly progress reports.
• Preparations of monthly QA/QC reports.
• Correspondents/coordination with Clients and Consultants.
• Correspondents with Sub-contractors.
• Preparation of monthly progress financial claims.
• Verification of monthly progress financial claims.
• Attending and updating info for meetings.
• Most of the technicality and paper works.
4 8
Sepakat Construction, Sabah,
Malaysia.
• Contractor
Puncak Deras Sdn. Bhd. Sabah,
Malaysia.
• Contractor & Developer
Syarikat Pembenaan Karun Sdn.
Bhd. Sabah, Malaysia.
• Contractor
Construction
Manager cum
Construction
Coordinator
under sub-labor
contract
Seconded to
Iklas Perunding
as a Resident
Engineer
C&S and
Architectural
Coordinator
February 2011
– May 2012
June 2012 –
November
May 2008 –
February 2011
July 2007 –
May 2008
• Construction works for the new public market at Lot 8002
(Partial) & 8008, Bunga Tanjung Road, Ujung Pasir, Federal Teritory of Labuan. (RM 30,548,230.00)
Scope of Work:
• Sub labor all substructure and superstructure work.
• Sub labor all architectural works.
• Sub labor all external works except roads.
• Dealing with main contractor on technical matters.
• Dealing with main contractor on pricing rate of work.
• Dealing with consultant on inspection of works.
• Responsible on pushing up the work to the main-contractor.
• Preparation of weekly and monthly work program.
• Preparation of monthly claimed.
• RENOVATION AND EXTENTION OF TWO STOREY RESIDENTIAL HOUSE AT TAMAN KINGFISHER KOTA KINABALU
Scope of Work:
• Sub labor all substructure and superstructure work.
• Sub labor all architectural works.
• Structure Designed from ground to top.
• Architectural designed and implementation.
• Responsibilities on purchasing materials.
• Dealing with client on technical and monetary matters.
• Preparation of weekly and monthly claimed.
• Preparation of Structural Drawing, Architectural, water system, sanitary plumbing and electrical drawing.
• Design, built and to complete 400 units 5 storey apartment and other services for Public Housing Program at Kunak, Sabah, Malaysia. (RM 28,038,888.00)
Scope of Project:
• Site Preparations and Earth Works.
• Substructures and Superstructures constructions supervision.
• Architectural Works supervision.
• Ancillary Buildings construction.
• External & Infrastructure Works included surface drainage, water reticulation and etc supervision.
• Mechanical & electrical Works supervision.
• Proposed construction and recompletion of Police Headquarters Lahad Datu, including 1-unit Class C residential, 8 units class D residential, 18 units class E residential, 172 units class F residential, other services, infrastructures work and mechanical and electrical works on Lot 11503465 Lahad Datu, Sabah, Malaysia. (RM 97,474,126.45)
Scope of Project:
• Demolition Works of Existing Buildings.
5 8
Syarikat Yet Hing Contractors
Sdn. Bhd., Sabah, Malaysia.
• Contractor
Site Engineer
and Asst. to
Project Engineer
November
2005 –
July 2007
• Site Preparations and Earth Works. Geotextile application and subsoil drainage included.
• Micropiling Works and Spun Piling Works for Buildings foundation, R.C. Square piling works for Retaining Wall.
• Retaining Wall Constructions.
• Substructures and Superstructures constructions.
• Architectural Works.
• Ancillary Buildings construction.
• External & Infrastructure Works included surface drainage, water reticulation and etc.
• Mechanical & electrical Works.
Work Responsibilities;
• Responsible in checking all drawing discrepancies that exist in between the C&S and Architectural Drawing.
• Responsible in reporting and solving all technical issues and discrepancies by means of dealing with the consultant in those particular matters.
• To make sure that the sub-cons will be updated to any changes in the drawing and that the works are done in according to the latest drawing.
• Assisting the surveyor in preparation for as-built drawing for the piling position.
• Assisting the surveyor and the site supervisors in any technical matters.
• Responsible in all rectification of deviated piling works by mean of proposing to the consultant on the modified pile caps / footings.
• Responsible in rectification and proposition works in all technical issue to the consultant.
• Also responsible in preparation of shop drawing for cold water and sanitary plumbing for submission to the consultant.
• Assisting the Project Manager in preparing the revised work program, monthly claimed and in preparation for monthly progress report.
• Proposed Construction of Oil Terminal at Sandakan Port
(RM 33,831,055.95)
Scope of Project:
• Offshore and Onshore piling work
• Construction of a piled steel and precast concrete approach bridge to existing oil jetty head, new Palm Oil Jetty berths and barge berth area.
• Construction of precast breasting, mooring and protection dolphins and installation of fenders and bollards.
• Construction of crude palm oil storage tank foundation works.
• Construction of access road and drainage system
• Construction of pipe support on-shore, supply, install and commission palm oil, petroleum and chemical pipelines.
• Construction of pipe support on the existing jetty, supply, install and commission petroleum and chemical pipelines.
• Installation of 150mm diameter mscl pipe from Jabatan Air water main to balancing tank of new oil jetty.
• Supply, install and commission 150kVA standby generator set. 6 8
House Research and
Development (Singapore)
Private Limited.
Cavite Eco-Zone,
Rosario Cavite, Philippines.
• Developer and pre-fab
House Manufacturer.
NLV Construction and
Development Corporation,
Zamboanga City, Philippines
Contractor and Developer
Project Engineer
Architectural
Draftsman and
Encoder
Site Engineer
and Materials
Estimator
March 2007 –
July 2007
June 2005 –
August 2005
May 2004 –
January 2005
• Proposed Construction of Pipe Support Bridge At Sandakan Oil Jetty (RM 2,594,470.89)
Scope of Project:
• Offshore piling work.
• Fabrication and installation of steel trusses.
• Erection of palm oil, petroleum and chemical pipelines.
• Installation of Pig Launcher System.
• Testing and commissioning of pipeline systems.
• Proposed New Spun Pile Protection Barrier at Sungai Mowtas Oil Jetty, Sandakan (RM 722,000.00)
Work Responsibilities;
• Offshore piling work, surveying and positioning piling points.
• Bracing Design for crosshead formwork.
• Fabrication and installation of precast concrete beams.
• Construction of Cast-in-situ crosshead box.
• Painting and Commissioning of work.
• Proposed Construction of Light Industrial Development (4 units 2- storey Detached and 14-units 2-storey Semi-Detached Light Industrial Building) On L. 20965, mile 7, labuk Road, Sandakan (RM 5,678,754.60)
Work Responsibilities;
• On-shore piling (r.c square pile) works for foundations.
• Substructures and Superstructures constructions.
• Materials control and Estimate.
• Mechanical and Electrical Installation.
• External works and Servicing; Roads, Car parks and Etc.
• Work inspection and supervision.
Scope of Work.
• Full-Time Architectural Draftsmen for the company pre-fabricated houses exported and assembled in Japan.
Constructions of 2 blocks of Dry Market Building and 1 Block of Wet Market Building at R.T. Lim Surabay. Ipil. Philippines. Work Responsibilities;
• Site preparation and earth works.
• Surveying works.
• Substructures and Superstructures Work.
• Architectural works supervision.
• Materials control; ordering and estimating.
• Mechanical and Electrical Installation.
• Work inspection and workers supervision.
• Weekly workers payroll.
• Paper works and reporting.
Responsibilities on dealing with the municipal engineers. 7 8
IV. EDUCATIONAL ATTAINMENT
BATCH
YEAR SCHOOL / INSTITUTE COURSE
NOV 1993 S.K. BANDAR SANDAKAN,SABAH Elementary Education NOV 1998 S.M.K. MUHIBBAH SANDAKAN,
SABAH.
Science Student,
SPM (Grade 1)
APRIL 2004 ZAMBOANGA A.E. COLLEGES
( UNIVERSIDAD DE ZAMBOANGA )
Bachelor of Science in Civil
Engineering
V. AWARDS AND HONORS RECEIVED
College
• Regional Champion on 2003 regional Philippines Institute of Civil Engineers (PICE), Student Quiz.
• Finalist of Region IX, in the 22nd National Civil Engineering Student Quiz (NCESQ) Grand finals.
Employment
• Certificate of Excellence for being the Most Promising Encoder in HRD (S) PTE. LTD. (Japan Based Company) 27th July 2005. VI. SEMINARS ATTENDED
Computer-Aided Analysis : Prof. Allan E. Milano
And Design of Structure MSU-IIT/ACECOMS
Prof. Ariston G. Trinidad
MSU-IIT/ACECOMS
(August 12-13, 2002)
Geotechnical Engineering : Engr. Venacio I. Besavilla Jr. Board Examination Subject Director BERC
(February 6, 2004)
V11. COMPUTER KNOWLEDGES AND SKILLS
• Microsoft office Project
• AutoCAD
• Microsoft office Word
• Microsoft office Excel
• Microsoft office Power Point
8 8
VIII. REFERRAL
• Mr. Ravi Venkataraman Monitor & Evaluation (M&E) World Bank Consultant
Contact no. +855********
• Mr. Khannarong Un Managing Director of Elevated Realty Co. Contact no. +855********
• Engr. Zulkifli Zampara Chairman of Milbina Sdn. Bhd. Contact no. 019-*******
• Ir. Sham Chee Kin Principal engineer of Sham Che Kin Engineering Firm Contact no. 019-***-****
• Engr. Syamsulrizal Mustapha Design Engineer for Perkasa Consulting Firm Contact no. 016-***-****
IX. EXPECTED SALARY
• USD 3,500.00 Monthly Basis (Net Salary) - Negotiable