CURRICULUM VITAE
Name : V.S. Hemakumar
Father’s Name : K.R.Subramanya Pillai
Address for Communication : D.No. 21-787/10
C.C.S Colony/Jayachandra Colony
Near Railway Gate
Murakambattu
Chittoor-517127
E-mail-id: *************@**********.***
Cell No.944*******
Marital Status : Married
Date of Birth : 07-06-1982
Religion : Hindu
Nationality : Indian
Languages Known : Tamil,Telugu,English & Hindi
Academic Proficiency:
S.No.
Name of the Course/Degree
Name of the School/Institution
Course Duration
Specialization
Percentage of Marks Obtained
1
X
B.S. Kannan Govt. High School, Chittoor
1996-97
Maths, Science, Social
73.2%
2
Intermediate (+1, +2)
Vidyarthi Residential Junior Colllege, Chittoor
1997-99
Maths, Physics and Chemistry
81.6%
3
B.Tech (Industrial & Production Engineering)
S.V. University, Tirupathi
1999-2003
Advanced Machine Tools, Production Systems, Computer Integrated Systems
53.39%
Project Work:
Did a project work on reducing of casting defects through TQM techniques in SIBAR AUTOPARTS LIMITED in Renigunta Road, Tirupathi in 2003.
Complete MBA in HR and marketing
Technical Proficiency:
Completed a Professional Cad Course on Autocad, Pro-E, Ansys and MS Projects
Completed typewriting in Higher grade
Work Experience:
Worked as a Cad Detailer in Venus Constructions, T. Nagar, Chennai for 6 months ( July 2003 to January 2004)
Worked as a Cad Engineer in a Pre-Engineering Building Construction Company, Metco Roof Private Limited in Pondicherry for one year (2005-2006).
Worked as a designer in Lloyd Insulations (India) Limited (Construction of PEB, Wall Panelling, False Ceiling and roofing work) in Nungambakkam for one year.
Job Responsibilities:
Designing and drawing the roofing, PEB detailing and false ceiling drawings and getting approval from the clients.
Coordinating with the Site Engineers for getting the details from the client.
Achievements:
Did a Project on roof sheeting work for SNC Power Corporation Limited
I Worked as a Cadd Engineer in HIAL, GMR International Airport Site in Hyderabad in preparing false ceiling drawings.
Worked in “Ramakrishna Engineering Company” as a designer for a period of two years six months.(Jan 2008 to June 2010)
My Responsibilities:
Preparing fabrication and tool drawings from the input drawings supplied by the clients(VSSC,DRDL,ASL,ADE,LPSC,HAL)
Preparing Process Sheets and Cutting Layouts
Designing of jigs and fixtures for the component parts
Cad tools used in our Company: Auto Cad 2008, Pro-E
Worked in Balmer Lawrie & Company as a Production Supervisor since from May 2010 to Febrauary 2022 in Chittoor.
Job Responsibilities:
Preparing the Production plan on weekly basis
Maintenance of the machines
Solving breakdown of the machines
Preparing ISO 9001-2008 and BIS documentation
Visiting to customer plants for solving their complaints.
Production entry, Quality clearance and breakdown timings and spares utilized during maintenance I am entering through SAP system.
Presently working:
Presently working in Stark containers pvt ltd as Quality Manager from Febrauary 2022 to till now.
Thanking You Sir,
Acknowledgement: I acknowledge that the statements made above are true to the best of my knowledge and belief. I also ensure that I will perform my duties to the extent to satisfy my superiors to do the needful.
Yours faithfully
V.S. Hemakumar