Mohsin Abbas Raza
Surveyor & supervisor
Post Office Jayya Tehsil & District Mandi Baha Uddin, Punjab, Pakistan. Cell No: +923**-*******,
Email. ***********@*****.***
OBJECTIVES:
To secure a position in an organization that would utilize my skills & expertise and where I can work for my carrier progression and organization growth. PERSONAL PROFILE:-
Father’s Name : Basheer Ahmad
Date of Birth : 3rd January, 1986
CNIC # : 34402-4362878-7
Marital Status : Married
Nationality : Pakistani
Religion : Islam
ACADEMIC QUALIFICATION:-
Matriculation in 2003 from Board of Gujranwala. Pakistan.
D.A.E in 2006 from Punjab Board of Technical Education Lahore. Pakistan.
PROFESSIONAL WORKING EXPERIENCE:-
Techno Consult International (Pvt.) Ltd. Unified Consultancy Services Duration; August 2022 to till date.
Client: Water & Power Development Authority (WAPDA) Consultant: Techno Consult International (Pvt.) Limited Contractor China Gansu International and Technical Cooperation co., Ltd.
& MEFA Industries (Pvt.) Limited
Employer: Techno Consult International (Pvt.) Limited Project: The Greater Karachi Bulk Water Supply Scheme K-IV Phase- 1 (260MGD)
Contract Package No. KIV-FP3
EA Consulting (Pvt.) Ltd.
( Formerly Engineering Associates )
Duration; May 2020 to May 2022
Client: Sindh Education Development Department
Consultant: EA Consultant (Pvt.) Limited
Contractor KAPEC Pvt. Ltd.
Employer: EA Consultant (Pvt.) Limited
Project: Comprehensive High School Bakhar Jamali Dist. Metiari EA Consulting (Pvt.) Ltd.
( Formerly Engineering Associates )
Duration; January 2017 to March 2020.
Client: Coal & Energy Development Department Sindh Coal Authority Consultant: EA Consultant (Pvt.) Limited
Contractor Pak Oasis Industries Pvt Ltd.
Employer: EA Consultant (Pvt.) Limited
Project: Construction of 50 Cusecs Drainage of Wastewater/Effluent Channel from Mining Area of Thar Coal Filed Unit .2 37Km GRP Pipe line.
Job Responsibilities:-
Setting out of Pipe Line, Leveling by gravity,
Layout of Structure & supervision.
Working as Senior Surveyor with Pak Oasis Industries (Pvt.) Ltd. Duties were assigned for the surveying setting out of Pipe line and Structure work
& all work’s Supervision.
Pak Oasis Industries (Pvt.) Ltd.
Duration; Feb 2015 to January 2017
Client: Coal & Energy Development Department Sindh Coal Authority Consultant: EA Consultant (Pvt.) Limited
Employer: Pak Oasis Industries Pvt Ltd.
Project: Construction of 50 Cusecs Drainage of Wastewater/Effluent Channel from Mining Area of Thar Coal Filed Unit .2 37Km GRP Pipe line.
Job Responsibilities:-
Setting out of Pipe Line, Leveling by gravity,
Layout of Structure & supervision.
Working as Chief Surveyor with Pak Oasis Industries (Pvt.) Ltd. Duties were assigned for the surveying setting out of Pipe line and Structure work
& all work’s Supervision.
PARAGON CONSTRUCTORS PVT LTD.
Duration; Aug 2014 to Feb 2015
Client: Bahria Town Karachi
Consultant: Bahria Town
Employer: Paragon Constructors Pvt Ltd.
Project: Bahria Homes 8 marlas
Job Responsibilities:-
Setting out, Layout & supervision
Working as Senior Surveyor with Paragon in Bahria Town Duties were assigned for the surveying setting out of road and Structure & All work’s Supervision.
FRONTIER WORK ORGANIZATION (FWO) 758 CTE
Duration; Oct 2012 to Aug 2014.
Client: CAA (Civil Aviation Authority)
Consultant: NESPAK (National Engineering Service Pakistan) Employer: FWO (Frontier Work Organization)
Project: NGIA (New Gwadar International Airport)
Job Responsibilities:-
Road, Security fence, culverts & watch towers
Working as Senior Surveyor with FWO in Gwadar
Duties were assigned for the surveying setting out of road and Structure & All work’s Supervision.
AFRICAN REAL ESTATE CO.
Duration; Nov 2011 to Aug 2012.
Client: EAC (East African Community)
Consultant: GBC
Employer: ARECO
Project: EAC HADQUARTER AUUSHA TANZANIA
Job Responsibilities:-
Road, Walkway, lawn,Car Parking’s, Sewerage line, Security room, Water Fountain’s & Sitting Area’s
Worked as Senior Surveyor with ARECO in Tanzania Duties were assigned for the surveying demarcation and layouts for the earth fill and land reclamation & all work’s Supervision
AISHA STEEL MILL
Duration: Jan 2011 TO Oct 2011
Client: Aisha Steel Mill (Pvt.) Limited
Consultant: A&A (Akbar & Associates
Contractor: Habib Rafiq (Pvt.) Ltd. & Paragon Constructors Employer: Aisha Steel Mill (Pvt) Ltd.
Project: Aisha Steel Mill Cold Rolling complex
Job Responsibilities:-
Construction of Machine Foundations e.g.
Cold Roll Skin Pass Mill
Pull Picking Line
Electrolytic Cleaning Line
Re-Coiling Line
Blast Annealing Furnace
Roll Grinder Line
Construction of Sub-Stations, Boiler Room, Mosque, Office Building, Canteen, Water Reservoir and Work Shop etc.
Construction of Pre-Engineered Building.
● Survey inspection of construction of machine foundations.
● Survey inspection of installation, levels, alignment of anchor bolts for machine/equipment pads.
JAWAD ENTERPRISES
Duration: July 2008 to Sep 2009
Client: Trans Asia Refinery Ltd
Consultant: E.C.I.L.
Worked as Surveyor with M/S Jawad Enterprises in Port Qasim.
Duties were assigned for the surveying demarcation and layouts for the earth fill and land reclamation.
NLC & FWO 756 CTE
Duration: December 2007 to June 2008
Client: D.H.A
Consultant: Usmani & Company (Pvt.) Ltd.
Worked with FWO as Surveyor for DHA Phase 8 in Karachi.
Duties were assigned for the surveying works of Asphalt Plant Foundation, NLC Pipe Sleeves, RCC drains & Pipe drains.
MAZYOOD GIGA INTERNATIONAL CONSTRUCTION
COMPANY
Duration: April 2006 to December 2007
Client: AMMAR Standard International
Consultant: Halcrow Pakistan Limited.
Worked as Surveyor with Mazyood Giga International Construction Company at Karachi for the Water Front Development Project in DHA Phase 8.
Duties were assigned for the surveying works of Work Wall, Edging and Reclamation.
INSTRUMENTS USED:-
● Level Instruments of all types
● Total Station:
Sokkia (630 KR- 650KR-620K-510K)
Top-Con
South
Nikon (362)
Pentax Power Set
Computer skills
Auto Cad
Excel:
REFERENCES:-
Will be furnished upon request.