Post Job Free
Sign in

Surveying & Construction

Location:
Karachi, Sindh, Pakistan
Salary:
$100k per year
Posted:
August 15, 2023

Contact this candidate

Resume:

Mohsin Abbas Raza

Surveyor & supervisor

Post Office Jayya Tehsil & District Mandi Baha Uddin, Punjab, Pakistan. Cell No: +923**-*******,

Email. ***********@*****.***

OBJECTIVES:

To secure a position in an organization that would utilize my skills & expertise and where I can work for my carrier progression and organization growth. PERSONAL PROFILE:-

Father’s Name : Basheer Ahmad

Date of Birth : 3rd January, 1986

CNIC # : 34402-4362878-7

Marital Status : Married

Nationality : Pakistani

Religion : Islam

ACADEMIC QUALIFICATION:-

Matriculation in 2003 from Board of Gujranwala. Pakistan.

D.A.E in 2006 from Punjab Board of Technical Education Lahore. Pakistan.

PROFESSIONAL WORKING EXPERIENCE:-

Techno Consult International (Pvt.) Ltd. Unified Consultancy Services Duration; August 2022 to till date.

Client: Water & Power Development Authority (WAPDA) Consultant: Techno Consult International (Pvt.) Limited Contractor China Gansu International and Technical Cooperation co., Ltd.

& MEFA Industries (Pvt.) Limited

Employer: Techno Consult International (Pvt.) Limited Project: The Greater Karachi Bulk Water Supply Scheme K-IV Phase- 1 (260MGD)

Contract Package No. KIV-FP3

EA Consulting (Pvt.) Ltd.

( Formerly Engineering Associates )

Duration; May 2020 to May 2022

Client: Sindh Education Development Department

Consultant: EA Consultant (Pvt.) Limited

Contractor KAPEC Pvt. Ltd.

Employer: EA Consultant (Pvt.) Limited

Project: Comprehensive High School Bakhar Jamali Dist. Metiari EA Consulting (Pvt.) Ltd.

( Formerly Engineering Associates )

Duration; January 2017 to March 2020.

Client: Coal & Energy Development Department Sindh Coal Authority Consultant: EA Consultant (Pvt.) Limited

Contractor Pak Oasis Industries Pvt Ltd.

Employer: EA Consultant (Pvt.) Limited

Project: Construction of 50 Cusecs Drainage of Wastewater/Effluent Channel from Mining Area of Thar Coal Filed Unit .2 37Km GRP Pipe line.

Job Responsibilities:-

Setting out of Pipe Line, Leveling by gravity,

Layout of Structure & supervision.

Working as Senior Surveyor with Pak Oasis Industries (Pvt.) Ltd. Duties were assigned for the surveying setting out of Pipe line and Structure work

& all work’s Supervision.

Pak Oasis Industries (Pvt.) Ltd.

Duration; Feb 2015 to January 2017

Client: Coal & Energy Development Department Sindh Coal Authority Consultant: EA Consultant (Pvt.) Limited

Employer: Pak Oasis Industries Pvt Ltd.

Project: Construction of 50 Cusecs Drainage of Wastewater/Effluent Channel from Mining Area of Thar Coal Filed Unit .2 37Km GRP Pipe line.

Job Responsibilities:-

Setting out of Pipe Line, Leveling by gravity,

Layout of Structure & supervision.

Working as Chief Surveyor with Pak Oasis Industries (Pvt.) Ltd. Duties were assigned for the surveying setting out of Pipe line and Structure work

& all work’s Supervision.

PARAGON CONSTRUCTORS PVT LTD.

Duration; Aug 2014 to Feb 2015

Client: Bahria Town Karachi

Consultant: Bahria Town

Employer: Paragon Constructors Pvt Ltd.

Project: Bahria Homes 8 marlas

Job Responsibilities:-

Setting out, Layout & supervision

Working as Senior Surveyor with Paragon in Bahria Town Duties were assigned for the surveying setting out of road and Structure & All work’s Supervision.

FRONTIER WORK ORGANIZATION (FWO) 758 CTE

Duration; Oct 2012 to Aug 2014.

Client: CAA (Civil Aviation Authority)

Consultant: NESPAK (National Engineering Service Pakistan) Employer: FWO (Frontier Work Organization)

Project: NGIA (New Gwadar International Airport)

Job Responsibilities:-

Road, Security fence, culverts & watch towers

Working as Senior Surveyor with FWO in Gwadar

Duties were assigned for the surveying setting out of road and Structure & All work’s Supervision.

AFRICAN REAL ESTATE CO.

Duration; Nov 2011 to Aug 2012.

Client: EAC (East African Community)

Consultant: GBC

Employer: ARECO

Project: EAC HADQUARTER AUUSHA TANZANIA

Job Responsibilities:-

Road, Walkway, lawn,Car Parking’s, Sewerage line, Security room, Water Fountain’s & Sitting Area’s

Worked as Senior Surveyor with ARECO in Tanzania Duties were assigned for the surveying demarcation and layouts for the earth fill and land reclamation & all work’s Supervision

AISHA STEEL MILL

Duration: Jan 2011 TO Oct 2011

Client: Aisha Steel Mill (Pvt.) Limited

Consultant: A&A (Akbar & Associates

Contractor: Habib Rafiq (Pvt.) Ltd. & Paragon Constructors Employer: Aisha Steel Mill (Pvt) Ltd.

Project: Aisha Steel Mill Cold Rolling complex

Job Responsibilities:-

Construction of Machine Foundations e.g.

Cold Roll Skin Pass Mill

Pull Picking Line

Electrolytic Cleaning Line

Re-Coiling Line

Blast Annealing Furnace

Roll Grinder Line

Construction of Sub-Stations, Boiler Room, Mosque, Office Building, Canteen, Water Reservoir and Work Shop etc.

Construction of Pre-Engineered Building.

● Survey inspection of construction of machine foundations.

● Survey inspection of installation, levels, alignment of anchor bolts for machine/equipment pads.

JAWAD ENTERPRISES

Duration: July 2008 to Sep 2009

Client: Trans Asia Refinery Ltd

Consultant: E.C.I.L.

Worked as Surveyor with M/S Jawad Enterprises in Port Qasim.

Duties were assigned for the surveying demarcation and layouts for the earth fill and land reclamation.

NLC & FWO 756 CTE

Duration: December 2007 to June 2008

Client: D.H.A

Consultant: Usmani & Company (Pvt.) Ltd.

Worked with FWO as Surveyor for DHA Phase 8 in Karachi.

Duties were assigned for the surveying works of Asphalt Plant Foundation, NLC Pipe Sleeves, RCC drains & Pipe drains.

MAZYOOD GIGA INTERNATIONAL CONSTRUCTION

COMPANY

Duration: April 2006 to December 2007

Client: AMMAR Standard International

Consultant: Halcrow Pakistan Limited.

Worked as Surveyor with Mazyood Giga International Construction Company at Karachi for the Water Front Development Project in DHA Phase 8.

Duties were assigned for the surveying works of Work Wall, Edging and Reclamation.

INSTRUMENTS USED:-

● Level Instruments of all types

● Total Station:

Sokkia (630 KR- 650KR-620K-510K)

Top-Con

South

Nikon (362)

Pentax Power Set

Computer skills

Auto Cad

Excel:

REFERENCES:-

Will be furnished upon request.



Contact this candidate