Wahiduzzaman

MSc(Engr), PhD (Engr)

Email: adyydc@r.postjobfree.com T: +44(0)781-***-****

Wahiduzzaman has more than 25 years’ experience in various field of water sector such as flood risk assessment, sustainable drainage system design, urban drainage feasibility study etc. He has extensive experience in design of filter drain, positive drain, sokaway, sediment pond, gully, road drainage, outfall, open channel, culvert etc using microdrainage software Windes. He has also experience in hydrology, hydraulics, hydraulic modelling, flood management, irrigation improvement, project management, finance management, morphology, sedimentology, hydraulic model review etc

During his career, Wahid has worked as senior urban/roads & highways drainage design engineer, project manager, Senior hydraulic engineer, senior hydrologist, hydraulic consultant, morphologist, senior hydraulic modeler etc Wahid worked as Senior Drainage Engineer in prestigious projects such as HS2 (High Speed Rail), Eurotunnel-Donallds Moor Cargo Turminal upgradation in the UK.

Wahid is worked as a International Urban Drainage Expert (senior drainage engineer) in the feasibility studies of a governance infrastructure improvement project in Bangladesh. On this project he was the team leader for a group of three engineers and his main activities were hydrological analysis, hydraulic modelling, reviewing/checking hydraulic design of canal, culverts, report writing, flood risk assessment. Wahid has also worked for five years as a senior hydraulic engineer/hydraulic modeler at Jacobs Engineering (UK) Ltd in UK. His key responsibility was to lead teams in developing and studying a number of drainage and civil engineering projects and drainage feasibility studies, including hydraulic models for FRA; project management; report writing; and proposal writing. He was also involved in urban drainage feasibility studies and drainage data collection. During that time, he identified possible drainage paths and gave recommendations for drainage strategies and developed 1D and 2D models for Floo Risk Assessment and for a sustainable urban drainage system. Wahid was employed for five years as Technical Officer(Senior hydrologist/hydraulic engineer/advisor/project manager) in the hydrology and flood forecasting team in the Environment Agency in UK. His key responsibilities were evaluating tender document and proposals coming from external consultants; mandate and statement of requirements preparations for the projects; project management; finance management; site visits; coaching and mentoring other staff; developing 1D and 2D models for FRA projects and drainage feasibility studies; organising in- house training on mathematical modelling; hydrology analysis; report writing; liaison with other organisations and attending meetings. He was in charge of reviews of the hydraulic design for culverts, weir, hydraulic gates, canals etc. in respect of catchment hydrologyand hydraulic condition and comparison with the existing design standard. He was in charge of the data collection for the existing urban drainage system and analyses; recommendations for drainage feasibility studies for sustainable urban drainage system; and involved in the development of the drainage systems strategy.

Wahid worked for more than 15 years as a senior/lead hydrologist/hydraulic engineer/consultant on various projects which involved flood control,irrigation and drainage improvement in Bangladesh, financed by World Bank, UNDP, ADB, and JICA. On these projects his key responsibilities were drainage system design, hydrological and hydraulic analysis; Flood Risk Assessment; project management; tender documents and proposal evaluation; option studies; report writing; drainage improvement studies; and liaison with other organization like the Bangladesh Water Development Board (BWDB), Local Government Engineering Department (LGED), NGO’s, etc. He has also extensive experience in the use of drainage/flood modelling software like Mike11, ISIS, Estry, Tuflow, Hec-Ras, WINFAP-FEH,GIS, MapInfo, WinDes (Microdrainage Drainge). He has received professional training on hydraulic modelling and has published 23 technical papers in various journals and International conference proceedings

Wahid has good knowledge in PPS25, Flood & Water management Act 2010- section 19 (investigation of flooding), Land drainage act 1991, Design manual for Road & Bridge (DMRB), guideline of Sustaianble Urban Draiange system

(SuDS), knowledge in Highways Act 1980-section 38 & section 278 agreements etc. Wahiduzzaman Page 2

At present Wahiduzzaman is working as Principal Civil Draiange Design Engineer in Lanes Group Plc in Uk. His key responsibilities are design railway track and land drainage system, Review Land & Track darnage design system, supervise design engineering staff, coordinate deign & construction group, Leisaion with other organizations like Local Councial Authority, Drainage board, Highways Authority etc.. Name Wahiduzzaman

Nationality British and Bangladeshi (Dual citizen) Date of Birth 1 March 1955

Membership of Professional Associations Member: British Hydrological Society Fellow (Life):Institution of Engineers, Bangladesh Member: American Society of Civil Engineers

Professional Training -Construction Skills Certification Scheme (CSCS),2017,UK

-Environmental Impact Assessment (EIA) at Asian Institute of Technology, Bangkok, Thailand

-Hydraulic modelling, Danish Hydraulic Institute (DHI), Denmark

Countries of Work Experience Bangladesh, UK, Russia, Japan, Egypt, India, Kuwait, Mozambique

Current Employment Dates November 2022 to-date

Employer Lanes Group Plc, UK

Position Held Principal Civil Drainage Design Engineer Employment Record (continued)

Dates November 2020 to November 2022

Employer Eiffage Kier Ferrovial BAM JV, UK

Position Held Design Coordinator

Dates Ocober 2019 to March 2020

Employer Fluor Limited, UK

Position Held Senior/Lead Drainage Engineer

Dates May 2016 to September 2019

Employer Rendel Ltd UK

Position Held Senior Drainage Engineer

Dates 2009 to 2016

Employer: Environment Agency (UK)

Position Held Senior Hydrologist/Hydraulic Engineer Dates 2005 to 2009

Employer: Jacobs Engineering Ltd, UK

Position Held Senior Hydraulic Modeller

Dates 1994 to 2005

Employer Institute of Water Modelling, Dhaka,

Bangladesh

Position Held Senior Specialist/Project Leader/TeamLeader Dates 1990 to 1994

Employer Institute of Water Modelling, Dhaka,

Bangladesh

Position Held Consultant

Dates 1985 to 1990

Employer SWSMP, Phase II,

Danish Hydraulic Institute, Dhaka, Bangladesh

Position Held Engineer

Dates 1981 to 1985

Employer Moscow Hydraulic Institute

Position Held Engineer

Education

Name of College/University

Moscow Hydro Land Reclamation Institute

Dates attended

1976 to 1981

Degree obtained

MSc (Engr)

Moscow Hydro Land Reclamation Institute 1981 to 1985 PhD (Engr. Hydraulic Structure) Languages Speaking Reading Writing

Excellent Good Fair Excellent Good Fair Excellent Good Fair English

Russian

Bangla(native))

Fields of Expertise

Hydrology and hydraulic study Urban & Road Drainage study and design Hydraulic Modelling Project Management

Wahiduzzaman Page 3

Hydraulic Design Review Flood Risk Assessment

Selected Project Experience

Name of Assignment Various Railway Drainage Improvement Project Year 2022- Todate

Location UK

Client Natwork Rail

CAPEX N/A

Main Project Features Improvement of railway track and land drainage system Position Held Principal Civil Drainage Design Engineer Activities Performing Design land & track drainage system, review existing drainage design, option study for improvement of railway drainage system, design of filter drain, infiltration pond, sawle etc. design review, liaison with lovcal authority, steakholdesr etc. Name of Assignment HS2 (High Speed) Rail project

Year 2020- 2022

Location UK

Client HS2 authority

CAPEX N/A

Main Project Features UK government backed scheme to construct a new rail rute-a scound high-speed railway project. This involves 80km section runs between the Chilterns to Warwickshire and includes 15 viaducts, 5km of green tunnels, 22km of road diversions, 67 overbridges and 30 million cubic metres of excavation. Position Held Drainage Design Coordinator

Activities Performing Review Road, land & track drainage system design, flood modelling report review, design of filter drain, infiltration pond, sawle etc. design review, liaison with lovcal authority, steakholdesr etc.

Name of Assignment Development of LNG Project, Mozambique Year 2019- 2020

Location Rovuma, Mozambique

Client Ministry of Oil & Gas, Mozambique

CAPEX N/A

Main Project Features Construction of Liquified Natural Gas Plant Position Held Senior/Lead Drainage Engineer

Activities Performing Storm Water Drainage System Design, Hydrolgical Analysis,Surface Water Draiange System Design using Windes Model, Bill of Quantities (BoQ) preparation, Manhole Schedule preparation, Report writing, Design of Sedimentation pond, filter drain, positive drain, soakaway, storage pond, earthen canal, outfall etc. Name of Assignment Development of Container Terminal AIPT-2, Yangon, Myanmar Year 2019

Location Yangon, Myanmar

Client Adani Yangon International Terminal Company Ltd CAPEX N/A

Main Project Features Surface Water Draiange System Design Position held Senior Drainage Engineer

Activities Performed Hydrolgical Analysis,Surface Water Draiange System Design using Windes Model, Bill of Quantities (BoQ) preparation, Manhole Schedule preparation, Report writing, design of positive drain, oil separator, outfall etc.

Name of Assignment Dollands Moor Cargo Terminal-Rolling Motorway Upgrade -Eurotunnel Year 2019

Location UK

Client Eurotunnel Authority

CAPEX N/A

Main Project Features Capacity upgradation of Dollands Moor Cargo Terminal Wahiduzzaman Page 4

Position held Senior Drainage Engineer

Activities Performed As buit data analysis, design for surface water drainage system using Windes&Gatic software, Bill of Quantities (BoQ) preparation, Manhole Schedule preparation, Report writing, design of positive drain, road gully, oil separator etc. Name of Assignment Anaklia Deep Water Black Sea Port Project Year 2019

Location Georgia

Client Port Authority

CAPEX N/A

Main Project Features Container platform extension Position held Drainage Engineer

Activities Performed Report writing, hydrology study, Surface Water Drainage system Design, Manhole Schedule preparation, design of positive drain, oil separator, gully etc using windes microdrainage software

Name of Assignment HS2 (High Speed Rail)

Year 2017 – 20180017-

Location UK

Client ALIGN JV of Bouygues Construction, Sir Robert McAlipine, and Volker Fitzpartick LIGN CAPEX Not Applicable

Main Project Features UK government backed scheme to construct a new rail rute-a scound high-speed railway project. The project involves the construction of 160km of rail tracks using twin- bored tunnels and green tunnels, viaducts and engineering earth works to achieve a technically environmentally sensitive solution

Position held Hydraulic Study Reviewer & Drainage Engineer Activities Performed Reviewing flood Risk Assessment & Hydraulic Modelling study done by other consultant, Design of filter drain, positive drain, soawakay, pond etc. using Windes software (microdrainage )

Name of Assignment Abidjan Port Second Container Terminal Project Year 2018

Location Abidjan, Africa

Client Abidjan Port Authority

CAPEX N/A

Main Project Features Container platform extension, Drainage system development Position held Senior Drainage Engineer

Activities Performed Surface Water Drainage Design using Wendes&Gatic software, hydrology analysis, report writing, design of positive drain, oil separator etc. Name of Assignment Development of Green field Airport at Hirasar, Rajkot, India Year 2018

Location India

Client Infinite Civil Solution, India LIGN

CAPEX Not Applicable

Main Project Features Expansion of existing airport Position held Drainage Engineer

Activities Performed Hydrology & hydraulics analysis, Prelimenary design for drainage canal & culvert, preparation of Bill of Quantities, report writing

Name of Assignment Petrochemical Refinery Integration Al Zour Project Year 2018

Location Kuwait

Client Kuwait Integrated Petroleum Industries Company (KIPIC) CAPEX Not Applicable

Main Project Features Design of quay wall, paving and drainsage, dredging, reclamation and slope protection etc.

Position held Drainage Engineer

Activities Performed Hydrology analysis, drainage network design, preparation of Bill of Quantities, development of drainage model using WinDes software, positive drain, oil separator etc design

Activities Assignment Blackfriars Gas Main under District Line Wahiduzzaman Page 5

Year 2017

Location London, UK

CAPEX Not Applicable

Main Project Features The purpose of this project is to define the basis for design to meet the required goals of diverting the LP and MP gas mains from the Victoria Embankment service subway, under the A3211 and the District and Circle London Underground Line

(LUL), to connect into future buried gas mains located at Temple Avenue Position Held Utility Services Engineer

Activities Performed Design diversion of utility services such as water main, electric, telephone, fibre optics calbles etc. temporarily during construction period. Name of Assignment Dredging and Reclamation of Port of Sokhna (Container Terminal Basin-2) Year 2017

Location Egypt

Client DP World Sokhna, Egypt

CAPEX Not Available

Main Project Features Dredging&, Reclamation of the port Position Held Drainage Expert

Activities Performed Hydrology & hydraulics analysis, Preparation of Bill of Quantities, development of drainage model using WinDes (microdrainage) and Gatic software, detrmined size of drainage pipes, oil separator design etc.

Name of Assignment City Governance Infrastructure Improvement Project Year 2016 – 2017

Location Various cities, Bangladesh

Client Local Government Engineering Department (LGED), Bangladesh CAPEX Not available

Main project features Japan International Cooperation Agency (JICA)-funded Governance and Infrastructure Improvement Project as a part of the City Governance Project to address the growth of the population and provide adequate urban infrastructure in five large cities in Bangladesh – Chittagong, Rangpur, Narayanganj, Comilla and Gazipur. Rendel’s highways, drainage, bridge and urban planning experts are working in the feasibility study and master plan review sub-team as well as in the design, supervision and monitoring sub-team to lead the feasibility and detailed designs and coordinate teams of national engineers.

Position held International Drainage Expert

Activities performed

Drainage improvement feasibility studies; hydrology analysis; reviewing/checking hydraulic design of major canals and related infrastructure, including culverts, crossing bridges etc.in urban environment; computer modelling for option and existing canal systems and drainage network and their improvements, provided reports and modelling outputs

Name of Assignment Newbury Flood Risk Assessment and Drainage Study Project Year 2015-2016

Location UK

Client Environment Agency

CAPEX Not Applicable

Main project features Flood risk assessment, drainage improvement Position held Project Manager/Team Leader/Senior Hydraulic Engineer Activities performed Review and analysis existing river and drainage network for entire study area submitted by consultant ; identifying any bottle neck in the network; studying options for a better flood drainage system in the study area; hydrology and hydraulic data collection; conducting survey for drainage route;and a cross-section survey for the river network, etc. investigation fo flooding under Flood & Water management Act 2010- section 19.

Name of Assignment Haydon Wick Brook Flood Alleviation and Drainage Scheme Study Year 2014 – 2015

Location UK

Client Environment Agency

CAPEX Not available

Wahiduzzaman Page 6

Main project features Flood risk assessment

Position held Project Manager

Activities performed Review data collection for existing flood and drainage systems;review option for drainage system improvement studied by consultant;review hydrology analysisand hydraulic data collection. investigation fo flooding under Flood & Water management Act 2010-section 19.

Name of Assignment Impact of Culvert Blockage in Drainage System in North East Thames Region Year 2012-2014

Location Reading, UK

Client Environment Agency

CAPEX Not available

Main project features Culvert/bridge hydrology, hydraulics and Drainage improvement study Position held Project Manager/Team Leader/Senior Hydrologist Activities performed

Review collection of existing all culverts dimensions and compare with standard manual; conducting a cross-section survey of all drainage routes for evaluating existing capability of drainage system; hydrometric and hydraulic data collection; review of the existing drainage path; identification of drainage congestion in existing drainage system;hydrology analysis; recommendationsfor updating the drainage system; project management;and report writing.

Name of Assignment Blacks Brook Flood Risk and Drainage Mapping Study Project Year 2011-2012

Location UK

Client Environment Agency

CAPEX Not available

Main project features Flood risk assessment and flood mapping Position held Project Manager

Activities performed Review hydrometric and hydraulic data collection; survey for identifying drainage route; review of the existing drainage path; identification of defects of existing drainage system; recommendations for updating drainage system; hydraulic and hydrological analysis; hydraulic modelling; project management; and report writing. Name of Assignment New Bottly Road Flood Risk and Drainage System Study Year 2010-2011

Location UK

Client Environment Agency

CAPEX Not available

Main project features Catchment Hydrology, hydraulics & Drainage improvement study Position held Project Manager

Activities performed Review of the existing drainage path; identification of defects of existing drainage system; recommendations for updating drainage system; hydraulic and hydrology analysis; hydraulic modelling; project management; and report writing. Name of Assignment Stansted Brook Flood Alleviation and Drainage Scheme Study Year 2008-2010

Location UK

Client Environment Agency

CAPEX Not available

Main project features Flood risk assessment study

Position held Project Manager

Activities performed Review hydraulic analysis; hydraulic modelling;project and flood risk assessment; review of the hydraulic design for culverts, road drains, weir and canal in respect of hydrological design events and compare with standard design manual; existing drainage system data collection and analysis;supervision of site survey data collection; and development of drainage system strategy.

Name of Assignment Lincoln Eastern Bypass Road Flood Risk and Drainage Study project Year 2008-2009

Location Reading, UK

Wahiduzzaman Page 7

Client Environment Agency

CAPEX N/A

Main project features Hydrology, Flood risk assessment study Position held Senior Hydraulic Engineer (Modeller) Activities performed Existing hydrometric and hydraulic data collection; identification of the drainage path; topographic survey; catchment delineation; development of the drainage system strategy for sustainable urban drainage;hydrology analysis and hydraulic modelling; and report writing.

Name of Assignment Neath Port Talbot Flood Alleviation and Drainage Scheme Study Year 2006-2008

Location Talbot, UK

Client Environment Agency

CAPEX Not available

Main project features Flood risk assessment

Position held Senior Hydraulic Engineer

Activities performed Review and the data collection for the existing drainage system; identification of a bottle neck of the existing drainage systems; supervision of the drainage survey data collection; review of a master plan for urban drainage system for the Port Talbot city area;identification of a sustainable drainage system for the Neath Port Talbot city; hydraulic modelling; and hydrological data analysis for model boundaries. Name of Assignment Koirdhala-Ratna Flood Control & Inner Road Drainage and Irrigation Project Year 2003-2005

Location Bangladesh

Client Bangladesh Water Development Board

CAPEX N/A

Main project features Culvert hydrology/hydraulics, irrigation & Drainage improvement study Position held Project Manager

Activities performed Conduct cross-section survey for river system; option study; hydraulic modelling;hydrological data analysis for model boundaries; project management; liaison with other organizations;review hydraulic design of culvert, canal and report writing.

Name of Assignment Chitra River Development andTorki-Gournadi Flood Control Drainage and Irrigation Project

Year 2002-2003

Location Bangladesh

Client Bangladesh Water Development Board

CAPEX N/A

Main project features Flood control and drainage improvement study Position held Project Manager

Activities performed Conduct cross-section survey for river system; existing drainage data collection; option study;involved in culvert and canal design reviewing/checking; project management;hydrological data collection and analysis for design event; hydraulic and hydrology modelling; liaison with other organizations;and report writing. Name of Assignment Study on Environmental Degradation of the World Largest Mangrove Forest Year 2002

Location Coastal area, Bangladesh

Client Civil Engineering Department, Tohoku University, Japan CAPEX Not available

Main project features Sedimentation and salinity study Position held Research Associate

Activities performed Studied impact of salinity on sedimentation processes of the river system; hydraulic and hydrological analysis; and report writing

Name of Assignment Daker Haor Flood Control & Inner Road Drainage Improvement Project Year 2001-2002

Location Bangladesh

Client Bangladesh Water Development Board

Wahiduzzaman Page 8

CAPEX N/A

Main project features Culvert/Bridge hydrology, catchment hydrology and Flood management study Position held Project Manager

Activities performed Conduct survey work for cross-section and embankment; site visits; conducting meetings with stakeholders; existing hydrometric and hydraulic data collection; hydraulic and hydrology modelling;hydrology analysis; option study for drainage improvement; project management; liaison with other organizations;and report writing.

Name of Assignment Jadukata-Rakti River Drainage Improvement Project Year 1999-2001

Location Bangladesh

Client Bangladesh Water Development Board

CAPEX N/A

Main project features Drainage system improvement

Position held Project Leader

Activities performed Conduct survey work for cross-section and drainage data collection; collection and analysis of the existing hydrological and hydraulic data; hydraulic modelling; option study for drainage improvement; project management; liaison with other organizations; reviewing canal, culvert design done by other consultantand report writing Name of Assignment Mrigi River Drainage Improvement Study Year 1998-1999

Location Bangladesh

Client Bangladesh Water Development Board

CAPEX N/A

Main project features Flood control and drainage improvement Position held Project Manager

Activities performed Supervision of the drainage survey data collection; collection of the existing hydrometric and drainage system data; hydraulic modelling and hydrology analysis; option study for drainage improvement; participate on reviewing canal design; project management; liaison with other organizations;and report writing. Name of Assignment Surma Right Bank Road cum Flood Control and Irrigation Project Year 1997-1998

Location Bangladesh

Client Bangladesh Water Development Board

CAPEX N/A

Main project features Culvrt/bridge hydrology, hydraulics, Flood control, irrigation and drainage improvement Position held Project Manager

Activities performed Supervision of the drainage survey data collection; collection of the existing hydrometric and drainage system data; hydraulic modelling and hydrology analysis; option study;checking canal design; project management; liaison with other organizations;and report writing.

Name of Assignment Tarail Pachuria Flood Control &, Inner Road Drainage Improvement Project Year 1995-1997

Location Bangladesh

Client Bangladesh Water Development Board

CAPEX N/A

Main project features Catchment hydrology, culvert/bridge hydrology study and drainage improvement Position held Project Manager

Activities performed Review of canal design for drainage improvement projects; identification drainage path; advice on sustainable urban drainage system option study; modelling for option study; project management; hydraulic analysis; sediment transport analysis; morphology analysis; training other staff; supervision of drainage survey data collection; hydrometric and hydrological data collection and analysis; existing drainage system data collection; hydrology analysis; liaison with local authorities; and report writing Name of Assignment Surface Water Simulation Modelling Programme Phase 2-3 Year 1990-1995

Wahiduzzaman Page 9

Location Bangladesh

Client Ministry of Water Resources, Bangladesh

CAPEX N/A

Main project features Study present situation of major river netwok in Bangladesh Position held Consultant

Activities performed Identification of the present hydraulic condition of the major river systems of Bangladesh such as Jamuna, Brahmaputra, Padma, Meghna, Pussur, Sibsa, etc. Development of the inventory of river systems based on flow and change of morphology. Recommendations to improve/maintain river systems for irrigation and flood control with hydraulic modelling. Conducting a survey for the cross-section measurement; hydrometric and hydraulic data collection; hydrological, hydraulic and sediment transport data analysis; hydraulic modelling; existing drainage system analysis; training to other staff; report writing;and project management. Name of Assignment Surface Water Simulation Modelling Programme Phase 1-2 Year 1985-1990

Location Bangladesh

Client Ministry of Water Resources, Bangladesh

CAPEX N/A

Main project features Study present situation of major river netwok in Bangladesh Position held Consultant

Activities performed Data collection, hydraulic analysis, hydraulic modelling and cross-section survey. Name of Assignment Hydraulic and Morphological Investigation for the River Syr Darya for Environmental Protection and Sustainable Management in the Syr Darya River Basin in Kazakhstan, Uzbekistan

Year 1983-1984

Location Moscow, Russia

Client Moscow Hydraulic Engineering and Land Reclamation Institute CAPEX Not available

Main project features Hydraulic and hydrological data analysis Position held Engineer (part time)

Activities performed Hydraulic analysis, hydrological analysis and sediment budgeting. Name of Assignment Hydraulic/Hydrological Analysis of Various River systems in USSR (Russia): Amudaria River Improvement Project

Year 1981-1983

Location Moscow, Russia

Client Moscow Hydraulic Engineering and Land Reclamation Institute CAPEX Not available

Main project features Hydraulic data analysis

Position held Engineer (part time)

Activities performed Hydrolohy,Hydraulic data analysis, river cross section analysis and sediment budgeting. TECHNICAL PAPERS

Wahiduzzaman

Generation of Rainfall Intensity-Duration-Frequency Relotionship for Rangpur City Corporation in Bangladesh International Journal of Advance Engineering and Research Development (IJAERD), Vol 5, Issue 3, March 2018, India Md. Khaled Akthar, Md. Amirul Hossain, Dr Wahiduzzaman Use of Mathematical Model for Water Resources Planning" Proceedings of 5th International Research & Development Conference, 15-18 February 2005, Bangalore, India. Chowdhury Aminul Karim, W J Collis, Dr Wahiduzzaman Study on wetlands sedimentation process: A case study of Hail Haor, Sreemongal, Bangladesh", Proceedings of the 3rd Annual Paper Meet and International Conference of Civil Engineering (ISBN ***-**-****-4), 09-11 March 2005, Dhaka, Bangladesh

Dr Wahiduzzaman, Md. SohelMasud

Study on salinity Intrusion Process of the River Systems of the Coastal Region (South West region) of Bangladesh by developing a mathematical model" presented at 7th International River symposium 2004, Brisbane, Australia (31st Aug - 3rd Sept, 2004). T Umeki, A Mano, Y Ishibashi, Dr Wahiduzzaman

Flow movement and contaminant transport of groundwater in Southern Bangladesh" Environmental Hydraulics and Sustainable water Management-Edited by J H W Lee & K M Lam, Vol 1, @ 2005 Taylor & Francis Group, ISBN 04 1536 5465, Wahiduzzaman Page 10

London, UK.

Wahiduzzaman& Md. Nazrul Islam

Evaluation for formulae as a tool for computing sediment transport rate of the Pussur river, Bangladesh", Bangladesh Geoscience Journal, Vol 9 Department of Geological Sciences, Jahangirnagar University, Saver, Dhaka, Bangladesh, 2003. Wahiduzzaman, Abu Saleh Khan, Faruq Ahmed Mohiuddin, Kazi Emran Bashar Use of Mathematical Model as a tool for mitigation of Flood: Case Study Surma River in Bangladesh" Sixth International River Management Symposium, 2nd - 5th September 2003, Brisbane, Australia. Dr Wahiduzzaman

Use of Mathematical Model as a tool for improvement of drainage congestion of a river system: case study Mrigi River drainage improvement project in Bangladesh” Proceedings XXX IAHR Congress, Thessaloniki, 24th - 29th August 2003, Greece, pp 343- 348.

Faruq Ahmed Mohiuddin, Dr Wahiduzzaman

Optimising the Planning and Engineering Design of Hydraulic Structures Using Mathematical Model for Shrimp Culture in Bangladesh” Technical Journal, RRI, Faridpur December 2004, Bangladesh Dr Wahiduzzaman, Akira Mano



Contact this candidate