Post Job Free

Resume

Sign in

Project Engineer/Manager

Location:
Garden City, NY
Posted:
August 15, 2023

Contact this candidate

Resume:

LEELAMOHAN PANAKAM

Page * of *

** ******** **. *** **** Park NY 11040

Cell# 917. 319 .7270 adyyc2@r.postjobfree.com

Summary

• Mechanical Engineer with 14+ years of Broad experience in engineering and technical functions such as Estimating, Costing for Mechanical, Plumbing, Architectural and Structural for Bid Commercial Proposal including preparation of preliminary design review, material quantity take-off, man-hours, construction equipment, sub contract item assumption and special consideration to arrive at a competitive bid price.

• Data surveillance, preparation of bid deliverables, technical & commercial bid requirement and liaise with in- house department for the other requirement of the bid proposal. Capable of providing full interpretation of project scope of work and rendering technical assistance to the field operations supervision.

• Extraordinary ability to maintain multiple running project calculations accurately and clearly.

• Extensive experience in analyzing blueprints, specifications, proposals, and other construction documents to prepare time, cost, materials, labor estimates, RFI and RFP for ongoing projects.

• Perform comparative analysis of estimates for different specifications of the work package and arrive at the optimal cost and specification as per standards set by the company.

• Deep practical, theoretical and analytical knowledge in selecting and pricing HVAC equipment for large projects, optimizing affordability and energy.

• Engineering Support to Procurement of Materials and Components.

• Consult with engineers, architects, owners, contractors and subcontractors on changes and adjustments to cost estimates due to design discrepancies and/or filed conditions.

• Good communication, interpersonal and presentation skills. Able to work independently as well as in the team environment.

• Excellent problem solver with effective management and leadership qualities. Experience

Project Engineer/Manager Aug 2009 – Till Date

Rocon Corp.

16 First Street, New Hyde Park, NY-11040.

Responsibilities: Reviewing, estimating and managing HVAC projects, attending co-ordination and progress meetings with Architects, Engineers, Custodians, SCA officials and Sub-contractors, Scheduling and coordinating with CID & special inspections and safety meetings, Attending walk throughs’ and helping to develop cost information for bids, Design and drafting the shop drawings, emergency evacuation plans and as-built drawings, Guiding all trades in construction per job specific DOB plans and specifications, Preparing request for information’s and project close out documentation, Scheduling proposed parties involved for each system or equipment or facility start-up, demonstration and training.

College Assistant Nov 2008 – July 2009

Campus Facilities Office, LaGuardia Community College, CUNY Responsibilities: Helping in conducting research related to engineering activities, reviewing project details of new and renovating projects of LAGCC, and attending job-site meetings along with my director.

Deans Research Assistant Aug 2005- Jan 2006

Mechanical Engineering Dept., S.C.I.E.T, Hyderabad, INDIA. Responsibilities: Helped in the designing of engineering components using AUTOCAD and Conducted Static and Dynamic analysis of machine elements by finite element method using ANSYS. LEELAMOHAN PANAKAM

Page 2 of 3

Education

Masters in Mechanical Engineering Aug 2007 – Dec 2008 City College Of New York, NY, USA

Bachelor of Technology in Mechanical Engineering Aug 2003 – Apr 2006 Jawaharlal Nehru Technological University, Andhra Pradesh, India Diploma in Mechanical Engineering Jul 1999 – Oct 2002 S.V.Govt. Polytechnic, Tirupati, India.

Projects

Boiler Conversion & Climate Control at Public Schools 287 & 213, Brooklyn Replaced & installed the old oil-fired boilers with new gas fired boilers, replaced old vacuum/condensate pumps and receiver unit with two new duplex vacuum/condensate pumps and receiver unit, installed water booster pump, installed new hot water heater and storage tank, new stainless steel chimney liners, breeching for boilers & B-vent for hot water heater, stand-alone CO detection system and the gas leak detection system as per SCA specifications.

Boiler Conversion & Climate Control at Junior High School 217, Queens Replaced & installed the old oil-fired boilers with new gas fired boilers, replaced old vacuum/condensate pumps and receiver unit with two new duplex vacuum/condensate pumps and receiver unit, installed water booster pump, installed new hot water heater and storage tank, new stainless steel chimney liners, breeching for boilers & B-vent for hot water heater, stand-alone CO detection system and the gas leak detection system as per SCA specifications.

Boiler Conversion & Climate Control at Public School 41 & Intermediate School 143, Bronx Replaced & installed the old oil-fired boilers with new gas fired boilers, replaced old vacuum/condensate pumps and receiver unit with two new duplex vacuum/condensate pumps and receiver unit, installed new hot water heater and storage tank, new stainless steel chimney liner, breeching for boilers & B-vent for hot water heater, stand-alone CO detection system and the gas leak detection system as per SCA specifications.

Boiler Conversion & Climate Control at Intermediate School 144, Bronx Replaced & installed the three old fuel oil#4 fired boilers with three new fuel oil#2 fired boilers, new fuel oil transfer pump, replaced old vacuum/condensate pumps and receiver unit with two new duplex vacuum/condensate pumps and receiver unit, installed new hot water heater and storage tank, new stainless steel chimney liners, breeching for boilers & B-vent for hot water heater, stand-alone CO detection system and the gas leak detection system as per SCA specifications.

Water infiltration into tank vault at Middle School 142, Bronx Replaced & installed the two old oil tanks with two new field fabricated oil tanks, installed new stainless steel chimney liner and draft inducer, chemical grout injection waterproofing as per SCA specifications.

Sandy Permanent Work at Public School 112, Manhattan Replaced & installed the two old oil fired boilers with two new gas fired boilers, replaced old vacuum/condensate pumps and receiver unit with two new duplex vacuum/condensate pumps and receiver unit, replaced metal storage shelves, installed flood barriers and water tight doors, installed new hot water heater and storage tank, new stainless steel chimney liners, breeching for boilers & B-vent for hot water heater, stand-alone CO detection system and the gas leak detection system as per SCA specifications.

Boiler Conversion & Climate Control at Public School 101, Manhattan Replaced & installed the three old oil-fired boilers with three new gas fired boilers, new gas booster pump, replaced old vacuum/condensate pumps and receiver unit with two new duplex vacuum/condensate pumps and receiver unit, installed new hot water heater and storage tank, new stainless steel chimney liners, breeching for boilers & B-vent for hot water heater, stand-alone CO detection system and the gas leak detection system as per SCA specifications. LEELAMOHAN PANAKAM

Page 3 of 3

Boiler Conversion & Climate Control at Public School 007, Manhattan Replaced & installed the two old oil-fired boilers with two new gas fired boilers, new gas booster pump, replaced old vacuum/condensate pumps and receiver unit with two new duplex vacuum/condensate pumps and receiver unit, replaced old air compressor with new, installed new hot water heater and storage tank, new stainless steel chimney liners, breeching for boilers & B-vent for hot water heater, stand-alone CO detection system and the gas leak detection system as per SCA specifications.

Boiler Conversion & Climate Control at Public School 179, Bronx Replaced & installed the two old oil-fired boilers with two new gas fired boilers, new gas booster pump, replaced old vacuum/condensate pumps and receiver unit with two new duplex vacuum/condensate pumps and receiver unit, installed new hot water heater and storage tank, new stainless steel chimney liners, breeching for boilers & B-vent for hot water heater, stand-alone CO detection system and the gas leak detection system as per SCA specifications.

Boiler Conversion at Public School 140, Bronx

Replaced & installed the two old oil-fired boilers with two new gas fired boilers, replaced old vacuum/condensate pumps and receiver unit with new duplex vacuum/condensate pumps and receiver unit, installed new hot water heater and storage tank, new stainless steel chimney liners, breeching for boilers & B-vent for hot water heater, stand-alone CO detection system and the gas leak detection system as per SCA specifications.

Boiler Conversion and Climate Control at Intermediate School 147, Bronx Replaced & installed the three old oil fired burners with three new #2 fuel oil burners, replaced all old boilers tubes with new tubes, replaced old vacuum/condensate pumps and receiver unit with new duplex vacuum/condensate pumps and receiver unit, replaced pneumatic valves, thermostats and steam traps and installed two new hot water heaters, new stainless steel chimney liner, breeching for boilers & B-vent for hot water heaters, stand-alone CO detection system and the gas leak detection system as per SCA specifications.

Boiler Conversion and Climate Control at Intermediate School 158, Bronx Replaced & installed the three old oil-fired burners with three new #2 fuel oil burners, replaced all old boilers tubes with new tubes, replaced old vacuum/condensate pumps and receiver unit with new duplex vacuum/condensate pumps and receiver unit, replaced pneumatic valves, thermostats and steam traps and installed two new hot water heaters, new stainless steel chimney liner, breeching for boilers & hot water heaters and the gas leak detection system as per SCA specifications.

Boiler Conversion and Climate Control at Public School 120, Brooklyn Replaced & installed the two old oil-fired boilers with two new gas fired boilers, replaced pneumatic valves and steam traps and installed the gas leak detection system as per SCA specifications. Computer skills

• AutoCAD, Primavera, MS Project, MSOffice, Ansys, Fluent, Gambit, SolidWorks Simulation, ProEngineer, Mathcad, FORTRAN, C, C++, Windows, UNIX, Linux and Salesforce. Certifications

• OSHA Certified: 30-Hour OSHA training in Construction Safety & Health.

• Confined space training in accordance with 29 CFR 1910.146

• 4-Hour NYC Department of Buildings Scaffold training under local law 52.

• 7-Hour Construction Site Fire Safety Manager

• 7-Hour Site Safety Manager.



Contact this candidate