In my current role as a project engineer/planner, my scope include turnaround, planning, procurement, construction and commissioning of project ranging from RM500,000 to RM40,000,000. In my working experience, I have experience civil, mechanical, instrument and electrical project scopes. I have 5 years of working experience as contractor for Shell Malaysia Terminal (SMT Labuan, SMT Sandakan, Westport Installation, Pasir Gudang Installation), Petron Refinery and Heng Yuan Refinery. My scope of work include updating PEFS, SLD, DEM1 and AS-BUILT drawings for all the projects. I work closely with Project Manager to ensure the completion of projects within the given timeline.

Experience

Turnaround Engineer

Total Dynamic Engineering Sdn Bhd

Apr 2023 - Present (2 months)

Project Title: Hengyuan Refinery (formerly known as Shell Refining Company)- Major Turnaround 2023 Scope of Work:

1. Perform planning with Scheduler and Planner

2. Compiling Work Pack for Turnaround

3. Identify spading point

4. Supervise heavy lifting bundle pulling for heat exchanger 5. Coordinate and perform cost estimate for Emergent Work Project Engineer / Coordinator

Total Dynamic Engineering Sdn Bhd

Oct 2022 - Mar 2023 (6 months)

Project Title: SHELL-CAPEX-PASIR GUDANG-FIRE FIGHTING PUMP UPGRADE Scope of Work:

1. Replacement of Fire Fighting Pump (Diesel and Electrical) 2. Construct New Bundwall for Diesel Tank

3. Installation of New Fire Fighting Pump Panel

4. Commissioning of the whole project.

5. Develop Schedule, RA, JHA, JMS, Lifting Plan, and Scaffolding Design. 6. Updating of DEM1, PEFS, SLD and AS-BUILT Drawings. Project Engineer / Coordinator

Total Dynamic Engineering Sdn Bhd

Oct 2022 - Feb 2023 (5 months)

Project Title: SHELL-CAPEX-PASIR GUDANG INSTALLATION-REPLACEMENT OF INTERCEPTOR Scope of Work:

1. Construct new bundwall for new interceptor.

LIM KOK WEI - page 1

2. Perform installation of new interceptor.

3. Install new piping for new interceptor.

4. Perform testing and commissioning on the new interceptor. 5. Develop Schedule, RA, JHA, JMS, Lifting Plan, and Scaffolding Design. 6. Updating of DEM1, PEFS, SLD and AS-BUILT Drawings. Project Engineer / Coordinator

Total Dynamic Engineering Sdn Bhd

Oct 2022 - Jan 2023 (4 months)

Project Title: SHELL-CAPEX-PASIR GUDANG INSTALLATION-LAB HOOD CHIMNEY UPGRADE Scope of Work:

1. Perform installation of new ducting for new chimney. 2. Perform electrical cable laying for new motor.

3. Perform testing and commissioning.

4. Develop Schedule, RA, JHA, JMS, Lifting Plan, and Scaffolding Design. 5. Updating of DEM1, PEFS, SLD and AS-BUILT Drawings. Project Engineer / Coordinator

Total Dynamic Engineering Sdn Bhd

Jul 2022 - Sep 2022 (3 months)

Project Title: SHELL-CAPEX-PASIR GUDANG INSTALLATION-JETTY PIPE SUPPORT REPAIR Scope of Work:

1. To perform repair work for jetty pipe support.

2. Plan window for hotwork as the jetty is always full with vessel. 3. Commissioning of the whole project.

4. Develop Schedule, RA, JHA, JMS, and Scaffolding Design. 5. Updating of DEM1, PEFS, SLD and AS-BUILT Drawings. Project Engineer / Coordinator

Total Dynamic Engineering Sdn Bhd

Feb 2022 - Jul 2022 (6 months)

Project Title: SHELL-CAPEX-WESTPORT INSTALLATION-TANK 7 REPAIR Scope of Work:

1. To perform tank maintenance repair based on findings by SGS 2. Plan resources and manpower.

3. Purchase material and equipment based on the PO. 4. Perform testing and commissioning of the storage tank. 5. Develop Schedule, RA, JHA, JMS, Lifting Plan, and Scaffolding Design. 6. Updating of DEM1, PEFS, SLD and AS-BUILT Drawings. Scheduler

Total Dynamic Engineering Sdn Bhd

Dec 2021 - Feb 2022 (3 months)

Project Title: Petron Refinery- Major Turnaround 2022 Scope of Work:

1. Generate Primavera P6 schedule for Turnaround.

LIM KOK WEI - page 2

2. Planning of Resources and Equipment to ensure completion of turnaround within given timeline. 3. Work closely with Planner and Scheduler for completion of turnaround. 4. Major repair for furnace including change of U-Tube, and refractory. Lead Planner

Total Dynamic Engineering Sdn Bhd

Mar 2021 - Feb 2022 (1 year)

Project Title: Hengyuan Refinery (Formerly known as SHELL REFINING COMPANY) Euro 4M Project Scope of Work:

1. Lead Planning team to perform planning work, claim submission, and Test Pack Readiness prior to commissioning work.

2. Arrange manpower and resources to complete 25,000 dia inch of welding activity within 9 months. 3. Check the readiness of 323 test packs prior to handing over to client for commissioning. 4. Ensure completion of project without LTI. Total of 500,000 manhours without LTI. 5. Construction of new processing plant for new E4M Regulation Project Engineer / Scheduler

Total Dynamic Engineering Sdn Bhd

Jun 2019 - Mar 2021 (1 year 10 months)

Project Title: Petron Refinery-Petron Marine Import Facilities- Scope of Work:

1. Perform procurement of material (piping, civil, instrument and electrical) worth RM 20,000,000 2. Setting up Master Deliverable List.

3. Generate project schedule using microsoft project. 4. Generate Technical Card and Technical Queries.

5. Testing and Commissioning of Piping, Instrument and Electrical components. 6. Submit quotation to client for additional works. 7. Ensure completion of project without LTI. Total 800,000 manhours without LTI. 8. Procurement, Construction and Commissioning for 10km worth of pipeline which accumulate to 25,000 dia inch.

Project Engineer/Coordinator

Total Dynamic Engineering Sdn Bhd

Jan 2019 - May 2019 (5 months)

Project Title: SHELL-CAPEX-LABUAN INSTALLATION-MARINE FIREWATER LINE INSTALLATION Scope of Work:

1. Perform installation of hydraulic and fire water line from terminal towards jetty. 2. First firewater system in all Shell Terminal in Malaysia that utilise sea water as fire water. 3. Perform testing and commissioning with vendor from France. 4. Develop Schedule, RA, JHA, JMS, Lifting Plan, and Scaffolding Design. 5. Updating of DEM1, PEFS, SLD and AS-BUILT Drawings. Project Engineer / Coordinator

Total Dynamic Engineering Sdn Bhd

Jan 2019 - May 2019 (5 months)

Project Title: SHELL-CAPEX-LABUAN INSTALLATION-TANK 2 REPAIR LIM KOK WEI - page 3

Scope of Work:

1. To perform tank maintenance repair based on findings by SGS 2. Plan resources and manpower.

3. Purchase material and equipment based on the PO. 4. Perform testing and commissioning of the storage tank. 5. Develop Schedule, HAZID,RA, JHA, JMS, Lifting Plan, and Scaffolding Design. 6. Updating of DEM1, PEFS, SLD and AS-BUILT Drawings. Project Engineer

Total Dynamic Engineering Sdn Bhd

Jan 2019 - May 2019 (5 months)

Project Title: SHELL-CAPEX-LABUAN INSTALLATION-GANTRY SHED REPLACEMENT Scope of Work:

1. Replace gantry roof.

2. Perform blasting and painting on the roof structure. 3. Removal of asbestos and handling the disposable of asbestos. 4. Perform development of schedule, resources planning, JMS, JHA and HAZID Project Engineer

Total Dynamic Engineering Sdn Bhd

Jan 2019 - Apr 2019 (4 months)

Project Title: SHELL-CAPEX-LABUAN INSTALLATION-SEPTIC TANK INSTALLATION Scope of Work:

1. Excavation to remove soil from ground.

2. Perform installation of septic tank.

3. Installation of piping.

4. Perform development of schedule, JMS, JHA, SLD, Lifting Plan and Rescue Plan Project Engineer

Total Dynamic Engineering Sdn Bhd

Nov 2018 - Jan 2019 (3 months)

Project Title: SHELL-CAPEX-SANDAKAN INSTALLATION-JOCKEY PUMP INSTALLATION Scope of Work:

1. Install jockey pump in the fire pump shed.

2. Perform installation of new cable and panel inside fire pump shed. 3. Perform testing and commissioning.

4. Perform development of JMS, JHA, and HAZID

Project Engineer

Total Dynamic Engineering Sdn Bhd

Nov 2018 - Jan 2019 (3 months)

Project Title: SHELL-CAPEX-SANDAKAN INSTALLATION-UNDERGROUND PIPING PROJECT Scope of Work:

1. Perform development of JMS, JHA, HAZID, and Lifting Plan 2. Perform piling work for new pipe rack structure. LIM KOK WEI - page 4

3. Perform laying of pipe from jetty towards terminal. Cost Engineer

Total Dynamic Engineering Sdn Bhd

Jul 2018 - Dec 2018 (6 months)

Project Title: SHELL SRC 2018 Major Turnaround Package 2 - Complex 1 & 2 (Static Equipment & Project)

Scope of Work:

1. Purchase material for turnaround.

2. Perform cost estimation for additional scope during turnaround. 3. Identify additional scope

Education

Monash University

Bachelor of Engineering - BE, Mechanical Engineering 2014 - 2018

Curtin University Malaysia

Foundation degree, Mechanical Engineering

2013 - 2014

Licenses & Certifications

Authorised Entrant & Standby Person for Confined Space - NIOSH Certification Sdn Bhd

Issued Mar 2019 - Expires Mar 2021

Oil & Gas Safety Passport - NIOSH Certification Sdn Bhd Issued Mar 2019 - Expires Mar 2021

ISO 45001: 2018 Occupational Health and Safety Management Systems Certified

- SGS

68566976

ISO 9001 Lead Auditor - Quality Certification - SGS Basic Rigging and Slinging - NIOSH Certification Sdn Bhd Graduate Engineer - Board of Engineers Malaysia

Skills

LIM KOK WEI - page 5

Oracle Primavera • Microsoft Office • AutoCAD • Ansys Products • Microsoft Excel • SOLIDWORKS