Post Job Free

Resume

Sign in

Civil Site Supervisor /Engineer (construction)

Location:
Bakersfield, CA, 93312
Posted:
August 06, 2023

Contact this candidate

Resume:

FLORANTE

ULEP

adyrb4@r.postjobfree.com

661-***-****

Portfolio and Work Samples

Linked In

SKILLS

Analysis

Project Management

Site Supervision and

Inspection

Resource Management

Reporting

Quality Control

Horizontal and Vertical

Construction

Quality Assurance

Procedure

Implementation

Health and Safety

Compliance

Carpentry

Hazard Analysis

LICENSES

Saudi Council of Engineers

(SCE)

Saudi Arabia

Civil Engineer Licensure

Examination

PRC -Manila Philippines

(Passed)

EDUCATION

BACHELOR OF SCIENCE IN

CIVIL ENGINEER

Mariano Marcos State

University

Philippines

•Graduated with high honors

PROFESSIONAL EXPERIENCE

Civil Site Engineer

Kettaneh Construction, LTD

07/2011 – 06/2023 Al-Khobar, Saudi Arabia

•Directed and planned civil engineering projects, ensuring compliance with specifications, drawings, and safety standards.

•Monitored project progress, verifying work accuracy and adherence to proper methods and specifications.

•Estimated and procured necessary materials and manpower for site requirements.

•Prepared regular progress reports and maintained quality records.

•Implemented company project procedures and ensured high-quality construction in line with specifications and best practices.

•Collaborated with site staff to enforce the company's Health and Safety Policy and procedures.

•Key Projects

•2011

•KAFD (King Abdullah Financial District) District Cooling Plant, Riyadh, Saudi Arabia: Supervised the construction of the Buildings and Civil Works (Retaining Wall, Paving, Foundations, etc.) which cost 30 million USD and took 24 months to complete.

•Client: SNC-Lavalin

•2011-2013

•SATORP (Saudi Aramco Total Refining and Petrochemical Company) Aromatics Unit, JERP#3 (Jubail Export Refinery Project #3), Jubail, Saudi Arabia: Supervised the construction of Buildings and Civil Works (Closed Drain Ditch, Concrete Paving, Manholes, Pits, Ductbanks, Foundations, etc.) that had a project cost of 60 million USD with a completion time of 36 months.

•Client: Saudi Aramco

•2013-2015

•SADARA (Saudi Aramco and Dow Chemical Company) Project, Jubail, Saudi Arabia: Managed the construction of Buildings and Civil Works (Tank Farm, Asphalt Road, Concrete Pavement, Ductbanks, Pits, Manholes, Foundations, Ditches, etc.) that cost 70 million USD to build and took 36 months to complete.

•Client: Saudi Aramco

•2015-2016

•WWTP (Waste Water Treatment Plant) Upgrade System Project, Jubail, Saudi Arabia: Supervised the construction of the Waste Water Treatment Plant Project and other Civil Works, which cost 6 million USD to build and had a completion time of 14 months.

•Client: SABIC

•2016-2018

•QCCP (Conversion Of Qassim Simple Cycle Extension-2 and 3 to Combined Cycle Plant ): Supervised the construction of Buildings and Civil Works (Evaporation Pond, Manholes, Pits, Ductbanks, Foundations, Paving, etc.), which had a project cost of 97 million USD and a completion time of 34 months.

•Client: Saudi Electricity Company (SEC)

•2017-2019

•FCHPP (Fadhili Combined Heat and Power Plant) Project, Fadhili, Saudi Arabia: Managed the construction of Buildings and other Civil works with a project cost of 50 million USD and a completion term of 36 months.

•Client: Saudi Aramco & ENGIE France

•2019-2022

•RCF (RasTanura Refinery Clean Fuels) Project, RasTanura, Saudi Arabia: Supervised the construction of Civil Works (Evaporation pond, Paving, Manholes, Bridge, Pits, Ductbanks, Foundations) with a budget of 70 million USD and a completion time of 34 months.

•Client:Saudi Aramco

•2022-2023

•YIWP-4 (Yanbu Independent Water Project), Yanbu, Saudi Arabia: Supervised the construction of the Seawater Intake Pumping Station, Valve Pit, and Outfall Chamber which cost 10 million USD and was completed in 16 months.

•Client: ENGIE

Civil Site Engineer

Techman Industries, LLC

07/2008 – 07/2010 Dubai, UAE

•Managed and directed on-site civil engineering projects, ensuring alignment with specifications and drawings.

•Conducted regular site inspections to monitor progress and adherence to engineering plans, safety standards, and specifications.

•Estimated and arranged for necessary construction materials and manpower.

•Prepared and submitted regular progress reports, maintaining a consistent record of project status.

•Verified work quality, ensuring accuracy and compliance with applicable standards and specifications.

•Implemented and enforced company project procedures, maintaining site testing records.

•Upheld high-quality construction practices in line with specifications and industry standards.

•Key Projects

•2008-2008

•Al-Attar Building: Supervised the installation of balcony steel glass holder in every floor level of G+ 70, which had a project cost of 5 million USD and a completion time of 5 months.

•2008-2008

•Limitless, Downtown, Jebel Ali: Oversaw the installation/erection of structural steel supporting the Garden Pavilion and Amphi-Theatre LED Screen that had a budget of 5 million USD and took 4 months to complete.

•2008-2008

•Jumeirah Hotel and Burj Al-Arab: Managed the fabrication and installation of Pre - Cooling System at the chiller yard that cost 3.5 million USD and took 4 months to complete.

•2008-2008

•Al-Attar Business Tower: Supervised the installation of Roof Panel at the rooftop level which had a project cost of 4 million USD and a completion time of 5 months.

•2008-2008

•Merraki Tower, Deira: Oversaw the installation of a 2-Storey Mezzanine which cost 5 million USD to build and took 5.5 months to complete.

•2008-2008

•Dubai Investment City (DIC): Supervised the installation of Silo that took 3 months to build and had a project cost of 3 million USD.

•2010-2010

•Dubai Festival City: Participated in the construction of Floating Stage that was completed in 3 months and a budget of 4 million USD.

•2010-2010

•Prism Tower, Business Bay: Managed the installation/fabrication of Structural steel and cladding Pool Canopy & Helipad, which cost 4 million USD and a completion time of 5 months.

•2010-2010

•The Company Building, Dubai: Supervised the installation of gypsum board wall, glass window/wall, gypsum ceiling tile, and steel/aluminum cladding with a budget of 3.5 million USD and a completion time of 4 months.



Contact this candidate