Electrical Supervisor
Samsung Engineering
Sarawak Methanol Plant Project
Mobile no:+60-10-258-****
email address: *****.******@*****.***
Expected Salary:RM/month
Permanent Address: Kudat Sabah
Current Address: Miri, Sarawak
Gender: Male
Age: 45 Years
Nationality: Malaysia
Availability: 1 month notice
Vaccinated Status: 2 Dose Completed + Booster
Key Summary/Achievement:
-Have been working in the Mechanical & Electrical (Coordination, planning, construction, installation, commissioning and handing over to various clients`.
-Have been involved in various construction sectors from housing to commercial sector and high-rise to chemical plant, domestically and Internationally for 21 Years .
-Managing Site team, coordination, identification and solving technical issue arise (Clients, Consultants, Vendors and sub-contractors)
-Manage to estimate total costs, plan the budget, monitor spend, and prepare for potential risks. Remain vigilant throughout the cost management process to ensure they stay within budget.
-Excellent time management.
-Highly organized with strict adherence to deadlines.
-Proficient multitask, working well under pressure. Education
2022 Open University Malaysia (OUM)
Bachelor of Science in Project and Facility Management with Honour
Major : Project Management
Grade: Ongoing
2021 Universiti Malaysia Pahang
Professional Diploma in Process Control & Instrumentation Technology (Oil & Gas) Malaysia
Major : Process Control & Instrumentation
Grade: Pass
2000 British Malaysian Institute
Higher National Diploma in Engineering (Electrical) Malaysia Major: Electrical Power
Grade: Pass
1998 IKM
Professional Certificate in Electrical Engineering (Domestic & Industry) Malaysia
Major: Electrical (Domestic & Industry Installation- Single and 3 Phase)
Grade: Pass
Professional Body Registration
2022 The Institution of Engineer, Malaysia (IEM)
Registered ASSOCIATE MEMBER-Electrical
Major : Electrical
ID Member: 118663
2019 Board of Engineer Malaysia (BEM)
Registered Inspector of Work-Electrical
Major: Electrical
Reg. No: (221*-******-W16445) Valid until Dec 2024 1998 Wireman PW2 (240V- Single Phase with
Endorsement)
Major: Electrical (Domestic & Industry Installation- 240V and 415V)
Computer Skills
Experience in Mechanical & Electrical Work
21 years of total experience
Years of Experience Trade
21 Electrical and Control System-(Construction, Installation and Pre- Commissioning)ELV & LV & MV
15 Plumbing System- Hot & Cold Water and Sanitary-(Construction, Installation and Pre-Commissioning)
10 Fire Alarm and Protection System-(Construction, Installation and Pre-Commissioning)
5 Air conditioning & Mechanical Ventilation System-(Construction, Installation and Pre-Commissioning)
5 Static and Rotating Mechanical -(Construction, Installation and Pre-Commissioning)
Languages
Proficiency level: 0 - Poor, 10 - Excellent
Language Spoken Written
Bahasa Malaysia 10 10
English 8 8
Type Description Proficiency level
Office Suites Word
Excel
Outlook
PowerPoint
Intermediate
Workspace
Docs
Slides
Sheets
Forms
Meet
Intermediate
Engineering Auto-cad Basic
Planning Microsoft Project Basic
Working Experience
Sep 2019 - Present
(3 years)
M&E Project Engineer/ Coordinator (Raw Water
Pumping Station,33/11kV Sub-Station, Gen-Set Room
and MSB)
SINOHYDRO CORPORATION (M) SDN. BHD. Sarawak, Malaysia Industry Utilities / Power
Specialization Engineering - Civil/Construction/Structural Role Project Management
Position Level Senior Executive
Project: The Proposed Miri Water Supply Source Development Phase 2, Miri Division
a) Phase 1: Upgrading of Bakong Intake and Pumping Main Station b) Phase 2: Raw Water Transfer System from Batang Baram to Sungai Bakong/SungaiLiku
Work Scope Supervision
Electrical Works
1.33/11kV Substations and 11kV/415V Substation installation (33kV GIS and 11kV AIS
Switchgear)
2.11/15MVA Power Transformer & 11/.433 Distribution Transformer Installation3.33kV (16KM) and 11kV (15KM) underground Cable routing and Termination4.415V
Underground Cable routing and Termination
5.Internal and External Wiring for Mechanical and Electrical Works (Conceal and Expose) LV,Fire Suppressions, Air-Conditioning, Earthing, Lightning Protection, Street Lighting)
6.4 nos 1500kVA Standby
Generator Set Installation
7.MSB,MCC and VSD Installation
cabling and termination
Mechanical Works
1.60MLD and 50MLD RAW water
Pump Installation 2.10T and 7.5 T
Overhead Travelling Crane Installation
3.2T Manual Operated C Frame Crane
Installation 4.1T Electric Operated JIB
Crane Installation
5.Electric operated and Manual
Penstock Installation6.Surge Vessel
c/w compressed air system
7.Raw Water Pipeline 1600mm dia. 15km Installation 8.Surge Vessel Tank 50M3 capacity Installation-3 nos Work scope supervision
1.To Manage all M&E matters as required for construction and ensure works is accordance tothe contract specification, acceptable quality of works, meets the functionality requirement and completion on time.
2.To manage M&E submission, shop drawings and design proposal information for approval3.To ensure the internal coordination between M&E installation and C&S and Architectural works is in order to avoid double handling and unnecessary rectification work
4.To ensure M&E installation progress is accordance to agreed work- programmed and on-timecompletion
5.Ensure authority/client/end users requirement are meet according to contract requirement.
6.To follow up on testing and approval.
7.To ensure M&E installation is recorded/documented accordingly and conveyed to QSDepartment for claim proposed
8.Develops a work plan for routine check, Mechanical completion, Pre- commissioning and Commissioning
9.Attend to Consultants, client or site meetings as required and ensure quality and safetystandards in line with the company’s requirement. Mar 2019 - Aug
2019
(6 months)
Inspector of Work-Electrical (Railway System)
Perunding Eagles Engineers Sdn Bhd Johor, Malaysia Industry Consulting (IT, Science, Engineering & Technical) Specialization Engineering - Civil/Construction/Structural Role Clerk of Works/Site Supervisor
Position Level Senior Executive
Project Site: Electrified Double Track Gemas-Johor Bahru Rail Project Job Description:
1. Monitoring the Contractors work to ensure compliance with client scope of works.
2. Monitoring, controlling, solving problems, conflicts management 3. To lead, guide, steer, inspire, and motivate his entire project team and to marshal all necessary resources to implement and manage tasks and activities to achieve milestones and project deliverable, usually in terms of time cost and quality in order to ensure project success 4. Daily report on activities, planning and achievement 5. Weekly report on activities, interfacing and achievement 6. Attending Inspection installation done and prior to pre-testing and commissioning activities
7. To make sure all works are compliance with specification prior energisation start-up.
Work scope supervision
Electrical, Signaling, Communication and Earthing Bonding Works
-Lighting and small power
-Conduit, trunking, tray, cable pulling and Electrical panels and devices installation, terminationand inspection.
-Continuity Test -Insulation Test -Earth Test -Small Power/Lighting System
-GI Trunking/conduit Installation
-Main Switch Board Installation
-Electrical panels Installation, Cable pulling and termination.
-Continuity Test
-Insulation Test
-Earth Test –
-Cable tray, trunking, conduit, earthing, MSB, panels, DB, lightning installation, power, lightingand control cable pulling and termination Sep 2017 - Oct
2018
(1 year 2 months)
Building Supervisor-HVAC (275/33kV & 33/11kV
Sub-Station and LCB)
(TRS Staffing Solution Seconded to Flour Daniel Malaysia) Industry Oil / Gas / Petroleum
Specialization Engineering - Oil/Gas
Role Project Management
Position Level Senior Executive
Project Site: RAPID PETRONAS, 275KV Main Sub Station 401, 301, 33/11KV Unit SubStation 480, 839 and Local Control Building (LCB) 839, Package 14-OUIJV/IU&I, Pengerang Johor, Malaysia.
Job Description:
1. Monitoring the EPC Contractors work to ensure compliance with client scope of works.
2. Monitoring, controlling, solving problems, conflicts management 3. To lead, guide, steer, inspire, and motivate his entire project team and to marshal allnecessary resources to implement and manage tasks and
Activities in order to achieve milestones and project deliverable, usually in terms of time costand quality in order to ensure project success 4. Daily report on activities, planning and achievement 5. Weekly report on activities, planning, SIMOPS, interfacing and achievement
6. Attending Inspection prior to pre-commissioning activities 7. To make sure all works and PSAR items are done before Substation pre-commissioning andenergisationstart-up.
Work scope supervision
a) Electrical-Lighting and small power
-Conduit, trunking, tray, cable pulling and Electrical panels and devices installation, terminationand inspection.
b) HVAC System
-Cabling, Damper, ducting, Panel installation, wiring termination and inspection. System-Pressure Test-Room temperature and Humidity Test-Velocity Test- Ductwork Test-Blower Speed Test- Recirculated air flow Test-Airflow Rate Test-Air Temperature Test-Water Reticulation Test-Control Equipment System- Electrical System Test
c) Fire Protection and Suppression system
- Piping and INERGEN Cylinder Installation and all associate works for pre-commissioning installation, Fire& Heat detection alarm installation, cabling, wiring, termination inspection & pre- commissioning.
d) Earthing and Lightning protection system
-Underground and above ground earth grid installation, termination and inspection.
e) PA System- Installation and Pre-commissioning
f) Plumbing (cold & hot water) and Sewerage system Jul 2016 - Sep 2017
(1 year 3 months)
M & E CLERK OF WORK
Perunding Eagles Engineers Sdn Bhd Kuala Lumpur, Malaysia Industry Consulting (IT, Science, Engineering &
Technical)
Specialization Engineering - Civil/Construction/Structural Role Clerk of Works/Site Supervisor
Position Level Senior Executive
Project Site: Centre of Excellence, Office and Training Centre, Kualiti Alam, NegeriSembilan
Job Description:
1) To comply all the client and ISO and GBI requirement. 2) To plan and execute work and manpower on daily basis. 3) To prepare schedule and ensure all dateline are achieving as per client requirement.
4) To prepare documentation as per required by client. 5) Plan, coordinate and implement all M&E installation and coordination works
6) Monitor and control all activities to ensure works are done according to the specificationsand timely complete the works within the deadline as stipulated in the contract
7) To verify project drawing and technical specification. 8) To witness and verify Inspection/ Testing and commissioning for: Work Scope Supervision
a) Electrical/Solar Installation. -Continuity Test -Insulation Test -Earth Test -Small Power/Lighting System -GI Trunking/conduit Installation - Standby Diesel Generator Set Installation -Main Switch Board Installation -Earthing and Lightning Protection System -StreetLighting Installation
b) Fire Suppression & Protection Installation -CO2 System Installation & Commissioning -Fire Stop Installation –Fire & Heat Detection system wiring and installation & Commissioning-HoseReel & Sprinkler System Installation and Commissioning
c) Plumbing Sanitary & Cold water Plumbing -Pressure test -Flow Test - Pump Set Installation
-Sanitary Works Installation -Cold/Hot Water Installation -Water Tank Test-Pipework Test (Hot and Cold Water and Sanitary Pipe)-Electrical test
d)ACMV-VRV System-Pressure Test-Room temperature and Humidity Test-Velocity Test-Ductwork Test-Blower Speed Test- Recirculated air flow Test-Airflow Rate Test-Air
Temperature Test-Control Equipment System- Electrical System Test e) Lift Passenger and Moving Equipment-Installation, JKKP inspection and approval, equipment’s selection and Submission- Drop Test-Over Speed Test-Balance Test-LoadTest-Safety Operation Test-Insulation Test-Performance Test
Jan 2014 - Jun
2016
(2 years 6 months)
M & E Coordinator (Sub-Station, Classroom,
Hostel,Pump Room & Infra Work)
PRESERVER BINA SDN BHD Melaka, Malaysia
Industry Construction / Building / Engineering
Specialization Engineering - Civil/Construction/StructuralRole Project Management
Position Level Senior Executive
Project Site: Malaysian Academy of Hans Studies, Bukit Katil Melaka. Scope of Work:
1) To comply all the client and ISO requirement.
2) To plan and execute work and manpower on daily basis. 3) To prepare schedule and ensure all dateline are achieving as per client requirement.
4) To prepare documentation as per required by client. 5) Plan, coordinate and implement all M&E installation and coordination works
6) Monitor and control all activities to ensure works are done according to the specifications and timely complete the works within the deadline as stipulated in the contract
7) To verify project drawing and technical specification. 8) To keep all relevant forms, document, correspondence and records in respect of the progress of works such as daily work record which encompasses labour force and machinery
9) Upon completion of work, to carry out final inspections and handovers including ensuring that all
as built drawings are prepared and a copy kept with relevant superiors prior to issuance of certificate of practical completion. Work Scope Supervision
a) Electrical Installation -Continuity Test -Insulation Test -Earth Test -Small Power/Lighting System -GI Trunking/conduit Installation -Standby Diesel Generator Set Installation -Main Switchboard Installation -Earthing and Lightning Protection System -Street Lighting Installation b) Fire Protection Installation -Pressure test -Continuity Test -Hose Reel System -CO2 System Installation -Wet Chemical Installation -Fire Alarm System -FM 200 Installation -Fire Pump Set Installation -Fire Stop Installation -Clean Agent Installation
c) Plumbing Sanitary & Cold water Plumbing -Pressure test -Flow Test - Pump Set Installation -Sanitary Works Installation -Cold/Hot Water Installation -Water Tank Test-Pipework Test (Hot and Cold Water and Sanitary Pipe)-Electrical test
d)ACMV-Pressure Test-Room temperature and Humidity Test-Velocity Test- Ductwork Test-Blower Speed Test-Recirculated air flow Test-Airflow Rate Test-Air Temperature Test-Water Reticulation Test-Control Equipment System- Electrical System Test
e) LPG System-Pressure test-leak test-installation test-equipment f) Lift, Passenger and Moving Equipment-Installation, JKKP inspection and approval, equipment’s selection and Submission-Drop Test-Over Speed Test-Balance Test-Load Test-Safety Operation Test-Insulation Test- Performance Test
Jan 2013 – Dec 2013
(12 months)
Electrical Superintendent (Sub-Stations)
Chudenko (M) Sdn Bhd (Under Chiyoda Corporation Pte Ltd.) Industry Heavy Industrial / Machinery / Equipment
Specialization Engineering -
ElectricalRole Project Management
Position Level Senior Executive
Project: Tokuyama (M) Poly crystalline Silicone
Manufacturing Plant Project.Location: TMP 2(Phase 2), Samalaju Industrial Park, Bintulu Malaysia.
Job Description:
1)To comply all the client and ISO requirement.
2)To plan and execute work and manpower on daily basis. 3)To prepare schedule and ensure all dateline are achieving as per client requirement.
4)To prepare documentation as per required by client. 5)Electrical Room (5 Location-Medium Voltage 6.9KV) 6)Witness the installation inspection and testing of Electrical earthing cables 7)Attend/witness the power and control cable glanding termination and testing
8)Final visual inspection and function test of Electrical heat tracing cables 9)Attend/witness the lighting receptacle distribution panel inspection and function test
10)Visual inspection of cathodic protection and testing 11)Attend/witness the insulation resistance test of power and control cables 12)Visual inspection, continuity and function test of Switch-gear Bus Bar 13)MCT frame installation inspection prior for cable entry to Substation 14)Visual inspection and function test of LV MCC drawer (Motor control centre) prior for cable termination
15)Visual inspection of local panel and LCS (Local control station) 16)Installation inspection of UPS Battery System
17)Inspection of Electrical cable trench before and after backfilling activities 18)Inspection of cable dressing for underground and above ground from field to Sub Station
19)To perform and conduct Testing and commissioning for: Work Scope Supervision
a) Electrical Installation. -Continuity Test -Insulation Test -Current Transformer Test-Protection Secondary Test-Meter and Earth Test- Transducer Test-HiPot Test-Ductor Test-Cable Phase Test - Bus Duct Installation -Transformer Installation (6.6/0.4-23kV 2000/1500/1000kva)- Capacitor Installation 2000Kva- standby Diesel Generator Set Installation - High/Medium Voltage Switchgears Installation -Power cables pulling and Terminations-Earthing System Installation.
b) Sub-Station Panels Installation-Feeder Panel-Power Compensation Panel
– EDG Operation Panel-Vent Gas Compression Panel- Screw Compression Panel- HPW/EPW/Cold MOH Circulation Panel- Heater Panel (HCL, HM)- Pump Panel (Lube Oil, HVAC, Oil Make-Up, HM Feed, HM Recovery, Storm Water, Sanitary Sewer Discharge, Reflux, Bottom Side Cut, Low Pressure DG3, Condensate, Converter Panel, Transformer Panel. etc.) Jan 2012 - Dec
2012
(12 months)
Electrical Supervisor-Building (Clean Room,
Assembly Area,MCC, Production and Packing Area)
Kandenko Engineering (Malaysia) Sdn Bhd Under Teisei Corporation Pte Ltd.
Industry Heavy Industrial / Machinery / Equipment
Specialization Engineering -
ElectricalRole Project Management
Position Level Senior Executive
Project: TMP 1(Phase 1), Tokuyama (M) Poly crystalline Silicone ManufacturingPlant Project.
Location: Samalaju Industrial Park, Bintulu Malaysia. 1)To comply all the client and ISO requirement.
2) To plan and execute work and manpower on daily basis. 3) To prepare schedule and ensure all dateline are achieving as per client requirement.
4) To prepare documentation as per required by client. 5) Visual inspection and function test of LV MCC drawer (Motor control centre) prior for cable
termination
6)Clean room conduit, trunking, wiring, termination and testing and commissioning
7) Visual inspection of local panel and LCS (Local control station) 8) Installation inspection of UPS Battery System
9) Inspection of Electrical cable trench before and after backfilling activities Inspection of cable dressing for underground and above ground from field to Sub Station
Work Scope Supervision
a) Electrical Installation for LV works (MCC Panel,Control Room,Clean Room,Assembly Area,Packaging Area)
-Continuity Test -Insulation Test -Earth Test -Small Power/Lighting System - GI Trunking/conduit Installation-Cable Ladder Installation -Earthing and Lightning Protection System -Street Lighting Installation - Installation -Power cables pulling and terminations (Non-explosion fitting)-punch list termination. Jan 2011 - Dec
2011
(1 year 1 month)
M & E Supervisor
First Nationwide Development S/B
Industry Construction / Building / Engineering
Specialization Engineering - Electrical
Role Project Management
Position Level Senior Executive
Project: 218 units 3 storey Bungalow at Zero Lot at Bandar Utama,petaling Jaya,Selangor.
May 2008 - Nov
2010
(2 years 7 months)
Project Coordinator
Hainal-Konyi PVT LTD IVietnam) Ho Chi Minh City, Vietnam Industry Consulting (IT, Science, Engineering & Technical) Specialization Engineering - Civil/Construction/Structural Role Supervisor/Team Lead
Position Level Senior Executive
Project Site: Construction of 12 blocks of apartment (Phase 1) 38 Storey in Tan Phu Ward,District 7, Ho Chi Minh City, Vietnam. 2007 - 2008
(1 year 1 month)
M & E Site Supervisor
Metro Millenium S/B Maldives
Industry Construction / Building / Engineering
Specialization Engineering - Civil/Construction/Structural Role Supervisor/Team Lead
Position Level Junior Executive
Project Site: 150 Unit House,Tsunami re-construction Project, British Red Cross Society(Khalaidoo Island, Maldives) & French Red Cross Society (Thundi Island, Maldives)
2002 - 2006
(4 years 1 month)
M & E Site Supervisor
Hataletro Sdn Bhd Kuala Lumpur, Malaysia
Industry Construction / Building / Engineering
Specialization Engineering - Civil/Construction/Structural Role Supervisor/Team Lead
Position Level Non-Executive
Project:
1) 5 Storey Luxury Apartment Jalan Ampang, Selangor 2) Pusat Penyelidikan MARDI Selangor
3) Pusat Rekreasi Bukit Lagong, Selangor
4) Ubah suai dan naik taraf PA System, Nilam Puri Universiti Malaya, Kelantan
5) 11 unit Double Storey Semi-D untuk PKNS Bangi, Selangor