Post Job Free

Resume

Sign in

Construction Manager Qa Qc

Location:
Adana, Turkey
Posted:
August 03, 2023

Contact this candidate

Resume:

Kalkan HELVACI

Site Construction Manager/Consultant

Mail: adyosp@r.postjobfree.com ; adyosp@r.postjobfree.com Phone :+90-531-***-**-**(whatsApp)

CV-KALKAN HELVACI 1

PERSONNEL DATA

Date of Birth : 1968

Nationality : Turkish Republic

Gender : Male

Country..:Turkey

Education

MECHANICAL ENGINEER, BSc.

UNIVERSITY; ÇUKUROVA UNIVERSITY,ENGINEERING FACULTY,ADANA .Graduation Year: JUNE 1989

Computer Skills

.Microsoft Office(Excel macro usages)

.Access

.MS project,Auto cad,Solid,Navis as professional usages; PDMS & CaeserII piping stress familiar. Language

.English .Advance level

.Russion ..Beginner

Certificates

Hydroulic&Pynomatic system control and operation.MMO-Adana branch-year 1992

Autocad course.MMO-İzmir-year 1994

NDT training Courses,(MT,PT,VT,RT2)-year 2007

MS Project course..MMO-Adana 2006

OBJECTIVE

I am very well experienced, worked with multi national companies and staff, dynamic, job and result-oriented professional engineer who has more than 25 years of managerial experience in various large scale and challenging EPC industrial construction projects and seeking career on industrial and infrastructure construction projects in land or oversea countries where skills and previous experiences can be put to efficient use for the company.

PROFESSIONAL SKILLS

While having construction & management experience of 30 years on domestic & international complex projects, high level of management skills on multi-cultural project team and high level of health-safety- environment & quality assurance/ quality control knowledge, below listed tasks achieved.

• Responsible for overall management of projects from start to completion.

• Managed project team activities and functions.

• Controlled & directed multi-disciplinary & multi-national workforce.

• Coordinated multiple contractors.

• Ensured project team have a clear understanding of contract and applicable obligations.

• Ensured all operations are undertaken in a safe manner in accordance with the laws, regulations, requirements, specifications & codes of quality & health-safety-environment policy of the contract, company & government.

• Supervised quality assurance/quality control staff to ensure project quality objectives maintained.

• Reviewed risk analysis.

• Reviewed & revised procedures if required, in conjunction with project engineers.

• Reviewed project time schedule.

• Reviewed project measurement, cost assessment and monthly valuations.

• Coordinated & assisted quantity control/surveying engineers in producing claims & initiate negotiations with client.

• Achieved close liaison with the client representatives. Kalkan HELVACI

Site Construction Manager/Consultant

Mail: adyosp@r.postjobfree.com ; adyosp@r.postjobfree.com Phone :+90-531-***-**-**(whatsApp)

CV-KALKAN HELVACI 2

FIELDS OF EXPERIENCES

POWER PLANTS

PULVERIZED COAL COMBUSTION TYPE POWER PLANT ;

BOILER ERECTION ACTIVITIES

Boiler water Wall&internal coil heaters(ECONOMIZER&SUPERHEATER&REHEATER GROUPS )

Drum & Separator erection

İnternal water Wall and Heaters connection piping that are alloy HP&LP system.

Boiler&Turbine connection alloy HP&LP piping(Feed water,Main Steam &Reheater lines)

Steel structure (boiler building-heavy type)

Flue gas,FD,ID ducts lines erection

Air preheater (rotary type ) erection

Slag extraction system erection

Pressure hydro test & flashing of boiler&piping and pre-cold commissioning activities performed. Note:Drum,water walls & coils pre erected ; heavy lifting activities done by hydroulic jacks system.Remain light lifting activities done by Vinch system or Cranes. Coal supply&Feed system&Mills&Burners

Coal conveyor supply &crusher system erection(from stacker to bunker silo)

Bunker stock structure erection

Feeder conveyors erection

Coal Mill Erection

Pulvarized coal ducts &expension compensators erection

Coal burners erection on the boiler

Oil burners & piping erection

Pre-cold commissioning activities performed.

ESP ERECTION ACTIVITIES

ESP structure,casing &electrod panels&hummer system erection

Fly ash equipments &ash handling system and ash piping erection up to fly ash silos

Fly ash silos equipments erection that vacum fan &ash discharge system to silotrack and to conveyor.

Air leak test &flashing,pre-cold commissioning performed. SIMPLE CYCLE AND COMBİNED CYCLE POWER PLANT (SCPP&CCPP) ; HRSG BOILER&DUCTS

Boiler casing and internal heater finned coils pack erection.the coils lifted by hydroulic jacking system.

Drum

Casing,duct &dumper erection

Stuck erection

Insulation&cladding works

Air inlet filter&duct erection

Internal piping HP&LP and between boiler&steam turbine main steam&Feed water piping erection

Hydro test and flashing

Pre &cold commissioning activities

Kalkan HELVACI

Site Construction Manager/Consultant

Mail: adyosp@r.postjobfree.com ; adyosp@r.postjobfree.com Phone :+90-531-***-**-**(whatsApp)

CV-KALKAN HELVACI 3

MECHANICAL WORKS

GE 9FA gas türbine erection

Genarator erection

Jacking&cooling oil system erection & flashing

process piping&test and flashing

Remain whole Mechanical equipments erection.

Demi water unit,storage tanks, mechanical&piping system erection,test&flashing Works.

fuel tanks;Proses water tank,Fire Fighting water tank erection.

LFO,fire fighting & proses piping,testing&flashing

LFO fuel speration system mechanical Works(Alfa Laval)

Forced Air Cooling unit erection

NG lines,metering skid and pre speration unit erection

Transformers erection

Utility system(BOP) and condenser cooling system large skale piping.

HVAC system mechanical & sheetmetal duct Works

Fire spring &deluge system piping,testing,flashing,commissioning,

System base pre & cold commissioning Works planning&performing CIVIL WORKS

infrastructure works

building&racks steel structure Works

trench Works for E&I

E&I WORKS

Substation MCC box erection&cabling

High voltaj cabling stepup transformer to switch yard

switch yard structure equipments erection

E&I cabling loop check Works

Insrument device calibration &testing control

PETROCHEMICAL&REFINERY &GAS PLANT,

Constand equipments(Vertical&Horizontal ) erection-heavy lifting studies.

Rotary equipments erection-heavy lifting studies

Naphtha Steam Cracking boiler erection internal connection piping,testing,flashing,commissioning.

Sphere tank erection (propane&butane gas storage- 20 piecess;dia-16,6mt - 2400m3),

Crude oil pipe line 14”,45 km erection,testing&flashing

Crude oil storage tanks erection with roof,

NG naturel gas underground storage system wellhead gathering

and hp piping,

24” NG pipe line,5 km,testing,flashing,drying&nitrogen filling.

NG hot tap work

NG Separation system unit equipment erection&mechanical Works piping,testing,flashing,drying,filling nitrogen

Metering system erection&commissioning

Force air cooler –dry type erection

E&I Works,loopchecks,commissioning

Cathodic protection

cladding, refractory,

electrical, instrumentation, automation,

steel structure buildings,

pipe racks,structure buildings erection

spoolling,pipe prefabrication,painting works

process piping,testing,flashing&commissioning

Kalkan HELVACI

Site Construction Manager/Consultant

Mail: adyosp@r.postjobfree.com ; adyosp@r.postjobfree.com Phone :+90-531-***-**-**(whatsApp)

CV-KALKAN HELVACI 4

pre-commissioning & commissioning works.

GOLD MINE PROCESS

• Mill erection(ball-sag mill& crusher)

• Ore Conveyor transporting system

• Mechanical Works of POX unit and utilities, Slurry pumps

• Storage tanks, Thickeners erection

• LP-HP-process & oxygen piping

• Steel structure pipe racks-buildings

• Pre-commissioning & commissioning Works,

• Utulities;waste water, WTP water treatment plant, fire fighting system,painting, hot & cold insulation,building cladding

IRON ORE BLAST FURNACE

• Blast furnace body,Steve erection,

• Hot air ducts,Tuyers erection

• Poul Worth charging system erection

• Stove hot air heaters and utilities,

• Melted iron convey channels,

• Slag granular system,

• Ore handling system and conveyors,

• Refractory Works,

• Steel structure buildings,pipe racks,

• Substation MCC box erection,cabling,loop check Works.

• Pre-commissioning & commissioning works

EXPERIENCE RECORD

FROM TO COMPANY POSITION WORK & PROJECT

2021-may-december USTAY Cons. Manager SRU Project Saipem/GPZN-Moscov Manage&organization Mechanical Construction-HSE-QA/QC disciplines

• Steel str.erection

• process piping prefabrication and site piping works

• process equipment erection.Heavy lifting studies 2019-2021 April UET Site Manager AGPP Gasprom-Tecnimont- Ronasans Manage&organization Mechanical Construction-HSE-QA/QC disciplines

• Sphere tank erection (20x;die-16,6mt / 2400m3),hydro testing,insulation&cladding

• Process piping,testing,flashing-commissioning

• Steel stracture erection(pipe racks/building)

2017-2019 UET Site Manager Anagold Gold mine Çöpler Sulfide Expansion Project. Manage&organization Construction-HSE-QA/QC disciplines

• Storage Tanks,Thickeners erection

• Mill erection(ball-sag mill-lime stone mill)

• Actuators;Slurry pumps

• Constant vessels,heavy lifting studies

• Ore conveyor rack&belt;crusher erection

Kalkan HELVACI

Site Construction Manager/Consultant

Mail: adyosp@r.postjobfree.com ; adyosp@r.postjobfree.com Phone :+90-531-***-**-**(whatsApp)

CV-KALKAN HELVACI 5

• Process piping&HP-LP oxigen piping,fire fighting & utility piping,raw water supply (HDPE) Works

• Steel stracture erection(pipe racks/building)

• Testing & reinstatements ; pre Commissioning works 2016 - 2017 CALIK ENERJI Site Manager KHOMS-LİBYA 2X275MW SCPP .GE-9FA GAS TURBINE (Client: GECOL-LIBYA)

Manage&organization çivil&E-I&Mechanical -HSE-QA/QC disciplines(also organization security issue ) and Commissioning works

• GE 9FA gas türbine erection

• Process piping

• Civil Works;UG cable ducts;buildings; cement bench yard organization

• E&I Works&conrtrol room(DCS);MV-LV cubics; HV cable lines(burrried);switch yard connection to national grid system

• Whole Mechanical works

• Transformers,

• Fuel tanks;Process&Fire fighting&Demi water tanks erection,painting.

• LFO Fuel speration system erection

• Demi water system pack

• Forced Air Cooling unit

• NG lines,metering skid and pre speration unit erection

• Building&racks steel stracture Works

• Testing,flashing,loopcheck,Commissioning Works planning&management 2014 - 2016 AKS JV Site Manager

U.G N.G. Storage Phase II Well Getharing -Seperation Piping & Pipeline Project (Client: Turkish Petrol) N.G. Pump Station Capacity Increase &Rewamp Project Manage Organization Mechanical&çivil&E-I & HSE-QA/QC disciplines

• Piping from wells to process area( speration&elimination&drying units)

• Pipe line from process to interconnecting national grid;hot tapping

• Process piping-metering unit including

• Mechanical Works;

• Pressure vessels erection,heavy lifting studies

• Forced air cooling units

• E-I Works,LV-MV cubics,DCS

• Fire fighting Works,dry-wet system piping,sense system set up.

• Testing & reinstatements ; pre Commissioning works

NG naturel gas underground storage system wellhead gathering

and hp piping,

24” NG pipe line,5 km,testing,flashing,drying&nitrogen filling.

NG hot tap work

NG Separation system unit equipment erection&mechanical Works piping,testing,flashing,drying,filling nitrogen

Metering system erection&commissioning

Cathodic protection

cladding, refractory,

electrical, instrumentation, automation,

steel structure buildings,

pipe racks,structure buildings erection

Kalkan HELVACI

Site Construction Manager/Consultant

Mail: adyosp@r.postjobfree.com ; adyosp@r.postjobfree.com Phone :+90-531-***-**-**(whatsApp)

CV-KALKAN HELVACI 6

2013 - 2014 Tokar & Mess JV Site Manager Naphtha Steam Cracking Plant Rewamping Project (Client: Petkim)

Manage&organization Mechanical -HSE-QA/QC disciplines

• Naphtha Steam Cracking boiler erection.

• Process piping

• Mechanical Works;

• Pressure vessels erection

• Pump erection

• Testing & reinstatements ; pre Commissioning works 2013 - 2013 APPA consultant Mechanical ConsultantCCPP 2X250MW STG, 8X125MW SCGT

(Client: MGH);Erbil, Iraq

Manage Organization Mechanical&çivil&E-I & HSE-QA/QC disciplines

• HRSG boilers erection,casing,coils

• Heavy lifting studies of coil packs with hydroulic jacking system.

• Stack &duckt,dumper erection-insulation-cladding works

• Forced air cooling unit erection

• Demi water system

• Process piping

• Testing,flashing and Commissioning works

2012 - 2012 TEKFEN Construction Construction Manager Yolöten Gas Refinery Plant (Client:Turkmengas)Turkmenistan Manage Organization Mechanical&civil&E-I & HSE-QA/QC disciplines

• Process piping (ug/og)

• Constand vessels erection

• Mechanical Works;

• E-I Works

• Testing & reinstatements ; pre Commissioning works 2009 - 2012 TGO Mechanical Construction Manager

Maritza 2 x330 MW PC Thermal Power Plant (EPC: AlstomPower.Client:AES) Galabovo, Bulgaria

Manage Organization Mechanical&civil&E-I & HSE-QA/QC disciplines

• Process piping (UG/AG)

• Mechanical Works Turbine hall

• ESP &ash handling system erection,Rewamp ash handling system

• Main cooling system piping&Mechanical Works

• Turbine hall-boiler HP,LP piping

• Utility Mechanical&piping works

• Testing & reinstatements ; pre Commissioning works

• Insulation&cladding works

Kalkan HELVACI

Site Construction Manager/Consultant

Mail: adyosp@r.postjobfree.com ; adyosp@r.postjobfree.com Phone :+90-531-***-**-**(whatsApp)

CV-KALKAN HELVACI 7

2007 - 2009 GATE Construction Manager

KMW Experimental Refinery (Client: AGIPENIGroup)

Kazakhstan

Pipe shop Construction Manager

• Pipe spool prefabrication CS,alloy and ss materials.total 850.000 wdi performed.

• Pipe painting shop works

• Stock yard handling

2006 - 2007 Peicc Construction Manager

Crude Oil Production Facility,Transportation and Stockking (Client:Zagross Group) Fishabur, North IRAQ

CRUDE OIL SYSTEM PIPE LINE,WELL GATHERING PIPING,STORAGE TANKS

• Piping from wells to speration unit.

• 14’’ pipe line-45km from speration unit to storage area.

• Storage tanks erection 5x25000m3

• Internal piping

• Testing,flashing,commissionig

2005 - 2006 Erenco (Eregli Steel Production) Construction Manager Blast Furnace Modernization Isdemir,Iskenderun, Turkey

Construction Manager blast furnace revamp Project. Planning Coordination Civil&E-In Mechanical and QA-QC disciplines

• Exist blast furnace demontaj and new body erection including cooling and refractor system.

• Hot ducts,water system,ore handling,melted iron flow channels system demolish&erection

• Poul Worth new gharging system set up

• New ore feeder,

• Cooling water system

• Melted iron flow channels

• Granule make up and dewatering system erection

2002 - 2004 GTT (Gama-Tekfen-Tokar) Boiler Construction Manager 4x360MW Afsin-Elbistan Power Plant,Project (Client: EUAS)Elbistan, Turkey Planning&coordination E-I&Mechanical and QA-QC disciplines

• Boiler erection (Babcock vertical boiler;critical pressure design) pressure and non pressure all components

• Water Wall

• Heat coils-ECO&SUPER HEATER&REHEATER

• Steam speration siklon system-separator

• Hot&fresh air&flue gas duckts(ID-FD duct line)

• HP,LP internal connection piping;main steam lines to türbine(alloy an CS materials)

• Steel structure

• Burners,PC ducts to burners

• Mills erection

• Slag extraction system

• Fly ash handling system

• Testing and pre commissioning

Kalkan HELVACI

Site Construction Manager/Consultant

Mail: adyosp@r.postjobfree.com ; adyosp@r.postjobfree.com Phone :+90-531-***-**-**(whatsApp)

CV-KALKAN HELVACI 8

1999 - 2002 Tokar Construction Mechanical Construction Manager Ford Otosan Car Factory Construction Golcuk/ Turkey

Planning&coordination E-I&Mechanical and QA-QC disciplines

• Pump house,skid equipments erection

• Fire fighting spirings, wet&dry system ;deluge valves and sense system

• HVAC system ducks,sheet Works

• Heating&cooling system piping

1997 - 1999 Guris Construction Boiler Lead Engineer 2x320MW Cayirhan Power Plant (Client:Avusturia Energy)Turkey

• Boiler erection (two pass vertical boiler) pressure and non pressure all components

• Water Wall

• Heat coils

• Steam speration siklon system

• Hot&fresh air&flue gas duckts

• HP,LP piping;internal and main steam lines to türbine(alloy an CS materials)

• Steel stracture

• Burners,PC ducts to burners

• Mills erection

• Slag extraction system

• Fly ash handling system

• Testing,flashingand pre commissioning

• FGD unit mechanical works

• FGD unit internal piping,flashing and pre commissioning. 1995 - 1996 Med Union Container Factory Lead Engineer of Fabrication İzmir, Turkey 20’ and 40’ freight containeers fabrication.- top&open types.

• Sand blast unit oparation

• Preparation planning of prefabrication parts(cutting bending)

• Erection skid manage

• Welding..all welding GMAW process

1993 - 1994 Tokar Construction Piping Lead Engineer 2x300MW Kemerkoy Power Plant (Client:Polish Energy)Turkey

• Piping of raw water line from dam.

• Hydrogen generation unit erection

1991 - 1992 Üstay Llc. Lead Engineer

Business Tower Building (Client: Mersin Municipality)Turkey Business tower building ;all Mechanical Works,plumbing

• HVAC units,compressore erection

• Fire fighting piping

• Heating cooling piping

• AHU-HR rotary type equipment erection

• Heat unit boilers erection

• HVAC duct sheet Works.



Contact this candidate