Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Corpus Christi, TX
Salary:
120,000/yr
Posted:
August 01, 2023

Contact this candidate

Resume:

M. Jill Tollett

618-***-****

Career Summary

Project Manager / Mechanical Engineer with 30 years of experience in the Construction, Refining and Petro Chemical Industry with a major emphasis on project management. Expertise includes technical research, budgeting, estimating, specifying, and purchasing equipment, multi discipline project management, daily maintenance, and long-term maintenance planning. Strong communication skills, with a serious proactive approach to meeting deadlines and budget control. Career Experience

Brown And Root Industrial Services

Ingleside, TX

Senior Project Engineer – Contract to Occidental Chemical – May 2018 to Present Managed Multi-disciplined Projects from Inception, Estimation, AFE Documentation, Engineering and Execution for Oxy Chemical Plant. Continuously managed 15 to 20 of various sizes ($20M - $2.5MM) in different stages of development simultaneously while providing support and development of new projects.

Maverick Engineering, Inc.

Corpus Christi, TX

Senior Project Manager - September 2011 to May 2018 Manages the preparation of Project Studies, Project Execution Plans, Preliminary Project Designs, Detailed Engineering and Design Work Packages, and includes customer reporting and internal manpower planning; primary interface point with the client; participate in client review and approval meetings as required. Provide management and direction for Civil / Structural, Mechanical / Piping, Instrument / Process Control and Electrical Engineering and Design for all assigned projects. S & R Concrete, Inc.

St. Louis, MO

Project Manager - June 2004 to September 2011

Coordinated day to day operation of small concrete flatwork construction company. Responsibilities included meeting with prospective clients, site evaluation, development of project scope, budget, and customer proposal. Generated project schedules spec’d and procured project materials, generated invoices processed all accounts payables, accounts receivables, payroll, and taxes. Ambitech Engineering Corporation

Roxana, IL

Project Manager – October 2002 to June 2004

Coordinated design, detailed engineering, and construction activities for multiple new tank installations at ConocoPhillips Wood Refinery. Developed work scopes, budgets and bid packages for all phases of new tank design and installation and existing tank turnarounds. Worked with construction coordinators and inspection to resolve field construction issues. Performed cost tracking and forecasting for all tank projects.

Project Manager – April 2003 to April 2004

Coordinated the design, procurement, and installation of multiple projects to facilitate the Hartford Integration Project at the ConocoPhillips Wood River Refinery. Developed work scope, budget, and schedule to separate and isolate 11 utilities from non operating sections of the plant. Premcor Refining Inc.

Hartford, IL

Project Manager - May 2001 to October 2002

Coordinated engineering activities for $300MM for multiple projects and refinery upgrades related to EPA mandated TIER II Reformulated Gasoline. Evaluated mechanical design drawings for piping systems and equipment. Resolved issues between fabrication, engineering consultants and field construction. Assisted in the development and monitoring of budget for projects. Utilities Process Engineer - April 2000 to May 2001 Supported daily operation of wastewater treatment plant, oil movements and support utilities for oil refinery. Developed work scopes, budgets, and schedules for capital upgrades. Supervised multiple tank cleanings and repairs. Coordinated and supervised the operation of plant centrifuge process of solid waste material and disposal.

Project Manager / Engineer - January 1995 to April 2000 Managed engineering and design of Small Capital and Expense Projects. Supported maintenance department for day to day maintenance issues. Supported Turnaround group with engineering documentation and research to facilitate repairs and upgrades as needed for refinery. Operations Field Engineer - May 1992 to January 1995 Supported the operating units with technical support. Assisted with development of P&ID’s, implementation of Management of Change system, training of entire plant to comply with OSHA 1910 regulations. Represented operations department during turnaround scope development and planning. Project Engineer - October 1991 to May 1992

Coordinated the design, fabrication, and installation of a plant wide $30MM Flare system. Fru-Con Construction Company - September 1988 to October 1991 Williamsburg, Va

Field Engineer - Detailed pipe for 60MM expansion of wastewater treatment plant. Specified and purchased equipment. Performed surveying for foundation placement and pipe layout for field crews. Education

Old Dominion University; Norfolk, Virginia

Bachelor of Science Mechanical Engineering Technology Graduated May 1988

Training

OSHA 30 Hour Construction Safety Course

UOP Refining Inspection Course

Penn State Wastewater Biology Course

Refining Process Services Introduction to Petroleum Processing ASNT Level I &II Visual Testing

ASNT Level I Ultrasonic Testing

Fire Safety Inc. Portable and Fixed Fire Extinguisher Training AICHE Management of Change

TTSI Conducting a Process Hazard Analysis



Contact this candidate