Post Job Free

Resume

Sign in

Quality Control High School

Location:
Mardan, Khyber Pakhtunkhwa, Pakistan
Salary:
3000us
Posted:
July 30, 2023

Contact this candidate

Resume:

AJMAL HUSSAIN

CONTACT

{B Aaabad Charbagh Swat KPK Pakistan

* *** **********

{8 Amatiussain99074@pmalicom

th 0108-1982

OBJECTIVE

To obtain a General Foreman postion

‘thin an organization volving or leasing

to supervisory responstites. Yo perform

‘many tasks efcenty, productively, work

‘wet with others and be better prepared to

‘eet goal of quality,

SKILLS

‘+ Proven experience as construction foreman

Indepth knowlege of construction procedures,

suipment and OSH Buielines

Understanding of lca and hye ytems

‘yt read dranings, plans and blueprints

{xcelent oranzatonal and leadership sls

‘uty to communkate ane repertefecively

‘Apts ath

Froblem song abies

Good physical conten ar tamira

High school diptoma

ADDITIONAL INFORMATION

1 Ucensed Car diver

Rox Pakistandrvirgicerse

LANGUAGE

1 English, Arable, Urdu ast

Ey

Et

‘AvFazan Tracing & General Contracting Company Saud July 2008. May

Aaba 2007

{7 Coorsinate tasks according to pores and plans

1 Produce schedules and montor attendance of crew

1 locate general a diy esponsiiies

1 Supervise and rain workers ane vadespeople

17 Eorure manpower and resources are aerate

7 Guarantee al safer precautions are quality standard are

17 Supervise the ut of machinery and equipment

{7 Monitor expenditure and ensure remains within budget

7 Resolve problems when they arse

7 Report on progress to managers, engineers et.

82 Construction ( Government Contractors) Swat KFK Feb2010-Dec

Pakistan 2020

Site Foremary Supersizor

7 verse and maintain a safe productive work environment

/Mietain quality control throughout the project

1 trsure tha projets are on schedule

Track paperwork and documetation

Maina daly records

7 Provide asstance to construction workers as needed

wn and (Agriculture Far

Farmer (Agree Faring)

Pant, inspect, and harvest crops. liga farm so¥ and maintain

<ches o pipes and pumps. Operate and serie farm

‘machinery and tons Apply feliz or pesticide solutions to

Control ect, ing), and woes

ing) 202 - current

Foreman of the project of Ariery 8a

School Aiagh Saud Aeabia,

mand the Natonal New Guard Muary

“These 2 projects have been under the supervion ofthe Joint Engineering Team of

(OPM SANG JET)

In these projects have boon overseeing may activites involving Maton aed

Concrete works, long with ste earth work actives for ty tectrvques and

srading ee



Contact this candidate