AJMAL HUSSAIN
CONTACT
{B Aaabad Charbagh Swat KPK Pakistan
{8 Amatiussain99074@pmalicom
th 0108-1982
OBJECTIVE
To obtain a General Foreman postion
‘thin an organization volving or leasing
to supervisory responstites. Yo perform
‘many tasks efcenty, productively, work
‘wet with others and be better prepared to
‘eet goal of quality,
SKILLS
‘+ Proven experience as construction foreman
Indepth knowlege of construction procedures,
suipment and OSH Buielines
Understanding of lca and hye ytems
‘yt read dranings, plans and blueprints
{xcelent oranzatonal and leadership sls
‘uty to communkate ane repertefecively
‘Apts ath
Froblem song abies
Good physical conten ar tamira
High school diptoma
ADDITIONAL INFORMATION
1 Ucensed Car diver
Rox Pakistandrvirgicerse
LANGUAGE
1 English, Arable, Urdu ast
Ey
Et
‘AvFazan Tracing & General Contracting Company Saud July 2008. May
Aaba 2007
{7 Coorsinate tasks according to pores and plans
1 Produce schedules and montor attendance of crew
1 locate general a diy esponsiiies
1 Supervise and rain workers ane vadespeople
17 Eorure manpower and resources are aerate
7 Guarantee al safer precautions are quality standard are
17 Supervise the ut of machinery and equipment
{7 Monitor expenditure and ensure remains within budget
7 Resolve problems when they arse
7 Report on progress to managers, engineers et.
82 Construction ( Government Contractors) Swat KFK Feb2010-Dec
Pakistan 2020
Site Foremary Supersizor
7 verse and maintain a safe productive work environment
/Mietain quality control throughout the project
1 trsure tha projets are on schedule
Track paperwork and documetation
Maina daly records
7 Provide asstance to construction workers as needed
wn and (Agriculture Far
Farmer (Agree Faring)
Pant, inspect, and harvest crops. liga farm so¥ and maintain
<ches o pipes and pumps. Operate and serie farm
‘machinery and tons Apply feliz or pesticide solutions to
Control ect, ing), and woes
ing) 202 - current
Foreman of the project of Ariery 8a
School Aiagh Saud Aeabia,
mand the Natonal New Guard Muary
“These 2 projects have been under the supervion ofthe Joint Engineering Team of
(OPM SANG JET)
In these projects have boon overseeing may activites involving Maton aed
Concrete works, long with ste earth work actives for ty tectrvques and
srading ee