ADNOC Classification: Need-To-Know
CURRICULUM VITAE
Name Naveen Kumar
Position Title Advanced Rigger
Nationality Indian
DOB 25/10/1987
Home of record Chennai, Tamil Nadu, India
Contact details +971*********, +919*********
adyiw4@r.postjobfree.com
adyiw4@r.postjobfree.com
Skype id Naveen Kumar Jeeva Jothi
Passport details Passport Number: Z6571502
Expiry date : 07/03/2032
Place of issue : Chennai
Qualification
• Senior Secondary School Exam
• Industrial training institute {mechanical fitter}
• Computer Skills: MS Office
CAREER
CAREERSUMMARY
SUMMARY
•• Total
Total16
16years’
years’experience
experienceininfield
fieldofofRigging,
Rigging,Lifting,
Lifting,Mechanical
Mechanicalconstruction,
construction,structural,
structural, commissioning,
piping etc. (2 Yrs.
commissioning, etc. (2 Yrs.inexperience
experience
piping India & 14in India
Yrs. & 14 Yrs.inexperience
experience Abroad) in Abroad)
•• ERECTIONs
ERECTIONs: :Pipeline,
Pipeline,Storage
StorageTank,
Tank,Vessels,
Vessels,Columns,
Columns,Turbine,
Turbine,Reactors,
Reactors,Heat
Heat
Exchanger,
Exchanger,Furnace,
Furnace,Fin
Finfan
fanCooler,
Cooler,Platform,
Platform,Gratings,
Gratings,Structure,
Structure,Beams,
Beams,Flares,
Flares,Different
DifferentTypes
Typesofof
Valves
ValvesLike
LikeGate,
Gate,Globe,
Globe,Butterfly,
Butterfly,Control,
Control,PRV,
PRV,NRV,
NRV,Arv
ArvEtc.
Etc.
•• LIFTINGS:
LIFTINGS:Turbine,
Turbine,Vessel,
Vessel,Pipes,
Pipes,Rotor
Rotorlifting,
lifting,Fin
Finpan
pancooler,
cooler,Heavy
Heavycompressors,
compressors,Motors,
Motors,Heavy
HeavyTon
Ton
Valve
ValveLifting
Liftingwith
withActuators,
Actuators,Spool
SpoolPieces,
Pieces,Containers,
Containers,Photo
PhotoCabins,
Cabins,Exchanger
Exchanger&&Exchanger
ExchangerBundles
Bundles
Removal
RemovalandandReinstall
ReinstallAfter
AfterCalibration,
Calibration,Level
LevelGauges
Gaugesand
andBlinding
Blindingand
andDe-Blinding.
De-Blinding.
•• IN
INCONSTRUCTION
CONSTRUCTIONHANDLED
HANDLED: :All
AllTypes
TypesofofErections
ErectionsLike
LikePipeline,
Pipeline,Tank,
Tank,Vessel,
Vessel,Column,
Column,Furnace,
Furnace,
Reactor,
Reactor,Structure,
Structure,Beam,
Beam,Platform,
Platform,Gratings,
Gratings,Valves,
Valves,Turbine,
Turbine,Beam
BeamandandExchangers
ExchangersEtc.
Etc. Involved
InvolvedInIn
Pre-Commissioning
Pre-Commissioning&&Commissioning
CommissioningActivity,
Activity,Given
GivenRigging
RiggingAssistance
Assistancefor
forHydro
HydroTesting,
Testing,Air
AirBlowing
Blowing&&
Blasting,
Blasting,Leak
LeakTest,
Test,Pressure
PressureTest,
Test,Chemical
ChemicalCleaning,
Cleaning,Oil
OilFlushing,
Flushing,Pigging
Pigging&Nitrogen
&NitrogenPurging.
Purging.
•• IN
INMAINTENANCE
MAINTENANCEHANDLED
HANDLED: : Removal
Removaland
andReinstall
Reinstall(After
(AfterCalibration)
Calibration)Of
OfValves,
Valves,Pumps,
Pumps,Motors,
Motors,
Tube
TubeBundles,
Bundles,Compressors,
Compressors,Spool
SpoolPeace’s,
Peace’s,Level
LevelGauges,
Gauges,Shaft
Shaftand
and
Attending
AttendingBreakdowns
BreakdownsWith
WithVendors
VendorsLike,
Like,“Ge
“GeEnergy
EnergyCompany
Company(U.S.A),
(U.S.A),“Ebara
“Ebara
Company
Company(Japan)”,
(Japan)”,Kobelco
KobelcoCompany
Company(Japan)”,
(Japan)”,Ital
ItalKrane
Krane(Italy),
(Italy),Maccha
MacchaCompany
Company
(Italy)
(Italy)And
And“Alstom
“AlstomCompany
Company(Italy
(Italy)”.
)”. And
AndAttended
AttendedAllAllP.P.M
P.P.MJobs.
Jobs.Preparing
PreparingProof
Proof
ADNOC Classification: Need-To-Know
LoadLoad
TestTest for E.O.T
for E.O.T Cranes,
Cranes, Gantry
Gantry Cranes,
Cranes, SemiSemi
GantryGantry Cranes,
Cranes, Monorails,
Monorails, Beams,
Beams, Mobile
Mobile cranes,
cranes,
Forklifts
Forklifts and and All Lifting
All Lifting GearsGears
withwith Inspection
Inspection Companies
Companies LikeLike Bureau
Bureau Veritas,
Veritas, Velossi,
Velossi, Germanic
Germanic her
her
Lloyd. Lloyd.
IN OFFSHORE:
IN OFFSHORE: Handled
Handled Campaign,
Campaign, Shutdown
Shutdown & Construction
& Construction JobsJobs
and and Loading
Loading and and Offloading
Offloading of
of Materials from supply vessels, Performed Lifting Operation
Materials from supply vessels, Performed Lifting Operation Maintenance Maintenance
Shutdown.
Shutdown. Performed
Performed Lifting
Lifting Operations
Operations of Lifting
of Lifting and and Material
Material Handling
Handling Equipment,
Equipment, Cranes,
Cranes, Overhead
Overhead Cranes, Lifting Gears. Operates Pull Lifts, Chain Block, Rope Block,
Cranes, Lifting Gears. Operates Pull Lifts, Chain Block, Rope Block, Pneumatics/ Electra Winches. Pneumatics/ Electra
Winches.
Performed Performed
Rigging DutiesRigging Duties onStatic
on Dismantling Dismantling
Equipment Static Equipment
Like Removal Like Removal Bundle,
of Exchanger of Exchanger
Valves
Bundle, Valves Pipe Work and Equipment Internals, Assisted Pipe Fitter and Helper
Pipe Work and Equipment Internals, Assisted Pipe Fitter and Helper in Spading. Also Erected Structures, in Spading.
AlsoPipes,
Beams, Erected Structures,
Valves, PlatformsBeams,
Etc. Pipes, Valves,
Flare Lifting Platforms
and Etc. Flare
Fixing, Laying Lifting
Hoses fromand Fixing, to
Platform Laying
BoatsHoses
for
from Platform to Boats for Chemical Transaction And Lifted Chemical
Chemical Transaction And Lifted Chemical Tanks from Boats to Deck & Platform, Attended EachTanks from Boats to Deck
&
& Shutdowns.
Every Platform, Attended Each Installation
All Offshore & Every Shutdowns.
Handled VeryAll Offshore
Well. Installation Handled Very Well.
• •IN OFFSITES
IN OFFSITES : Given
: Given Rigging
Rigging Assistance
Assistance to Loading
to Loading Harms
Harms in Berths,
in Berths, To Loading
To Loading LNGLNG To Ships,
To Ships, And for
And Tanks
Storage for Storage Tanksand
to Remove to Remove
Reinstalland Pumps. the Pumps.
theReinstall
• •IN SHUTDOWN
IN SHUTDOWN HANDLED
HANDLED : All :Equipment’s
All Equipment’s Removal
Removal and and Reinstall
Reinstall afterafter Calibration.
Calibration.
• •I Have
I Have Construction,
Construction, Maintenance,
Maintenance, Offshore,
Offshore, Offsite
Offsite and and Shutdown
Shutdown Experience
Experience in Gas
in Oil, Oil, Gas
and and
Petrochemical
Petrochemical Plants.
Plants. CORE CORE COMPETENCIES:
COMPETENCIES:
• •Experience
Experience in petrochemical
in petrochemical plantplant project.
project.
• •Worked
Workedin oilinand
oil and gas industries
gas industries
• •Extensive
Extensive experience in erection
experience in erection of boilers
of boilers
• •gas turbines
gas turbines
• •fire gas
fire stacks
gas stacks
• •columns,
columns, pressure
pressure vessels,
vessels,
• •pipelines
pipelines
• •valves
valves
and and storage
storage tanks,
tanks,
• •Modules
Modules and jackets.
and jackets.
• •soundsound knowledge
knowledge of inspection
of inspection and and maintenance
maintenance of lifting
of lifting toolstools
and and tackles
tackles
• •Preparing
Preparing Lifting
Lifting planplan as category
as per per category (non(non
of lifts
of lifts -routine,
-routine, non-
non- routine
routine simple,
simple, complicated
andcomplicated and complex lifts)
complex lifts)
TRAININGS
• T-BOSIET (OPITO) OFFSHORE TRAINING from Emirates Technical & Safety Development
Center (Abu Dhabi).
• Advanced rigger level 3 {sparrows training center}
• OPITO-H2S & BA Awareness, TRAINING from Emirates Technical & Safety Development
Center (Abu Dhabi).
• WMS (work Management System-Permit)
• PTW Basic, PTW Signatory, Interactive Safety Induction Course,
• Banksman And Rigging & Slinging Trainings for Level 3 Completed
• Overhead crane operator {sparrows offshore training center}
ADNOC Classification: Need-To-Know
EMPLAYMENT EXPERIENCE
Nov 2019 TO TILL DATE Abu Dhabi National Oil Company ABUDHABI
{Sparrows offshore}
Advanced Rigger
Projects offshore campaign, construction & maintenance
Role:
• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.
• Promote safe handling and lifting operation referring COMPANY HSE policy and international
standard, review engineering calculation complicated and complex lifts
• Supervise and ensure the safe operation of cranes, weight estimation and special lifts
• Preparing PTW for daily scopes.
• Review complicated and complex lift plan and attend lifts.
• Perform condition check and fitness for purpose on lifting appliances, CCUs and evaluate their
utilization on site.
• Provide lifting and handling expertise advice to all HSE Site Authority (HSE-SA) and HSESA-Delegates.
• To be involved in plans internal audits of the lifting operations, participate in lifting operations
incident investigation and analyses.
• Assessment of completed jobs.
• Risk assessment and hazard identification.
• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of
workers and material handled, using hand signal or radio.
March 2019 to July 2019 Qatar petroleum QATAR {Doha petroleum
construction}
RIGGER LEVEL 3
Projects offshore campaign, Shut down & maintenance
Role:
• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.
• Promote safe handling and lifting operation referring COMPANY HSE policy and international
standard, review engineering calculation complicated and complex lifts
• Supervise and ensure the safe operation of cranes, weight estimation and special lifts
• Preparing PTW for daily scopes.
• Review complicated and complex lift plan and attend lifts.
• Perform condition check and fitness for purpose on lifting appliances, CCUs and evaluate their
utilization on site.
• Provide lifting and handling expertise advice to all HSE Site Authority (HSE-SA) and HSESA-Delegates.
• To be involved in plans internal audits of the lifting operations, participate in lifting operations
incident investigation and analyses.
ADNOC Classification: Need-To-Know
• Assessment of completed jobs.
• Risk assessment and hazard identification.
• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of
workers and material handled, using hand signal or radio.
Aug 2018 TO JAN 2019 Equate petrochemical KUWAIT {EDAC
Engineering}
LEAD RIGGER
Projects onshore campaign, shut down & maintenance
Role:
• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.
• Promote safe handling and lifting operation referring COMPANY HSE policy and international
standard, review engineering calculation complicated and complex lifts
• Supervise and ensure the safe operation of cranes, weight estimation and special lifts
• Preparing PTW for daily scopes.
• Review complicated and complex lift plan and attend lifts.
• Perform condition check and fitness for purpose on lifting appliances, CCUs and evaluate their
utilization on site.
• Provide lifting and handling expertise advice to all HSE Site Authority (HSE-SA) and HSESA-Delegates.
• To be involved in plans internal audits of the lifting operations, participate in lifting operations
incident investigation and analyses.
• Assessment of completed jobs.
• Risk assessment and hazard identification.
• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of
workers and material handled, using hand signal or radio.
March 2018 TO June 2018 Qatar petroleum QATAR {Doha petroleum
construction}
RIGGER LEVEL 3
Projects offshore campaign, Shut down & maintenance
Role:
• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.
• Promote safe handling and lifting operation referring COMPANY HSE policy and international
standard, review engineering calculation complicated and complex lifts
• Supervise and ensure the safe operation of cranes, weight estimation and special lifts
• Preparing PTW for daily scopes.
• Review complicated and complex lift plan and attend lifts.
• Perform condition check and fitness for purpose on lifting appliances, CCUs and evaluate their
utilization on site.
ADNOC Classification: Need-To-Know
• Provide lifting and handling expertise advice to all HSE Site Authority (HSE-SA) and HSESA-Delegates.
• To be involved in plans internal audits of the lifting operations, participate in lifting operations
incident investigation and analyses.
• Assessment of completed jobs.
• Risk assessment and hazard identification.
• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of
workers and material handled, using hand signal or radio.
Jan 2018 TO Feb 2018 Equate petrochemical KUWAIT {ALMEER
Engineering}
LEAD RIGGER
Projects onshore campaign, shut down & maintenance
Role:
• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.
• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of
workers and material handled, using hard signal or radio.
• Supervise and ensure the safe operation of cranes, positioning and turning of loads, weight
estimation and special lifts.
• Preparing PTW for daily scopes.
• Preparing daily time sheet for rigging group
July 2017 TO Dec 2017 Equate petrochemical KUWAIT {HOT
Engineering}
LEAD RIGGER
Projects onshore campaign, shut down & maintenance
Role:
• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.
• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of
workers and material handled, using hard signal or radio.
• Supervise and ensure the safe operation of cranes, positioning and turning of loads, weight
estimation and special lifts.
• Preparing PTW for daily scopes.
• Preparing daily time sheet for rigging group
ADNOC Classification: Need-To-Know
Jan 2017 TO May 2017 Kuwait oil company KUWAIT {Penta Global
Engineering}
LEAD RIGGER
Projects onshore campaign, project & maintenance
Role:
• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.
• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of
workers and material handled, using hard signal or radio.
• Supervise and ensure the safe operation of cranes, positioning and turning of loads, weight
estimation and special lifts.
• Preparing PTW for daily scopes.
• Preparing daily time sheet for rigging group
Sep 2016 TO Dec 2016 Equate petrochemical KUWAIT {STS
Engineering}
LEAD Rigger
Projects onshore campaign, Turn around shut down &
maintenance
Role:
• Carryout daily task as per planned schedule.
• Visual inspection of lifting gears and equipment’s before and after the job
• Attending Toolbox Talk
• Ensuring color coding of lifting gears and equipment’s
• Allocating jobs to rigging teams
• Spotting out Hazards and taking control measures for that
• Making sure that warning tapes and sign boards are in place at working area
• Inspecting ground level for crane setting
• Checking all certificates are valid prior to start the task
ADNOC Classification: Need-To-Know
Apr 2016 TO Aug 2016 QATAR GAS QATAR {Descon Engineering}
Rigger
Projects onshore campaign, Turn around shut down &
maintenance
Role:
• Carryout daily task as per planned schedule.
• Visual inspection of lifting gears and equipment’s before and after the job
• Attending Toolbox Talk
• Ensuring color coding of lifting gears and equipment’s
• Allocating jobs to rigging teams
• Spotting out Hazards and taking control measures for that
• Making sure that warning tapes and sign boards are in place at working area
• Inspecting ground level for crane setting
• Checking all certificates are valid prior to start the task
Mar 2015 TO Jan 2016 DP WORLD CHENNAI {JM BOXI Engineering}
Rigging foreman
Projects Chennai container terminal
Role:
• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.
• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of
workers and material handled, using hard signal or radio.
• Supervise and ensure the safe operation of cranes, positioning and turning of loads, weight
estimation and special lifts.
• Preparing PTW for daily scopes.
• Preparing daily time sheet for rigging group
June 2013 TO Jan 2015 Kuwait National oil company KUWAIT {Gulf spic
Engineering}
Rigger
Projects onshore campaign, project & maintenance
ADNOC Classification: Need-To-Know
Role:
• Carryout daily task as per planned schedule.
• Visual inspection of lifting gears and equipment’s before and after the job
• Attending Toolbox Talk
• Ensuring color coding of lifting gears and equipment’s
• Allocating jobs to rigging teams
• Spotting out Hazards and taking control measures for that
• Making sure that warning tapes and sign boards are in place at working area
• Inspecting ground level for crane setting
• Checking all certificates are valid prior to start the task
Mar 2011 TO Jan 2013 DP WORLD CHENNAI {JM BOXI Engineering}
Rigging foreman
Projects Chennai container terminal
Role:
• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.
• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of
workers and material handled, using hard signal or radio.
• Supervise and ensure the safe operation of cranes, positioning and turning of loads, weight
estimation and special lifts.
• Preparing PTW for daily scopes.
• Preparing daily time sheet for rigging group
Aug 2007 TO Jan 2011 Bahrain petroleum company {Chapo
Engineering} Rigger
Projects onshore campaign, project & maintenance
Role:
• Carryout daily task as per planned schedule.
• Visual inspection of lifting gears and equipment’s before and after the job
• Attending Toolbox Talk
• Ensuring color coding of lifting gears and equipment’s
• Allocating jobs to rigging teams
• Spotting out Hazards and taking control measures for that
• Making sure that warning tapes and sign boards are in place at working area
• Inspecting ground level for crane setting
• Checking all certificates are valid prior to start the task
ADNOC Classification: Need-To-Know
June 2005 TO July 2007 DP WORLD CHENNAI {JM BOXI Engineering}
Rigger
Projects Chennai container terminal
Role:
• Carryout daily task as per planned schedule.
• Visual inspection of lifting gears and equipment’s before and after the job
• Attending Toolbox Talk
• Ensuring color coding of lifting gears and equipment’s
• Allocating jobs to rigging teams
• Spotting out Hazards and taking control measures for that
• Making sure that warning tapes and sign boards are in place at working area
• Inspecting ground level for crane setting
• Checking all certificates are valid prior to start the task