Post Job Free

Resume

Sign in

Risk Assessment Pipe Fitter

Location:
Chennai, Tamil Nadu, India
Posted:
July 26, 2023

Contact this candidate

Resume:

ADNOC Classification: Need-To-Know

CURRICULUM VITAE

Name Naveen Kumar

Position Title Advanced Rigger

Nationality Indian

DOB 25/10/1987

Home of record Chennai, Tamil Nadu, India

Contact details +971*********, +919*********

adyiw4@r.postjobfree.com

adyiw4@r.postjobfree.com

Skype id Naveen Kumar Jeeva Jothi

Passport details Passport Number: Z6571502

Expiry date : 07/03/2032

Place of issue : Chennai

Qualification

• Senior Secondary School Exam

• Industrial training institute {mechanical fitter}

• Computer Skills: MS Office

CAREER

CAREERSUMMARY

SUMMARY

•• Total

Total16

16years’

years’experience

experienceininfield

fieldofofRigging,

Rigging,Lifting,

Lifting,Mechanical

Mechanicalconstruction,

construction,structural,

structural, commissioning,

piping etc. (2 Yrs.

commissioning, etc. (2 Yrs.inexperience

experience

piping India & 14in India

Yrs. & 14 Yrs.inexperience

experience Abroad) in Abroad)

•• ERECTIONs

ERECTIONs: :Pipeline,

Pipeline,Storage

StorageTank,

Tank,Vessels,

Vessels,Columns,

Columns,Turbine,

Turbine,Reactors,

Reactors,Heat

Heat

Exchanger,

Exchanger,Furnace,

Furnace,Fin

Finfan

fanCooler,

Cooler,Platform,

Platform,Gratings,

Gratings,Structure,

Structure,Beams,

Beams,Flares,

Flares,Different

DifferentTypes

Typesofof

Valves

ValvesLike

LikeGate,

Gate,Globe,

Globe,Butterfly,

Butterfly,Control,

Control,PRV,

PRV,NRV,

NRV,Arv

ArvEtc.

Etc.

•• LIFTINGS:

LIFTINGS:Turbine,

Turbine,Vessel,

Vessel,Pipes,

Pipes,Rotor

Rotorlifting,

lifting,Fin

Finpan

pancooler,

cooler,Heavy

Heavycompressors,

compressors,Motors,

Motors,Heavy

HeavyTon

Ton

Valve

ValveLifting

Liftingwith

withActuators,

Actuators,Spool

SpoolPieces,

Pieces,Containers,

Containers,Photo

PhotoCabins,

Cabins,Exchanger

Exchanger&&Exchanger

ExchangerBundles

Bundles

Removal

RemovalandandReinstall

ReinstallAfter

AfterCalibration,

Calibration,Level

LevelGauges

Gaugesand

andBlinding

Blindingand

andDe-Blinding.

De-Blinding.

•• IN

INCONSTRUCTION

CONSTRUCTIONHANDLED

HANDLED: :All

AllTypes

TypesofofErections

ErectionsLike

LikePipeline,

Pipeline,Tank,

Tank,Vessel,

Vessel,Column,

Column,Furnace,

Furnace,

Reactor,

Reactor,Structure,

Structure,Beam,

Beam,Platform,

Platform,Gratings,

Gratings,Valves,

Valves,Turbine,

Turbine,Beam

BeamandandExchangers

ExchangersEtc.

Etc. Involved

InvolvedInIn

Pre-Commissioning

Pre-Commissioning&&Commissioning

CommissioningActivity,

Activity,Given

GivenRigging

RiggingAssistance

Assistancefor

forHydro

HydroTesting,

Testing,Air

AirBlowing

Blowing&&

Blasting,

Blasting,Leak

LeakTest,

Test,Pressure

PressureTest,

Test,Chemical

ChemicalCleaning,

Cleaning,Oil

OilFlushing,

Flushing,Pigging

Pigging&Nitrogen

&NitrogenPurging.

Purging.

•• IN

INMAINTENANCE

MAINTENANCEHANDLED

HANDLED: : Removal

Removaland

andReinstall

Reinstall(After

(AfterCalibration)

Calibration)Of

OfValves,

Valves,Pumps,

Pumps,Motors,

Motors,

Tube

TubeBundles,

Bundles,Compressors,

Compressors,Spool

SpoolPeace’s,

Peace’s,Level

LevelGauges,

Gauges,Shaft

Shaftand

and

Attending

AttendingBreakdowns

BreakdownsWith

WithVendors

VendorsLike,

Like,“Ge

“GeEnergy

EnergyCompany

Company(U.S.A),

(U.S.A),“Ebara

“Ebara

Company

Company(Japan)”,

(Japan)”,Kobelco

KobelcoCompany

Company(Japan)”,

(Japan)”,Ital

ItalKrane

Krane(Italy),

(Italy),Maccha

MacchaCompany

Company

(Italy)

(Italy)And

And“Alstom

“AlstomCompany

Company(Italy

(Italy)”.

)”. And

AndAttended

AttendedAllAllP.P.M

P.P.MJobs.

Jobs.Preparing

PreparingProof

Proof

ADNOC Classification: Need-To-Know

LoadLoad

TestTest for E.O.T

for E.O.T Cranes,

Cranes, Gantry

Gantry Cranes,

Cranes, SemiSemi

GantryGantry Cranes,

Cranes, Monorails,

Monorails, Beams,

Beams, Mobile

Mobile cranes,

cranes,

Forklifts

Forklifts and and All Lifting

All Lifting GearsGears

withwith Inspection

Inspection Companies

Companies LikeLike Bureau

Bureau Veritas,

Veritas, Velossi,

Velossi, Germanic

Germanic her

her

Lloyd. Lloyd.

IN OFFSHORE:

IN OFFSHORE: Handled

Handled Campaign,

Campaign, Shutdown

Shutdown & Construction

& Construction JobsJobs

and and Loading

Loading and and Offloading

Offloading of

of Materials from supply vessels, Performed Lifting Operation

Materials from supply vessels, Performed Lifting Operation Maintenance Maintenance

Shutdown.

Shutdown. Performed

Performed Lifting

Lifting Operations

Operations of Lifting

of Lifting and and Material

Material Handling

Handling Equipment,

Equipment, Cranes,

Cranes, Overhead

Overhead Cranes, Lifting Gears. Operates Pull Lifts, Chain Block, Rope Block,

Cranes, Lifting Gears. Operates Pull Lifts, Chain Block, Rope Block, Pneumatics/ Electra Winches. Pneumatics/ Electra

Winches.

Performed Performed

Rigging DutiesRigging Duties onStatic

on Dismantling Dismantling

Equipment Static Equipment

Like Removal Like Removal Bundle,

of Exchanger of Exchanger

Valves

Bundle, Valves Pipe Work and Equipment Internals, Assisted Pipe Fitter and Helper

Pipe Work and Equipment Internals, Assisted Pipe Fitter and Helper in Spading. Also Erected Structures, in Spading.

AlsoPipes,

Beams, Erected Structures,

Valves, PlatformsBeams,

Etc. Pipes, Valves,

Flare Lifting Platforms

and Etc. Flare

Fixing, Laying Lifting

Hoses fromand Fixing, to

Platform Laying

BoatsHoses

for

from Platform to Boats for Chemical Transaction And Lifted Chemical

Chemical Transaction And Lifted Chemical Tanks from Boats to Deck & Platform, Attended EachTanks from Boats to Deck

&

& Shutdowns.

Every Platform, Attended Each Installation

All Offshore & Every Shutdowns.

Handled VeryAll Offshore

Well. Installation Handled Very Well.

• •IN OFFSITES

IN OFFSITES : Given

: Given Rigging

Rigging Assistance

Assistance to Loading

to Loading Harms

Harms in Berths,

in Berths, To Loading

To Loading LNGLNG To Ships,

To Ships, And for

And Tanks

Storage for Storage Tanksand

to Remove to Remove

Reinstalland Pumps. the Pumps.

theReinstall

• •IN SHUTDOWN

IN SHUTDOWN HANDLED

HANDLED : All :Equipment’s

All Equipment’s Removal

Removal and and Reinstall

Reinstall afterafter Calibration.

Calibration.

• •I Have

I Have Construction,

Construction, Maintenance,

Maintenance, Offshore,

Offshore, Offsite

Offsite and and Shutdown

Shutdown Experience

Experience in Gas

in Oil, Oil, Gas

and and

Petrochemical

Petrochemical Plants.

Plants. CORE CORE COMPETENCIES:

COMPETENCIES:

• •Experience

Experience in petrochemical

in petrochemical plantplant project.

project.

• •Worked

Workedin oilinand

oil and gas industries

gas industries

• •Extensive

Extensive experience in erection

experience in erection of boilers

of boilers

• •gas turbines

gas turbines

• •fire gas

fire stacks

gas stacks

• •columns,

columns, pressure

pressure vessels,

vessels,

• •pipelines

pipelines

• •valves

valves

and and storage

storage tanks,

tanks,

• •Modules

Modules and jackets.

and jackets.

• •soundsound knowledge

knowledge of inspection

of inspection and and maintenance

maintenance of lifting

of lifting toolstools

and and tackles

tackles

• •Preparing

Preparing Lifting

Lifting planplan as category

as per per category (non(non

of lifts

of lifts -routine,

-routine, non-

non- routine

routine simple,

simple, complicated

andcomplicated and complex lifts)

complex lifts)

TRAININGS

• T-BOSIET (OPITO) OFFSHORE TRAINING from Emirates Technical & Safety Development

Center (Abu Dhabi).

• Advanced rigger level 3 {sparrows training center}

• OPITO-H2S & BA Awareness, TRAINING from Emirates Technical & Safety Development

Center (Abu Dhabi).

• WMS (work Management System-Permit)

• PTW Basic, PTW Signatory, Interactive Safety Induction Course,

• Banksman And Rigging & Slinging Trainings for Level 3 Completed

• Overhead crane operator {sparrows offshore training center}

ADNOC Classification: Need-To-Know

EMPLAYMENT EXPERIENCE

Nov 2019 TO TILL DATE Abu Dhabi National Oil Company ABUDHABI

{Sparrows offshore}

Advanced Rigger

Projects offshore campaign, construction & maintenance

Role:

• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.

• Promote safe handling and lifting operation referring COMPANY HSE policy and international

standard, review engineering calculation complicated and complex lifts

• Supervise and ensure the safe operation of cranes, weight estimation and special lifts

• Preparing PTW for daily scopes.

• Review complicated and complex lift plan and attend lifts.

• Perform condition check and fitness for purpose on lifting appliances, CCUs and evaluate their

utilization on site.

• Provide lifting and handling expertise advice to all HSE Site Authority (HSE-SA) and HSESA-Delegates.

• To be involved in plans internal audits of the lifting operations, participate in lifting operations

incident investigation and analyses.

• Assessment of completed jobs.

• Risk assessment and hazard identification.

• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of

workers and material handled, using hand signal or radio.

March 2019 to July 2019 Qatar petroleum QATAR {Doha petroleum

construction}

RIGGER LEVEL 3

Projects offshore campaign, Shut down & maintenance

Role:

• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.

• Promote safe handling and lifting operation referring COMPANY HSE policy and international

standard, review engineering calculation complicated and complex lifts

• Supervise and ensure the safe operation of cranes, weight estimation and special lifts

• Preparing PTW for daily scopes.

• Review complicated and complex lift plan and attend lifts.

• Perform condition check and fitness for purpose on lifting appliances, CCUs and evaluate their

utilization on site.

• Provide lifting and handling expertise advice to all HSE Site Authority (HSE-SA) and HSESA-Delegates.

• To be involved in plans internal audits of the lifting operations, participate in lifting operations

incident investigation and analyses.

ADNOC Classification: Need-To-Know

• Assessment of completed jobs.

• Risk assessment and hazard identification.

• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of

workers and material handled, using hand signal or radio.

Aug 2018 TO JAN 2019 Equate petrochemical KUWAIT {EDAC

Engineering}

LEAD RIGGER

Projects onshore campaign, shut down & maintenance

Role:

• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.

• Promote safe handling and lifting operation referring COMPANY HSE policy and international

standard, review engineering calculation complicated and complex lifts

• Supervise and ensure the safe operation of cranes, weight estimation and special lifts

• Preparing PTW for daily scopes.

• Review complicated and complex lift plan and attend lifts.

• Perform condition check and fitness for purpose on lifting appliances, CCUs and evaluate their

utilization on site.

• Provide lifting and handling expertise advice to all HSE Site Authority (HSE-SA) and HSESA-Delegates.

• To be involved in plans internal audits of the lifting operations, participate in lifting operations

incident investigation and analyses.

• Assessment of completed jobs.

• Risk assessment and hazard identification.

• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of

workers and material handled, using hand signal or radio.

March 2018 TO June 2018 Qatar petroleum QATAR {Doha petroleum

construction}

RIGGER LEVEL 3

Projects offshore campaign, Shut down & maintenance

Role:

• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.

• Promote safe handling and lifting operation referring COMPANY HSE policy and international

standard, review engineering calculation complicated and complex lifts

• Supervise and ensure the safe operation of cranes, weight estimation and special lifts

• Preparing PTW for daily scopes.

• Review complicated and complex lift plan and attend lifts.

• Perform condition check and fitness for purpose on lifting appliances, CCUs and evaluate their

utilization on site.

ADNOC Classification: Need-To-Know

• Provide lifting and handling expertise advice to all HSE Site Authority (HSE-SA) and HSESA-Delegates.

• To be involved in plans internal audits of the lifting operations, participate in lifting operations

incident investigation and analyses.

• Assessment of completed jobs.

• Risk assessment and hazard identification.

• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of

workers and material handled, using hand signal or radio.

Jan 2018 TO Feb 2018 Equate petrochemical KUWAIT {ALMEER

Engineering}

LEAD RIGGER

Projects onshore campaign, shut down & maintenance

Role:

• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.

• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of

workers and material handled, using hard signal or radio.

• Supervise and ensure the safe operation of cranes, positioning and turning of loads, weight

estimation and special lifts.

• Preparing PTW for daily scopes.

• Preparing daily time sheet for rigging group

July 2017 TO Dec 2017 Equate petrochemical KUWAIT {HOT

Engineering}

LEAD RIGGER

Projects onshore campaign, shut down & maintenance

Role:

• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.

• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of

workers and material handled, using hard signal or radio.

• Supervise and ensure the safe operation of cranes, positioning and turning of loads, weight

estimation and special lifts.

• Preparing PTW for daily scopes.

• Preparing daily time sheet for rigging group

ADNOC Classification: Need-To-Know

Jan 2017 TO May 2017 Kuwait oil company KUWAIT {Penta Global

Engineering}

LEAD RIGGER

Projects onshore campaign, project & maintenance

Role:

• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.

• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of

workers and material handled, using hard signal or radio.

• Supervise and ensure the safe operation of cranes, positioning and turning of loads, weight

estimation and special lifts.

• Preparing PTW for daily scopes.

• Preparing daily time sheet for rigging group

Sep 2016 TO Dec 2016 Equate petrochemical KUWAIT {STS

Engineering}

LEAD Rigger

Projects onshore campaign, Turn around shut down &

maintenance

Role:

• Carryout daily task as per planned schedule.

• Visual inspection of lifting gears and equipment’s before and after the job

• Attending Toolbox Talk

• Ensuring color coding of lifting gears and equipment’s

• Allocating jobs to rigging teams

• Spotting out Hazards and taking control measures for that

• Making sure that warning tapes and sign boards are in place at working area

• Inspecting ground level for crane setting

• Checking all certificates are valid prior to start the task

ADNOC Classification: Need-To-Know

Apr 2016 TO Aug 2016 QATAR GAS QATAR {Descon Engineering}

Rigger

Projects onshore campaign, Turn around shut down &

maintenance

Role:

• Carryout daily task as per planned schedule.

• Visual inspection of lifting gears and equipment’s before and after the job

• Attending Toolbox Talk

• Ensuring color coding of lifting gears and equipment’s

• Allocating jobs to rigging teams

• Spotting out Hazards and taking control measures for that

• Making sure that warning tapes and sign boards are in place at working area

• Inspecting ground level for crane setting

• Checking all certificates are valid prior to start the task

Mar 2015 TO Jan 2016 DP WORLD CHENNAI {JM BOXI Engineering}

Rigging foreman

Projects Chennai container terminal

Role:

• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.

• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of

workers and material handled, using hard signal or radio.

• Supervise and ensure the safe operation of cranes, positioning and turning of loads, weight

estimation and special lifts.

• Preparing PTW for daily scopes.

• Preparing daily time sheet for rigging group

June 2013 TO Jan 2015 Kuwait National oil company KUWAIT {Gulf spic

Engineering}

Rigger

Projects onshore campaign, project & maintenance

ADNOC Classification: Need-To-Know

Role:

• Carryout daily task as per planned schedule.

• Visual inspection of lifting gears and equipment’s before and after the job

• Attending Toolbox Talk

• Ensuring color coding of lifting gears and equipment’s

• Allocating jobs to rigging teams

• Spotting out Hazards and taking control measures for that

• Making sure that warning tapes and sign boards are in place at working area

• Inspecting ground level for crane setting

• Checking all certificates are valid prior to start the task

Mar 2011 TO Jan 2013 DP WORLD CHENNAI {JM BOXI Engineering}

Rigging foreman

Projects Chennai container terminal

Role:

• Coordinate day-to-day works to the rigger and assist to them for any rigging /lifting activities.

• Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of

workers and material handled, using hard signal or radio.

• Supervise and ensure the safe operation of cranes, positioning and turning of loads, weight

estimation and special lifts.

• Preparing PTW for daily scopes.

• Preparing daily time sheet for rigging group

Aug 2007 TO Jan 2011 Bahrain petroleum company {Chapo

Engineering} Rigger

Projects onshore campaign, project & maintenance

Role:

• Carryout daily task as per planned schedule.

• Visual inspection of lifting gears and equipment’s before and after the job

• Attending Toolbox Talk

• Ensuring color coding of lifting gears and equipment’s

• Allocating jobs to rigging teams

• Spotting out Hazards and taking control measures for that

• Making sure that warning tapes and sign boards are in place at working area

• Inspecting ground level for crane setting

• Checking all certificates are valid prior to start the task

ADNOC Classification: Need-To-Know

June 2005 TO July 2007 DP WORLD CHENNAI {JM BOXI Engineering}

Rigger

Projects Chennai container terminal

Role:

• Carryout daily task as per planned schedule.

• Visual inspection of lifting gears and equipment’s before and after the job

• Attending Toolbox Talk

• Ensuring color coding of lifting gears and equipment’s

• Allocating jobs to rigging teams

• Spotting out Hazards and taking control measures for that

• Making sure that warning tapes and sign boards are in place at working area

• Inspecting ground level for crane setting

• Checking all certificates are valid prior to start the task



Contact this candidate