Post Job Free
Sign in

Artificial Lift Oracle Database

Location:
Spring, TX
Posted:
July 22, 2023

Contact this candidate

Resume:

Rolla Long III

**** ******* **. 713-***-**** cell

Houston, Texas 77063 ****.*****@*****.***

Petroleum Engineer / Geologist

Oil field professional with 27+ years of field/asset engineering, field geology, and data/database management.

Career Progression

ATLAS OPERATING, LLC. – Houston, TX. . (02/2021 – 04/2011)

Engineer

Review SI / TA wells - determine reason down and look for uphole potential

Build and submit SWD well applications

Write AFEs and procedures for recompletions

ROVIG MINERALS – Thibodaux, LA. (Fall / Winter 2018)

Consulting Engineer (Contract Role)

Generated drilling, workover and completion procedures.

Built and maintained WBSs schematics and electronic well filing system.

Managed regulatory filings/compliance required by the LDNR and LDEQ for the company.

TEMA OIL AND GAS COMPANY – Houston, TX. (2011 – 2017)

Production Engineer

Managed all state / federal regulatory filings for company

Managed the San Andres waterflood in Cochran Co Texas – 150 wells, 350 bopd, 10,000 bwipd

Responsibilities:

owaterflood problem solving

orod string designs, AFE generation, and state / federal regulatory compliance

oassisted company go public

Implemented, and maintained OFM and IHS Harmony DeclinePlus surveillance software

Worked with 3rd party vendors to roll out Enertia accounting production module and WellEZ daily reporting system

OCCIDENTIAL PETROLEUM CORPORATION – Houston, TX. (2008 – 2011)

Senior Engineering Specialist

Artificial Lift – Wasson San Andres / Wasson Clearfork

oRCFA for rod pumping wells

oBuilt and maintained Oracle SQL procedures to generate data for statistical analysis on rod pump failures.

Managed production and well data for engineering group.

Supported engineering group in bi-annual well review process.

HALLIBURTON OIL COMPANY – Houston, TX. (1996 – 2008)

Data Administrator

Responsibilies

oschema synchronization between master Oracle database and field engineer’s databases

oupdated data from master Oracle database to field engineer’s databases

oQC on 30% of the 1800 tables in our relational database

odeveloped SQL scripts for importing and storing all production and well data for all United States wells

oP2000 system rollout

MEWBOURNE OIL COMPANY – Perryton, TX. / Woodward, OK. / Tyler, TX. / Midland, TX. (1990 – 1996)

Production / Reservoir Engineer

Managed 50 well field in Roger Mills County (Cleveland)

Worked in gas flood / cycling field in Ellis County; injecting 10 MMSCF of dry gas at 5,000 psig with oil production of 400 bopd

Responsibilities:

oManaged rod string / gas lift / plunger designs, installation of artificial lift

oDesigned cathodic protection for company and resolved all casing leak problems

oDesigned waterflood

oMaintained computerized production data for all field offices

oAFE generation, LOE monitoring, invoice signing, and budgeting generations

CHEVRON OIL COMPANY – Taft, CA. (Summer 1989)

Summer Engineering Intern

Evaluated and presented design for heavy oil sands heat stimulatioin for the Midway Sunset Field

SSM PARTNERSHIPS / MONROE WELL SERVICE – Shreveport, LA. (1984 – 1986)

Geologist

Supervised 4 company and 5 contract drilling rigs and all crews.

Responsibilies:

oselected drill sites

omanaging drilling and logging schedules

ohandled all regulatory permitting

Education

Bachelor of Science in Petroleum Engineering

THE UNIVERSITY OF TEXAS – Austin, Texas – Graduated 1990

Bachelor of Science - Geology

CENTENARY COLLEGE OF LOUISIANA – Shreveport, Louisiana – Graduated 1984

Areas of expertise:

Artificial lift and RCFA

Workovers, completions, and production surveillance

Log interpretation

Data and database management

Regulatory compliance

Software:

SQL plus

MS suite

IHS Harmony DeclinePlus

OFM

Aries (Aries Fundamentals - Oct 2019)

WellEZ

SRod

SAP

Rodstar

Enertia

Spotfire



Contact this candidate