Post Job Free
Sign in

Navi Mumbai Project

Location:
Mumbai, Maharashtra, India
Salary:
100 dollars usd par day
Posted:
July 20, 2023

Contact this candidate

Resume:

CURRICULAM VITAE

SUBJECT: APPLICATION OF THE POST OF MARINE RIGGER

GURWINDER SINGH

CONTACT NO: +91-981*******, +919*********

EMAIL ID: **********@*****.***

EDUCATIONAL QUALIFICATION: 10THPASSED

PERSONAL INFORMATION / DOSSIER

NAME

GURWINDER SINGH

FATHERS NAME

HARJINDER SINGH

DATE OF BIRTH

02-03-1992

ADDRESS

VILLAGE - SANDALPUR, DIST: GURDASPUR, TEH: BATALA

NATIONALITY

INDIAN, SIKH

CIVIL STATUS

UNMARRIED

BLOOD GROUP

A+ POSITIVE

HEIGHT

05 FT 09 INCH (172 CM)

LANGUAGE KNOWN

ENGLISH, HINDI & PUNJABI

DOCUMENTS NO

CERTIFICATES NO

PLACE OF ISSUE

DATE OF ISSUE

DATE OF EXPIRY

PASSPORT

R1338516

JALANDHAR

19.06.2017

18.06.2027

T BOSIET

514555012306214396

ENERTECH QATAR

21.06.2021

22.06.2025

H2S/ BA

258839

VANCHER GULF QATAR

19/12/2022

18/12/2024

CONFINED SPACE ENTRY

53230621A7016

ENERTECH QATAR

23/06/2021

22.06.2023

RIGGING & SLINGING STAGE -1

049**********

ENERMECH QATAR

24/12/2022

23/12/2024

RIGGER STAGE 3

2923

(ENERMECH)

23/03/2022

22/03/2024

BANKSMAN STAGE 3

2924

UK(ENERMECH)

25/03/2022

24/03/2024

FRC

GIME/MUM/FRC/22K/003

MUMBAI

14/12/2022

13/12/2027

PANAMA PDE

MACC/GIRIK/PDE

MUMBAI

15/12/2022

N/A

DGA

9545344

QATAR

20/12/2022

19/12/2024

HOIT

45525

QATAR

21/12/2022

N/A

HERTM

45773

QATAR

26/12/2022

25/12/2024

YELLOW FEVER

19625

MUMBAI

07/10/2022

UNLIMITED

TUV (3RD PARTY)

CLEDQ-21-MD662

QATAR

26.06.2022

25.06.2024

STCW (BST)

2203219

NAVI MUMBAI

19/09/2022

18/09/2027

STSDSD(STCW)

220351

NAVI MUMBAI

19/09/2022

18/09/2027

CDC

P230957

MUMBAI

24/05/2022

24/05/2027

EXPERIENCE

Total 11 Year’s career as a Riggers

Organization -: ATLANTIC MARITIME GROUP FZE

DURATION -: 18/12/2022 TO 13/03/2023

Designation -: AB/ RIGGER

PROJECT -: WORK AS A AOS MONITOR 1 IS JACK UP BARGE, KNOW WORK AT NOC AL SHAHEEN OIL FIELD QATAR SUPPORT ACCOMMODATION BARGE CRANE CAPACITY IS 190 TON AND ONE SMALL CRAN IS 50 TON

Organization: - TECHNIPFMC UK WORLD WIDE (Kuiper Singapore)

Duration: 13/01/2022 To 20/07/2022

Designation: LEAD RIGGER

Project : - WORKED AS A DEEP ORIENT ROV VESSEL IN 10’ IN AND 8’ FLEXIBLE PIPE LAY

TYPE OF REELS PROJECT IS MJ1 RELIANCE IN KAKINADA (INDIA)

Organization: DOHA PETROLEUM (QATAR PETROLEUM)

Duration: 06.06.2021 TO 22/12/2021

Designation: MARINE RIGGER

PROJECT WORKING AT PS1 PALTFORM NEW PIPELINE INSTALLATION QATAR

PETROLEUM (GMS EVOLUTION BARGE 200 TON CRAIN)

A)Organization : ADSUN OFFSHORE DIVING CONSTRUCTION PVT LTD

Duration : 09.10.2020 TO 07.04.2021

Designation: RIGGER FORMAN

Project: PIPELINE REPLACEMENT PROJECT-6 &HRP-III / C8MFP

WORK SCOPE

ASSISTED IN CROSSING CORRECTION AND FREE SPAN CORRECTION OF PIPELINE BY

GROUTING

ASSISTED IN RISER CLAMP ON JOB

ASSISTED IN SPRU / SPOOL TIE- IN INSTALLATION

ASSISTED IN SSIV LEAK ARRESTING OPERATION

ASSISTED IN OL-7 LATERAL SURVEY

ASSISTED IN IN TOP UP GROUTING OF HM JACKET BG SKIRT PILE SLEEVE GROUTING

B)Organization : NICO INTERNATIONAL(TAPCO)

Duration : 27.10.2019 TO 25.12.2019

Designation: RIGGER

Project: RAPRING IN GAS TURBINE

C)Organization : SWIRE PACIFIC OFFSHORE RIGGER

Duration : 25.02.2019 TO 12.04.2019

Designation: RIGGER

Project : MCDERMOTT CHARTER, PIPE LAYING KAKINADA, OFFSHORE & PIPE LINE PROJECT AT USE CRANE 2000 TON LIFTING IN 42’ INCHES PIPELINE.25 KILOMETRES

D)Organization : OCENUS ENGINEERING (AHMIC)

Duration : 27.10.2018 TO 10.01.2019

Designation: RIGGER

Project: WORKED IN ARZANA ISLAND CUTTING TO OLD N MAN JB11 JACK UP BARGE USE CRANE 1000 TON

E) Organization: DAS OFFSHORE ENGINEERING PVT LTD

Duration : 27.10.2018 TO 25.02.2018

Designation : RIGGER

Project: WORKED AS BARGE GAL CONSTRUCTOR SITE PANNA PLATFORM BOMBAY HIGH

E)Organization : MATHEW ASSOCIATES HOOKUP & WELD SERVICES OFFSHORE

Duration : 07.09.2016 TO 12.04.2017

Designation : RIGGER

Project: WORKED AS BARGE GAL CONSTRUCTOR IN PLATFORM NQRC

F)Organization : OFFSHORE MARINE TECH

Duration : 07.12.2015 TO 06.06.2016

Designation : RIGGER

Project : NORTH FIELD NHAVA, HELIBASE MHN PLATFORM

G)Organization : MATHEW ASSOCIATES HOOKUP & WELD SERVICES OFFSHORE

Duration : 19.10.2013 TO 27.07.2014

Designation : RIGGER

Project : WORKED AS BLQ2 PLATEFORM ONGC BOMBAY HIGH WORKING PIPE LINE

H)Organization : MATHEW ASSOCIATES HOOKUP & WELD SERVICES OFFSHORE

Duration : 25.09.2012 TO 22.08.2013

Designation : RIGGER

Project : WORKED AS BLQ1 PLATEFORM ONGC BOMBAY HIGH WORKING PIPE LINE

I)Organization : MATHEW ASSOCIATES HOOKUP & WELD SERVICES OFFSHORE

Duration : 05.09.2011 TO 02.06.2012

Designation : RIGGER

Project : PROJECT ONGC BARGE GAL CONSTRUCTOR PROJECT / NEELAM REDEVELOPMENT & B17 AC

GURWINDER SINGH



Contact this candidate