EDUCATION
DESCON TECHNICAL INSTITUTE, LAHORE JUNE 2017 – - SEP 2017
DESCON LAHORE
Electrical Course
SINAH INSTITUTE OF NETWORKS AND JULY 2015 - DEC 2015
AESTHETICS,ISLAMABAD NTB ISLAMABAD
Diploma of PLC & SCADA
USMAN ALI JINNAH INSTITUTE OF TECHNOLOGY, VEHARI AUG 2011 - AUG 2014
ELECTRICAL TECHNICIAN PBTE LAHORE BOARD
Diploma of Associate Engineering
GOVT ISLAMIA HIGH SCHOOL GARHA MORE, VEHARI MAR 2007 - MAR 2009
27-04-1991
BISE MULTAN
Male S.S.C MATRICULATION
adyeuw@r.postjobfree.com WORK EXPERIENCE
P.O BOX Chak # 88WB
SRACO SAUDI ARABIA 07/2019 - TILL NOW
RX1815072 Electrical Technician
Worked in Sabic Plants in JUBAIL
Working in SAUDI KAYAN Petrochemical Company
OBJECTIVE Worked in EASTREN Petrochemical Company SHARQ
Worked in Al-Bayroni Fertilizer Company\
Inspired and highly adaptable
Worked in SAFCO Fertilizer Company
professional having more than 7 years
Worked in Saudi Iron & Steel Co. (Hadeed)
experience ofmulticultural and
All kind of installation of Substation Electrical Equipment and components
multinational organizations in
● Installation of wiring systems and control panels
Pakistan, Qatar and Saudi Arabia as
● Installation and commissioning of MCC, LP and PP panels
anElectrical Technician.
● Installation of all kind of switch gear
● Installation of lighting system and grounding system
SKILLS ● Installation and commissioning of transformers
● Repair and replace defective components in motors, controllers, storage
Building purification tests
batteries,switchboards, conductors, switches and varied electrical fixtures
● Perform Corrective and Planned Maintenance on Motors, Lighting systems and Panels
Installation of Grounding, UPS System
Install improvements and major upgrades to electrical plants and subsystems
● Design and modify motor power control apparatus circuits
Measurement of Voltage and Current ● Read single line, schematics and wiring diagrams
● Preventive maintenance & Corrective maintenance
Installation of Switchgear ● Maintenance of lighting
● ACB & VCB rack in rack out
Installation of Three Phase Wiring ● Perform IR, WR & DLR mega test and earthing system test
● Worked on proximity sensor & limit switch
Installation of Single Phase Wiring ● I AM STILL WORKING IN MAINTENANCE
DESCON ENGINEERING QATAR L.L.C, QATAR 03/2018 - 05/2019
Drawings & Diagrams
Electrical Technician
Meggering Worked on DOLPHIN Energy
Repair and replace defective components in motors, controllers
Perform Corrective and Planned Maintenance of Motors, transformers, Panels andLighting
Protection of Electrical Networks
systems
Perform corrective and planned maintenance of grounding systems
Making/Installation STAR DELTA
Worked on SIEMENSE TRAM Consortium
circuits Installation of compressor panels
Installation and Termination of RJ45 Adapter
INTREST
Reading books ORIENT ELECTRONICS, PAKISTAN 01/2017 - 04/2017
Electrical Technician
Travelling
Troubleshooting of electrical faults on Motors and Panels
Sports Troubleshooting of electrical faults on lighting systems
Maintenance of grounding systems and lighting system
Installation of motor starters,DOL, F/R, Star Delta
CENTURY PAPER MILLS, PAKISTAN 07/2015 - – 12/2016
Electrical Technician
Carry out routine checks, troubleshoots (depend on competency level) fault on electrical
equipment and distribution systems determines and reports best method of repair or required
action to Supervisor.
Isolate power supply in accordance with procedures, check fuse and calibration including high
voltage protection.
Installs and modifies new electrical systems and equipment as directed and undertake
workshop testing, replacement, repair and reconditioning of electrical items and components
using tools and test equipment’s.
Making new penal, controlling circuits, spread transmission lines, installation of Motors &
VFD or VSD etc.
Implement preventive maintenance programs for electrical equipment’s systems and network
in accordance with established schedule and instructions from Supervisor.
AGHA ELECTRICAL COMPANY, PAKISTAN 12/2014 - –06/2015
Electrical Technician
Trouble shooting of substation.
Responsible for maintenance, erection, overhauling of electrical penal etc
Resolving of complains in boiler & process house.
Making new penal, controlling circuits, spread transmission lines, installation of Motors &
VFD or VSD etc.
Responsible of manual maintain power factor.
Complete working of routine & shutdown maintenance.
Trouble shooting of PLC & relays controllers etc.
Installation of inverters & sensors like a (photo sensor, proximity sensor, transmitter receiver,
temperature sensor)
.Doing the preventive maintenances and Shutdown maintenances of Electrical Equipment in
EPC-3 &4 Plant
.Troubleshooting of MCC and some Energize De Energize.• Responsible for LT panels, service
and maintenance.
,Electrical Panel Cable Gland and Termination.
LANGUAGE
English, Urdu
REFERENCES
Reference available upon request