Issue Date: ** JUNE, ****

Elnabawy Ragheb Abdelfattah Akl

Pre-Commissioning & Commissioning Manager

Telephones: +201*********+201*********+202******** Emails: adycxz@r.postjobfree.com, adycxz@r.postjobfree.com & adycxz@r.postjobfree.com PERSONAL DATA

DATE OF BIRTH :

NATIONALITY :

EDUCATION :

QUALIFICATIONS :

MEMBERSHIPS :

FIELDS OF EXPERIENCE

14 years of experience in ENPPI “Engineering for The Petroleum and Process Industries” in the petroleum sector industry in the field of Pre-Commissioning, Commissioning & Start-up of oil & gas and petrochemical Onshore and Offshore projects in Egypt, Iraq and Saudi Arabia (ARAMCO). WORK HISTORY

ENPPI “ENGINEERING FOR THE PETROLEUM AND PROCESS INDUSTRIES” From 2010 to 2017 Working as Pre-commissioning & Commissioning Engineer From 2018 to present Working as Pre-commissioning & Commissioning Manager Duties and responsibilities:

• Preparation of scope and the responsibilities for Commissioning and Start-up activities and pre- Commissioning & Start-up plan.

• Prepare the commissioning and Start-up Strategy, contract requirements, initial budgeting and manning profiles during the front-end phase of all global projects.

• Define the organization chart and necessary resources for Commissioning and Start-up Phase / activities.

• Provide Commissioning's and Start-up input to Project Master Schedule and vendor mobilization plan.

• Establish Commissioning's input to relevant contracts and participate in the evaluation of submitted tenders.

• Identification of systems and sub-systems by marking up of PFD’s and PID’s – system definition.

• Lead and Co-ordinate the completions commissioning Software “Go Completions” process.

• Manage / supervise the database preparation and equipment ITR matrix as per the commissioning requirements. Update of CMS database with all deliverables. Ensure all equipment has been allocated with the correct check sheets as per ITR Matrix / Commissioning dept.

• Assist / Guide construction departments by defining priority systems according with overall construction and pre-commissioning & commissioning planning and schedule. Participate in constructability analyses in order to meet project schedule.

• Manage / Supervise the pre-commissioning and commissioning activities as lube oil flushing, chemical cleaning and piping leak test, steam blowing.

July 30, 1984

Egyptian

B.Sc. in Petroleum Engineering – Mining and

Petroleum Department – Al-Azhar University (2009)

Pre-Commissioning,Commissioning & Start-up Manager Member of Egyptian Syndicate of Engineers

Issue Date: 20 JUNE, 2023

• Co-ordinate with the Engineering discipline to response on the contractor TQ’s and ensure all changes already implemented by construction contractor on site.

• Preparation of Commissioning and start-up execution plan; development of planning and scheduling of Commissioning and Start-up plan for entire projects and integration with Client planning for commissioning and start-up

• Participate in System walk down and punch list Generation and exception list for handover.

• Manage / lead system walkthrough with the construction contractor and company (Client)

• Monitor and follow-up Punch list clearance and close out.

• Participate in safety stand downs, safety site visits.

• Review Mechanical Completion Certificates (MCC), Ready Of Commissioning(RFC), Ready for start- up certificate (RFSU) and Handover Dossiers.

• Plan and supervise activities of deployed resources for smooth and proper commissioning and start-up activities.

• Participate with the operation team during PSSR walk down prior start-up for the systems.

• Coordinate with other engineering disciplines to ensure the sequential readiness as per the commissioning plan to ensure smooth commissioning and Start-up.

• Commissioning and equipment testing being executed according to programs and specifications.

• Manages and resolves defects during the commissioning and start-up process in a timely manner prior to and after take-over by the District.

• Serves as a primary liaison with Operation and Maintenance throughout the commissioning and Start- up process

• Review Lot-OUT / Tag-Out and PTW cycle during commissioning and Start-up Phase

• Work closely with project managers, clients, vendors, and other stakeholders to ensure smooth commissioning, Start-up and handover of the project.

• Execute timely and tidy activities in connection with transfer of operational and maintenance responsibilities from Project to Operations of all systems (RFO). Projects:

Assigned as “Commissioning & Start-up Leader” for the following projects:

- Egyptian Natural Gas

Company

(GASCO), 2010

Project: Maximization of C2/C3 Western Desert Gas Plant (ALEXANDRIA – EGYPT).

Job Title: Pre-commissioning & Commissioning Engineer Project Description: The project aims to maximize C2 & C3 recovery in the Western Desert Gas Complex

The project was executed in three phases; the 1st tends to reach a production of 600 million standard cubic feet per day, the 2nd stage tends to reach a production of 800 million standard cubic feet per day, and finally to reach by the 3rd phase a total production of 900 million standard cubic feet per day. Issue Date: 20 JUNE, 2023

- BURULLUS GAS

COMPANY (BGC),

2011

Project: PHASE VII MAIN COMPRESSION PROJECT (ALEX – EGYPT). Job Title: Pre-commissioning & Commissioning Engineer Project Description: In order to increase the plant capacity, BURULLUS intends to build five new compressors, in addition to the supporting utilities and Feed & Product storage & handling facilities.

- Egyptian Styrenics

Production Company

(E-Styrenics), 2012

Project: 200,000 MTA Polystyrene Plant (ALEX – EGYPT). Job Title: Pre-Commissioning & Commissioning Engineer Project Description: The new 200,000 tons/year polystyrene unit produces high impact and general-purpose high-quality grades of polystyrene, in addition to the supporting utilities and Feed & Product storage & handling facilities.

- Pharaonic Petroleum

Company (PhPC/BP)

2013 & 2014

Project: West Harbor Expansion

Job Title: Pre-commissioning & Commissioning

Project Description: The project aims to expand West Harbor facility, which is currently processing 280 MMSCFD from Ha’py and 265 MMSCFD from Taurt fields; by providing an additional HP stage Compression Train and Expand the plant design capacity to 585 MMSCFD

- PETROCHINA, Iraq,

2014

Project: Missan Crude OIL EXPORT PIPLINE (MOEP) (Missan – IRAQ) Job Title: PMC Pre-commissioning & Commissioning Engineer Project Description: Missan Crude Oil Export Pipeline (MOEP) Project consists of 272 km onshore export crude oil pipeline development in Iraq. There are 5 Cathodic Protection (CP) stations and 14 Block Valve Stations (BVS’s) along 272 km pipeline. This project is from Junction Point (JP) Pigging Station to Fao Terminal Station.

- Khalda Petroleum

Company (KPC) /

Apache (Egypt), 2015

Project: Qasr gas compression station (WESTERN DESERT - EGYPT). Job Title: Pre-commissioning & Commissioning Engineer Project Description: The project will add pressure boosting facilities (Turbo- Gas Compressor) and associated utilities to the existing Qasr, start-of-line (SOL) Plant located in the Egyptian Western Desert.

- The Egyptian

Ethylene and

Derivatives

Company

(ETHYDCO), 2015

Project: New Ethylene & Butadiene Plant 460,000 Ton/Y (ALEX-EGYPT) Job Title: Pre-commissioning & Commissioning lead Engineer Project Description: The project aims to execution of the EPC scope of work of the 460 KTA Ethylene and 20 KTA Butadiene project at Amerya in Alexandria, Egypt.

- The Egyptian Ethylene

and Derivatives

Company

(ETHYDCO), 2016

Project: New Polyethylene Plant 400,000 Mt/Y (ALEX-EGYPT) Job Title: Pre-commissioning & Commissioning Engineer Project Description: The project aims to building a Polyethylene plant in Alexandria with a Total capacity of 400 KTA, Linear Low-Density Polyethylene

(LLDPE) and High-Density Polyethylene (HDPE) Through two trains of a capacity 200 KTA each, using polymer grade ethylene as feed stock.

- PETROBEL,2017

Offshore

Project: ZOHR OFFSHORE CCP TOPSIDE FACILITIES

Job Title: Pre-commissioning & Commissioning Engineer Project Description: The ZOHR Offshore - CCP Topside Facilities Project consists of new Offshore Central Control Platform topside facilities represented in four types of chemical injection skids Issue Date: 20 JUNE, 2023

- Alexandria National

Refining &

Petrochemicals

Company

(ANRPC),2017

Project: NEW CCR & PLATFORMING UNIT (ALEX-EGYPT)

Job Title: Pre-commissioning & Commissioning Leader Project Description: a new CCR & Platforming Unit is designed to process 604,000 T/Y of Hydro-treated Heavy Naphtha from the existing Naphtha Hydro-treating Units to produce the following:

- Reformate with high Octane number (RON 100) utilized in the production of various types of gasoline, stabilized LPG & Hydrogen which will be utilized in downstream future processing facilities

- Arab Petroleum

Pipelines Co.

(SUMED), 2018

Project: AIN SUKHNA PRODUCT HUB (ASPH) LOT-II TANK FARM AND TOP SIDE FACILITIES.

Job Title: Pre-commissioning & Commissioning Leader Project Description: The hub consists of both onshore and offshore facilities as the following:

- Fuel Oil Marine Loading Arms / Pig Launcher / Receiver, 6 Fuel Oil storage tanks, Gas Oil tank, Cutter stock storage tank & Utilities required for the Fuel Oil Storage

- Assiut Oil Refining

Company (ASORC),

2019/2020

Project: Naphtha Complex Project

Job Title: Pre-commissioning & Commissioning leader Project Description: The new Naphtha Complex is designed to Produce High Octane Number Isomerate and Reformate.

The new Naphtha Complex will include Naphtha Hydrotreating, Naphtha Splitting, Light Naphtha Isomerization, Heavy Naphtha Reforming, CCR units and associated Utilities & Off sites.

- ARAMCO KSA,

Safaniyah Plant

2020

Project: Upgrade Desalinated Water Treatment At Safaniyah Plant Job Title: Pre-Commissioning & Commissioning Manager Project Description: The purpose of the Project is to provide SONPD with desalinated water by installing a new RO plant, deaerator package, storage tanks and pumps at SAFANIYAH to meet the 2016 increased MSC water demand of 1,610 GPM and to minimize SONPD’s dependence upon Tanajib RO plant.

- ARAMCO KSA,

SHEDGUM Gas

Plant - Steam Turbine

Generator Project

2021,2022 & 2023

Project: SHEDGUM Steam Turbine Generator Project

Job Title: Pre-Commissioning & Commissioning Manager Project Description: The purpose of this project is to support Saudi Aramco’s corporate strategy to maximize company energy efficiency. This project will improve the power and steam generation efficiency of Shedgum Gas Plant (SGP). This project install one (1) 81.6 MW (Based on vendor Guarantee Case) condensing / induction steam turbine generator (STG) to utilize excess HP and LP steam, and generate electric power

- GASCO, Egypt

Dahshour Gas

Compression Station,

April 2023 to present.

Project: GASCO, Dahshour Gas Compression Station Train 5 & 6. Job Title: Pre-Commissioning & Commissioning Manager Project Description: Installing of the two new Compressor units are consisting of the following:

•Unit 5: consists of Gas turbine driven Compressor train E (326.3 MMscfd).

•Unit 6: consists of two electric motor driven compressors trains F&G

(each 163.15 MMscfd).In addition to, Five Waste Heat Recovery Units

(W.H.R) shall be installed at the outlet of each gas turbine a long with Organic Rankine Cycle (ORC) System to recover the heat from the exhaust of Gas Turbines

Issue Date: 20 JUNE, 2023

PROFESSIONAL TRAINING

- Middle East Oil Refining (MIDOR) Site Training 2014

- Time Management 2016

- Alexandria Mineral Oils Co. (AMOC) Site Training 2017

- Energy Isolation Awareness Session 2017

- Acid Gas Treatment and Sulfur Recovery Technology 2017

- Ms Excel 2010 (Advanced) 2019

- Basic Offshore Safety Induction and Emergency Training (BOSIET) 2023 LANGUAGE SKILLS

- Arabic : Mother tongue.

- English : Very good.

COMPUTER SKILLS

-Microsoft Office (Word, Excel, and PowerPoint).

-Enppi’s ECMS (Enppi Completion Management System).

-ICAPS & OPERCOM

-ARAMCO’s MPCS (Mechanical Performance & Close Out System).

-Go Completions Software & CCMS

-Technip’s IntelliPID & EASYPLANT.

-Thyssenkrupp Co-Console

PERSONAL SKILLS

- Strong leadership and managerial skills

- Excellent communication and interpersonal skills

- Detail-oriented and quality-focused

- Analytical and problem-solving skills

- Ability to work under pressure and meet deadlines.

- BOSIET & HUET Certificates Valid up to June 2027

- Offshore Medical Fit Certificate valid up to June 2025



Contact this candidate