Post Job Free

Resume

Sign in

Fire Protection C S

Location:
San Juan, Philippines
Posted:
August 28, 2023

Contact this candidate

Resume:

RESUME

POSITION SOUGHT : Foreman

PERSONAL INFORMATION :

FULLNAME : Tito Tubalado Plagtiosa

CIVIL STATUS : Married

GENDER : Male

DATE OF BIRTH : October 18, 1970

PLACE OF BIRTH : Bulubugan, Pinamungajan, Cebu

CONTACT NUMBER : 095******** / 096********

CONTACT ADDRESS : #166 Cleofer St. Brgy 162, Sta. Quiteria, Caloocan City SSS : 06-1264698-8

PAG-IBIG : 121*-****-****

PHILHEALTH : 19-052153567-2

TIN : 149-885-308-00000

EDUCATIONAL ATTAINMENT

COLLEGE : Cebu Institute of Technology (C.I.T. Campus) N. Balasco Avenue Cebu City

DEGREE : Bachelor of Science in Metallurgical Engineering DATE : 1991-1993

WORK EXPERIENCE

With solid experience of 18 years from some of leading EPCM (Engineering, Procurement & Cons. Management) companies as piping foreman.

OVERSEAS EXPERIENCE : 7.3 years

LOCAL EXPERIENCE : 10.4 years

JOB DESCRIPTION:

Supervise and coordinate activities of works engaged in fabricating, assembling and installing the piping works.

• Study construction schedule and estimates work. Hour requirements for completion of job assignments.

• Interpret specifications, blueprints and job orders to works and assigns duties.

• Establish or adjust work procedures to meet schedules.

• Recommended measures to improve productivity and quality of work performed.

• Analyze and resolve work problems or assists worker in resolution.

• Initiate or suggest plans to motivate workers to achieve project goals.

• Recommend or initiate personnel actions such as promotions, transfers, discharges and disciplinary measures.

• Maintain time and productivity records except rainy days.

• May inspect, estimate and requisition materials. WORK EXPERIENCE

• General Foreman

SSBN Construction Inc. May 28, 2019 to February 17, 2022 Mechanical Conversion Plant

JOB RESPONSIBILITIES:

• Planning, scheduling, coordinates and supervises the work of overall and monitor the other foreman we're working on site.

SCOPE OF WORKS:

• Fabricate of steel columns, steel beams & steel truss.

• Erection of steel columns and steel beams.

• Fabricate and install of pipe spool header and branches for airline & water line.

• Fabricate and install of pipe spool for oil separator.

• Fabricate and install of pipeline for fire protection.

• Plumbing Foreman

BESCO Clark Phil. Group of Companies May 31, 2016 to April 29, 2018 Multi Story Hotel & Casino (Clark, Pampanga Phil.) JOB RESPONSIBILITIES

• Fabricate and install of fire protection line from Riser to Branch Line & Sprinkler Heads.

• Fabricate and install of 4" Ø pipe for water line Riser and to House Hold.

• Install of Sewer Line Header from roughing & finishing fixtures,

• Piping Foreman

Plant Engineering cons. Sept. 5, 2014 to April 14, 2015 PETRONAS Malaysia Oil Company

LEVEL 49 P1.01. Permata Sapura

Kuala Lumpur City, 50088 Kuala Lumpur Malaysia

JOB RESPONSIBILITES

• Fabricates of Boiler stack JIS SS41 Thickness 9~ 22mm Bottom 3 mo

Straight 3mo x 75m H

JIS SS41 I.o m x 100m H

2 sets 90 tons

• Fabricate of Flare stack JIS SS41

• Fabricate of casing of Air Fin Cooler Thickness 4.5 mm 144 tons

• Fabricate of Structure Steel for platform & ladders JIS SS41 Thickens 4.5 mm 144 tons

• Piping Foreman

Yuhan Tech. Phil, Inc. Nov. 13, 2013-June 13, 2014 Petron Refinery (RMP2) Project

Limay Bataan, Phil.

JOBS RESPONSIBILITIES:

• Layout, fabricate and erection of 16" Ø pipe sch. 100 for process gas.

• Layout, fabricate and erection, dragging and install of 18" Ø pipe sch. 120 for LPG process line.

• Layout, fabricate, erection, technical dragging and install of 14" alloy pipe for N2 gaseous header.

• Layout, fabricate, erection and install 12" CS. pipe for high steam, medium and low steam line process.

• Layout, fabricate and erection of stainless-steel storage tank for wastewater treatment plant.

• Piping Foreman

HILL INTERNATIONAL Sept. 12, 2012 to Sept. 14, 2013 ALMATY 1 COAL-FIRED Power Plant 120

MW ALMATY, KAZAKHSTAN

JOB RESPONSIBILITES:

• Layout & fabricate of Heat exchanger & oil cooler.

• Layout & fabricate of stainless-steel storage tank

• Layout & fabricate of circulating water piping.

• Fabricate of inner casing

• Fabricate outer casing

• Fabricate of oil tanks

• Fabricate of Bolle Buck

• Piping Foreman / Ship Repair Foreman

STK Singapore Takvada Pte. Ltd. May 16, 2011-July 07, 2012 Mitsui Engineering & Ship Building Co. Ltd. Co. LTD. JOBS RESPONSIBILITIES:

• Replacement of side frames side stringer, web frame and side shell plating.

• Replacement of frame bracket and Tank Top

• Replacement of stiffenen inter section, and deck-EDGE (TEE)

• Fabricate of super structure for Freedom vessels (ship plates 6 sets 180 tons)

• Fabricate and install of fire hose cabinet Line for fine protection

• Fabricate and install of lubrication oil piping

• Lead Man

Rizza Industrial Sales and Marine Services Dec. 2008-March 2009 Shipbuilding

JOBS RESPONSIBILITIES:

• Layout, fabricate of panel storage fittings

• Layout, fabricate of lubrication oil tank.

• Install of ramps for hatch cover 2,970L x 3,080W x 4,092 H, 4 sets 36 tons

• Supervision and working for LeadMan

• Piping Foreman

(STK) Singapore Takada Industry PTE LTD. July 5, 2003-Sept. 13, 2006 Petro Chemical Complex of Singapore P.CS. 1 and 2 (Singapore) JOBS RESPONSIBILITIES:

• Layout, fabricate and install of Heat Exchanger.

• Layout, fabricate of Low-Pressure Gas Separator Platform System

• Layout, fabricate and Assembly of Module

• Layout, fabricate and install of piping for high, medium and low steam line

• Fabricate, erection, install of oil storage tank.

• Commissioning of oil tank yard

• Piping Foreman

Meralco Industrial Eng'g Services Corp. (MIESCOR) July 9, 2002-April 21, 2003 Philippine Associated Smelting and Refining (PASAR) Shutdown Work JOBS RESPONSIBILITIES:

• Layout, fabricate and install of dust chamber 2.0 m 0.

• Layout, fabricate and install of screw conveyor casing and dust chamber.

• Layout, fabricate and install of hopper for smelting dept.

• Layout, fabricate of 8" pipe for sulfuric acid line.

• Replacement of acid tank 4.0 m Ø stainless steel 12 sets:

• Supervision and working foreman.

• Structural and Piping Foreman

Flowtech Construction Corporation May 14, 2000-June 16, 2001 Warehouse (Sharp Phil. Inc.)

JOBS RESPONSIBILITIES:

• Layout, fabricate, install of Steel truss and column.

• Layout, fabricate, install of 8" of pipe spool for riser main and feed main piping and cross main line.

• Scheduling of branch line, layout, fabricate & install

• Install of sprinkler heads pendent, upright and wall mounted.

• Install of fire pump 500 gallons per minute # 150 psi 3,500 R.P.M. 6.) Install of jockey pump vertical type 35 gallons per minute.

• Hydro testing and commissioning over all line & jockey pump.

• Piping Foreman

Standard Construction Heavy Equipment and Rebuilding Corp. (SCHERCO) Jan. 3-Aug. 26, 2000

(Cement Plant) Northern Cement Corp.

JOBS RESPONSIBILITIES:

• Layout, fabricate of multi-Cyclone, duct and expansion joints.

• Layout, fabricate and install of housing kiln, feed tanks, dust tanks, kiln shell & spray tower.

• Layout, fabricate and install of belt conveyor & silo tank.

• Acting Foreman

People's Asia Pacific Construction Corp Feb. 16-Nov. 19, 1999 Power Plant

JOBS RESPONSIBILITIES:

• Layout, fabricate and install of sea water piping.

• Build-up of Structural Steel beam for pipe rock, vertical and horizontal support.

• Layout, fabricate and install of stainless-steel tank pressurize & storage.

• Layout, fabricate and install of heat exchanger & oil cooler.

• Layout, fabricate and install of circulating water piping.

• Install of tube sheet for condenser unit phase I and III.

• Install of condenser unit 6m W x 5m H x 11m L: 190 tons.

• Monitor of 40 workforces in site.

• Supervision and working foreman.

• Fabrication Lead man

His Construction Oct. 14, 1997-Sept. 19, 1998

MWSS Water Pipe Line

JOBS RESPONSIBILITIES:

• Layout and fabricate of Steel truss and column.

• Layout, fabricate, install of 67 Ø Pipe Line for Branch.

• Supervision and working lead man

• Welder (S1)

D.M. Consunji Inc. Nov. 16, 1996-June 18, 1997

Shell Project (Batangas Philippines)

JOBS RESPONSIBILITIES:

• Welding of 8" pipe schedule 80 for gas line 6-G position and 5-G position.

• Welding of 6 pipe 5-G position for steam line.

• Welding of 12" pipe stainless 5-G position for flare line.



Contact this candidate